单选题mainframe customer would like to receive a proposal for a mainframe storage system with 120 TB raw capacity. The mainframe server load is not too high, and they need hard disk drives with the lowest possible power consumption to keep operating costs low. The customer will not increase the capacity of their mainframe applications in the future but rather invest later into their System p servers. Which of the following solutions best meets these requirements at the lowest cost()Aoffer a DS8700 system with 600 GB FC drivesBoffer a DS8800 system with standard cabling and 600 GB SAS drivesCoffer a DS8800 system with business class cabling and 600 GB SAS drivesDoffer a DS8800 system with SATA drives
单选题
mainframe customer would like to receive a proposal for a mainframe storage system with 120 TB raw capacity. The mainframe server load is not too high, and they need hard disk drives with the lowest possible power consumption to keep operating costs low. The customer will not increase the capacity of their mainframe applications in the future but rather invest later into their System p servers. Which of the following solutions best meets these requirements at the lowest cost()
A
offer a DS8700 system with 600 GB FC drives
B
offer a DS8800 system with standard cabling and 600 GB SAS drives
C
offer a DS8800 system with business class cabling and 600 GB SAS drives
D
offer a DS8800 system with SATA drives
参考解析
解析:
暂无解析
相关考题:
Here is the dessert.()? A、Do you like someB、Would you like someC、Do you like thatD、Would you like that
One of our customers takes ( ) in the model 123, and we would like to receive a sample and quotation. A.prideB.pleasureC.interestD.consideration
Would you like to receive future () of everyday newsletter ?A、copiesB、copyC、duplicateD、replicates
An administrator is setting up a network and would like to prevent users from having the ability toplug their PC into the network to receive an IP address.Which of the following addressing schemes should the technician use?()A.NATB.DynamicC.SubnettingD.Static
A mainframe customer has requested a proposal to replace an existing storage system. Which information does Disk Magic provide?() A. logical volume sizesB. cache usage by applicationC. storage processor utilizationD. disk capacity needed forFlashCopy
Which of the following best describes why a customer would choose x86 server solutions over mid-range or mainframe solutions?()A、x86 servers are more reliable than mid-range and Mainframe servers.B、x86 servers require less support personnel.C、Microsoft Operating Systems require less maintenance than mid-range and Mainframe Operating Systems.D、x86 solutions cost less.
A mainframe customer would like to receive a proposal for a mainframe storage system with 120 TB raw capacity. The mainframe server load is not too high, and they need hard disk drives with the lowest possible power consumption to keep operating costs low. The customer will notincrease the capacity of their mainframe applications in the future but rather invest later into their System p servers. Which of the following solutions best meets these requirements at the lowest cost()A、offer a DS8700 system with 600 GB FC drivesB、offer a DS8800 system with standard cabling and 600 GB SAS drivesC、offer a DS8800 system with business class cabling and 600 GB SAS drivesD、offer a DS8800 system with SATA drives
A small business owner would like to start keeping track of the orders received on a WebSphere Commerce V5.6 site. The owner would like to receive an e-mail each time an order is completed. Which of the following subsystems should be configured to implement this requirement?()A、WebSphere MQB、WebSphere Commerce AcceleratorC、WebSphere PersonalizationD、MessagingE、Tivoli Policy Director
Company.com would like to share CPU resources between AIX V5.3 and Linux partitions. Which solution would best satisfy this customer requirement?()A、Micro-PartitioningB、Partition Load ManagerC、eWLMD、Grid Toolbox
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()A、What are the plans for Disaster Recovery? B、What are the plans for data migration? C、Would iSCSI meet your needs? D、How much space is available in the current storage systems?
A customer would like to share the processor resources automatically between logical partitions. Which of the following would accomplish this requirement without user interaction? ()A、 Dynamic LPARsB、 On/Off Capacity on DemandC、 Uncapped Micro-PartitioningD、 Enterprise Workload Manager
The customer requests a proposal for three high-availability 4-socket servers with the capability to connect to their existing DS4000 storage server. The customer will make the decision based on the lowest initial purchase price. Which of the following IBM System x solutions would be the most competitive?()A、x3950B、x3850C、x3650D、LS41
A customer would like to consolidate multiple database workloads to a single server to reduce TCO. What is the effect of PowerVM on TCO?()A、Reduces SAN costB、Reduces network costC、Reduces administration costsD、Reduces software licensing cost
The customer has agreed that the SAN proposal is the best solution for their budget. Howeverthey are still unsure of using such leading edge technology. Which item below would help themfeel more comfortable?()A、TCO study B、A demonstration at a BPIC C、IBM customer references D、IBM Redbooks
A mainframe customer has requested a proposal to replace an existing storage system. Which information does Disk Magic provide?()A、logical volume sizesB、cache usage by applicationC、storage processor utilizationD、disk capacity needed forFlashCopy
The customer has an IBM Enterprise Storage Server 800 coming off lease this year. Themaintenance charges are becoming very expensive and they are looking at a new storage solutionto attach to their mainframe environment. Which of the following solutions would be most costeffective?()A、DS8300B、DS8700 C、Storwize V7000 D、XIV Storage System
Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()A、The customer is looking for a fibre SAN solution to increase reliability and performance.B、The customer wants to implement an energy-efficient solution to comply with their Go Green initiative.C、The customer is cost-conscious and is looking for a centralized storage solution.D、The customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.
单选题The customer requests a proposal for three high-availability 4-socket servers with the capability to connect to their existing DS4000 storage server. The customer will make the decision based on the lowest initial purchase price. Which of the following IBM System x solutions would be the most competitive?()Ax3950Bx3850Cx3650DLS41
单选题A customer would like to share the processor resources automatically between logical partitions. Which of the following would accomplish this requirement without user interaction? ()A Dynamic LPARsB On/Off Capacity on DemandC Uncapped Micro-PartitioningD Enterprise Workload Manager
单选题A customer would like to create a shared processor partition with 16 virtual processors. What is the minimum number of processing units required in the partition profile?()A0.80B0.16C1.60D0.10
单选题The customer has agreed that the SAN proposal is the best solution for their budget. Howeverthey are still unsure of using such leading edge technology. Which item below would help themfeel more comfortable?()ATCO study BA demonstration at a BPIC CIBM customer references DIBM Redbooks
单选题The customer would like to replicate their data from site A to site B. This distance is approximately325 meters between the sites. The customer has a DS5000 with 6 DS EXP5000 expansionshelves that hold approximately 40 TB of data. Which method of replication would be supported?()AHACMP-XDBSnapMirrorCSyncMirrorDEnhanced Remote Mirroring
单选题Which of the following best describes why a customer would choose x86 server solutions over mid-range or mainframe solutions?()Ax86 servers are more reliable than mid-range and Mainframe servers.Bx86 servers require less support personnel.CMicrosoft Operating Systems require less maintenance than mid-range and Mainframe Operating Systems.Dx86 solutions cost less.
单选题Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()AThe customer is looking for a fibre SAN solution to increase reliability and performance.BThe customer wants to implement an energy-efficient solution to comply with their Go Green initiative.CThe customer is cost-conscious and is looking for a centralized storage solution.DThe customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.
单选题A customer would like to have the ability to permanently activate processor and memory resources as their workload increases. Which of the following supports the customer requirement?()AReserve Capacity on DemandBUtility Capacity on DemandCCapacity Upgrade on DemandDUncapped Capacity on Demand
单选题Customer: I think I’ll have the tomato soup to start._____ Waiter: Right. And would you like croutons in your soup? Customer: No, thank you. Waiter: How would you like your steak? Rare, medium or well done?AAnd I’d like some teaBAnd I’d also like a steak.CAnd perhaps some orange juice. DAnd I’d like to order now.
单选题An administrator is setting up a network and would like to prevent users from having the ability to plug their PC into the network to receive an IP address. Which of the following addressing schemes should the technician use?()ANATBDynamicCSubnettingDStatic
单选题What is the correct stage in the sales process for a Pre-Sales Technical Delivery Assessment (TDA)? ()ABefore the first solution design meeting with the customerBAfter the solution design proposal is submitted to manufacturing for reviewCOnce the customer has supplied the solution design specifications to the sales teamDAfter the solution design is completed and before the proposal is submitted to the customer