单选题The customer requests a proposal for three high-availability 4-socket servers with the capability to connect to their existing DS4000 storage server. The customer will make the decision based on the lowest initial purchase price.  Which of the following IBM System x solutions would be the most competitive?()Ax3950Bx3850Cx3650DLS41

单选题
The customer requests a proposal for three high-availability 4-socket servers with the capability to connect to their existing DS4000 storage server. The customer will make the decision based on the lowest initial purchase price.  Which of the following IBM System x solutions would be the most competitive?()
A

x3950

B

x3850

C

x3650

D

LS41


参考解析

解析: 暂无解析

相关考题:

A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()A. z/OS, DS8000, TSMB. TSM, LTO-5, VMwareC. System x, VMware, XIVD. System p, VMware, DS5000

A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble.Which resource should be consulted while developing the solution options?()A. Disk MagicB. TPC for DataC. CLARiiON Procedure GeneratorD. System Storage Interoperability Center

A mainframe customer has requested a proposal to replace an existing storage system. Which information does Disk Magic provide?() A. logical volume sizesB. cache usage by applicationC. storage processor utilizationD. disk capacity needed forFlashCopy

A potential new customer needs servers and requests a response to their hardware specifications, which are all related to hardware speeds, disk, and memory configuration. The customer requests a quote within 48 hours.  Which of the following should the System x Sales Specialist do to MAXIMIZE the odds of winning this business? ()A、Request an extension because 48 hours will not be enough time to propose an appropriate solution.B、Ask the customer for a call to learn more about their needs and respond to their request with a complete solution.C、Use the configuration guide or spreadsheet configurator to assemble server configurations that meet the specification, and then look for the lowest price.D、Contact the IBM Client Representative for this account and ask for assistance in setting up a meeting with the technical decision maker of the prospective customer.

A company needs to connect seven of their Windows-based servers to a DS4000 storage server.   The DS4000 only has two host-side connections, and each server has two HBAs.  Which of the following is the lowest cost solution to provide no single points of failure?()A、Implement two 8-port switches design with ISLsB、Implement two 16-port switches design with ISLsC、Implement two 8-port switches design without ISLsD、Implement two 16-port switches design without ISLs

An SMB customer is looking for a low cost, easy to install and configure, entry-level SAN solution to attach to five rack-mounted System x Servers.  Which storage solution would be best for this customer?()A、EXP3000 Local Attached Storage EnclosuresB、DS4000 Series storage solutionC、DS3000 Series Storage solutionD、DS4800 Storage Solution

A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()A、An IBM BladeCenter H chassis for the JS22 Blade serversB、A concurrent KVM daughter cardC、A pair of IBM BladeCenter Power SuppliesD、A second Management Module

A storage specialist is proposing a solution consisting of an IBM System Storage TS3200 TapeLibrary and a SAN Volume Controller, both of which are being added to a customer’s existing SANenvironment for the first time. Which of the following should be completed before the proposal ispresented to the customer?()A、TDAB、Capacity MagicC、business case reviewD、SAN configuration review

The customer requests a proposal for three high-availability 4-socket servers with the capability to connect to their existing DS4000 storage server. The customer will make the decision based on the lowest initial purchase price.  Which of the following IBM System x solutions would be the most competitive?()A、x3950B、x3850C、x3650D、LS41

A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()A、z/OS, DS8000, TSMB、TSM, LTO-5, VMwareC、System x, VMware, XIVD、System p, VMware, DS5000

A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()A、Metro/Global MirrorB、Metro MirrorC、Global CopyD、Global Mirror

A manufacturing customer has an existing SAN for their AIX servers and they want to add theirWindows servers with file level access to their existing storage pool. Which of the following is thelowest cost solution?()A、N7900 B、N6040 C、DS3300 D、DS3500

A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()A、Disk MagicB、TPC for DataC、CLARiiON Procedure GeneratorD、System Storage Interoperability Center

A mainframe customer has requested a proposal to replace an existing storage system. Which information does Disk Magic provide?()A、logical volume sizesB、cache usage by applicationC、storage processor utilizationD、disk capacity needed forFlashCopy

A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()A、Explain to the customer that they need an additional HMC for the POWER5 system.B、Obtain a PO from the customer to purchase additional serial connections to the HMC.C、Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.D、Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

单选题A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()AAn IBM BladeCenter H chassis for the JS22 Blade serversBA concurrent KVM daughter cardCA pair of IBM BladeCenter Power SuppliesDA second Management Module

单选题A mainframe customer has requested a proposal to replace an existing storage system. Which information does Disk Magic provide?()Alogical volume sizesBcache usage by applicationCstorage processor utilizationDdisk capacity needed forFlashCopy

单选题A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()ADisk MagicBTPC for DataCCLARiiON Procedure GeneratorDSystem Storage Interoperability Center

单选题The customer currently has 20 servers with 1 TB of internal capacity on each server. The serverscommunicate over 10/100/1000 Ethernet. The customer would like to move to a shared storagesubsystem with Fibre Channel hard drives. Budget is a key issue for them. Which option wouldallow for the lowest cost to implement?()AIBM DS8700 BIBM N6040 CIBM Storwize V7000 DIBM XIV Storage System

单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()AExplain to the customer that they need an additional HMC for the POWER5 system.BObtain a PO from the customer to purchase additional serial connections to the HMC.CObtain a PO from the customer to purchase additional Ethernet connections to the HMC.DExplain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

单选题A potential new customer needs servers and requests a response to their hardware specifications, which are all related to hardware speeds, disk, and memory configuration. The customer requests a quote within 48 hours.  Which of the following should the System x Sales Specialist do to MAXIMIZE the odds of winning this business? ()ARequest an extension because 48 hours will not be enough time to propose an appropriate solution.BAsk the customer for a call to learn more about their needs and respond to their request with a complete solution.CUse the configuration guide or spreadsheet configurator to assemble server configurations that meet the specification, and then look for the lowest price.DContact the IBM Client Representative for this account and ask for assistance in setting up a meeting with the technical decision maker of the prospective customer.

单选题A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()AWhat are Disaster RecoveryplansBWhat are plans for datamigrationCWhat storage system space isavailableDDoesiSCSI meet the needs

单选题A manufacturing customer has an existing SAN for their AIX servers and they want to add theirWindows servers with file level access to their existing storage pool. Which of the following is thelowest cost solution?()AN7900 BN6040 CDS3300 DDS3500

单选题A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()AMetro/Global MirrorBMetro MirrorCGlobal CopyDGlobal Mirror

单选题A storage specialist is proposing a solution consisting of an IBM System Storage TS3200 TapeLibrary and a SAN Volume Controller, both of which are being added to a customer’s existing SANenvironment for the first time. Which of the following should be completed before the proposal ispresented to the customer?()ATDABCapacity MagicCbusiness case reviewDSAN configuration review

单选题The customer requests a proposal for three high-availability 4-socket servers with the capability to connect to their existing DS4000 storage server. The customer will make the decision based on the lowest initial purchase price.  Which of the following IBM System x solutions would be the most competitive?()Ax3950Bx3850Cx3650DLS41

单选题A company needs to connect seven of their Windows-based servers to a DS4000 storage server.   The DS4000 only has two host-side connections, and each server has two HBAs.  Which of the following is the lowest cost solution to provide no single points of failure?()AImplement two 8-port switches design with ISLsBImplement two 16-port switches design with ISLsCImplement two 8-port switches design without ISLsDImplement two 16-port switches design without ISLs

单选题A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()Az/OS, DS8000, TSMBTSM, LTO-5, VMwareCSystem x, VMware, XIVDSystem p, VMware, DS5000