单选题You should slack the mooring lines ()when the wind is big.Aat the same timeBon timeCin timeDat times

单选题
You should slack the mooring lines ()when the wind is big.
A

at the same time

B

on time

C

in time

D

at times


参考解析

解析: 暂无解析

相关考题:

Would you please ____ the mooring lines ?A.adjustedB.adjustingC.adjustD.adjusts

A storm is forecast for the area where your vessel is moored. For its safety you should put ______.A.more slack in the mooring linesB.a strain on the mooring linesC.chafing gear on the mooring linesD.grease on the mooring lines

A fire is discovered in the bow of your vessel while making way. The wind is from ahead at 35 knots. You should ______.A.remain on course and hold speedB.remain on course but slack the speedC.change course to put the wind on either beam and increase speedD.change course and put the stern to the wind

A fire is discovered in the forepeak of a vessel at sea. The wind is from ahead at 35 knots. You should ______.A.remain on course and hold speedB.change course and put the stern to the windC.change course to put the wind on either beam and increase speedD.remain on course but slack the speed

In order to pay out or slack a mooring line which is under strain, you should ______.A.sluice the lineB.surge the lineC.stopper the lineD.slip the line

Would you please ()the mooring lines ?A、adjustedB、adjustingC、adjustD、adjusts

We must()the mooring lines when the tide rises and falls.A、slack awayB、take onC、take inD、adjust

This mooring line is a little slack. Please ()it.A、fastB、fastenC、slack awayD、slack

You should (松)()the mooring lines at the same time when the wind is big.A、fastenB、slackC、fastD、slacken

You should slack the mooring lines ()when the wind is big.A、at the same timeB、on timeC、in timeD、at times

They should take care of the (系泊缆绳)().A、head linesB、mooring linesC、breast linesD、stern lines

及时调整缆绳。()A、Adjust the mooring lines on time.B、Adjust the mooring lines in time.C、Adjust the mooring lines quickly.D、Adjust the mooring lines slowly.

单选题In order to pay out or slack a mooring line which is under strain,you should().Asluice the lineBsurge the lineCstopper the lineDslip the line

单选题We must()the mooring lines when the tide rises and falls.Aslack awayBtake onCtake inDadjust

单选题What is likely to occur when you are surging synthetic mooring lines on the gypsyhead during mooring operations?()AThe lines may jam and then jump off the gypsyheadBIf there is sudden strain on the line,the man tending the line may be pulled into the gypsyheadCThe lines' surging may cause the vessel to surgeDThe heat generated may cause the lines to temporarily fuse to the gypsyhead

单选题When reporting wind direction, you should give the direction in().Atrue degreesBmagnetic compass degreeCrelative degreesDisobaric degrees

单选题A Chinese stopper (two lines) will hold best when you().Afasten the bitter ends to the mooring line with half hitchesBtwist the ends together and hold them in the direction of the pullCtwist the ends together and hold them in the direction opposite to the pullDtwist the ends together and hold them at right angles to the mooring line

单选题You should slack the mooring lines ()when the wind is big.Aat the same timeBon timeCin timeDat times

单选题You should ()the mooring lines at the same time when the wind is big.AfastenBslackCfastDslacken

单选题You should adjust the mooring lines according to the changes of()(吃水).AwaterBdraftCtideDsea

单选题A fire is discovered in the forepeak of a vessel at sea. The wind is from ahead at 35 knots. You should().Aremain on course and hold speedBchange course and put the stern to the windCchange course to put the wind on either beam and increase speedDremain on course but slack the speed

单选题A fire is discovered in the bow of your vessel while making way. The wind is from ahead at 35 knots. You should().Aremain on course and hold speedBremain on course but slack the speedCchange course to put the wind on either beam and increase speedDchange course and put the stern to the wind

单选题When carrying out mooring trial, if the M√Ecan’t start normally, you should ()Atake a further inspection in the voyageBcheck and repair, then retrialCdo as the surveyor’s requirementDretrial

单选题When you keep a gangway watch, you should ()the mooring lines according to the rise and fall of the tide.AadjustedBadjustingCadjustsDadjust

单选题When picking up your mooring at the buoy,the correct method is to().Aapproach the buoy with the wind and current asternBapproach the buoy with the wind and current aheadCapproach the buoy with wind and sea abeamDstop upwind and up current and drift down on the buoy

单选题When you walk in a busy street, you should walk on the side _____.Awhere the wind is comingBwhere the wind is goingCwhere the wind is weakerDwhere the wind is stronger

单选题A storm is forecast for the area where your vessel is moored. For its safety you should put ().Amore slack in the mooring linesBa strain on the mooring linesCchafing gear on the mooring linesDgrease on the mooring lines

单选题When checking a mooring line,you should().Aensure the bight is not fouled between the ship and the dock by taking up slackBpay out slack smartly and keep free for runningCsecure more turns to hold the line against any strain,then clear the areaDsurge the line so that it maintains a strain without parting