单选题The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1. They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server. How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()ARun amepat now on all of the existing LPARs.BRun amepat after consolidation on all LPARs.CRun amepat now on all existing LPARs running on the POWER6 servers.DRun amepat now on all existing LPARs running database applications.
单选题
The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1. They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server. How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()
A
Run amepat now on all of the existing LPARs.
B
Run amepat after consolidation on all LPARs.
C
Run amepat now on all existing LPARs running on the POWER6 servers.
D
Run amepat now on all existing LPARs running database applications.
参考解析
解析:
暂无解析
相关考题:
A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites.Which of the following solutions satisfies the customer‘s recovery time objective?()A. DS8700 systems at each site running Metro MirrorB. DS5300 systems at each site running Metro MirrorC. DS5100 systems at each site running Global MirrorD. XIV systems at each site running synchronous mirroring
A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()A、 PowerVM Lx86B、 PowerVM Express EditionC、 PowerVM Standard EditionD、 PowerVM Enterprise Edition
The company has purchased one hundred and fifty new servers. The server administrator needs to build and deploy them as quickly as possible. Which of the following is the FASTEST method of building and deploying each server?()A、Build each server from the OS manufacturer’s build disk.B、Use an imaging system to manually deploy the build to the servers.C、Build each server with the manufacturer’s build disk.D、Give the company build disk to the server manufacturer.
The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1. They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server. How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()A、Run amepat now on all of the existing LPARs.B、Run amepat after consolidation on all LPARs.C、Run amepat now on all existing LPARs running on the POWER6 servers.D、Run amepat now on all existing LPARs running database applications.
An existing IBM customer has a few pSeries servers running DB2 on AIX in their environment. The DB2 application contains the database for an order entry application. An xSeries SQL database server replicating from DB2 is added for off-line analysis purposes. The customer wants to know if consolidating the storage and centralized backup is possible. What are the options available to accomplish this?()A、pSeries and xSeries use different file systems. Consolidating Storage and backup is not achievable.B、Consolidation is possible by connecting pSeries local storage to the xSeries SQL server using the IXA adapter.C、Storage consolidation can be achieved by connecting the pSeries and xSeries servers to a common DS4000 storage server.D、Storage consolidation is only achievable when raw file systems are used by the databases and both servers run the same Linux file system (e.g., EXT3 or Reiser).
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM
An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()A、POWER7 servers running AIX 5.3 operate in POWER5+ mode.B、POWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.C、POWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.D、POWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.
A pSeries technical specialist has been asked to provide a server consolidation solution to replace several AIX servers running typical commercial database workloads. Benchmarks for SPECint, SPECfp, SPECjbb as well as estimates of ROLTP and rPerf are available for all the current systems. Which of the following could be used as a first approximation of total performance required for one large server?()A、Sum of SPECfp valuesB、Sum of rPerf values onlyC、Sum of rPerf and ROLTP valuesD、Sum of SPECint and SPECjbb values
A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()A、PowerVM Standard EditionB、VMControl Standard EditionC、Hardware Management ConsoleD、IBM Systems Director Standard Edition
A financial customer has three data centers that are four kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds. Which solution satisfies the customer’s recovery time objective()A、DS8700 systems at each site running Metro MirrorB、DS8700 systems at each site running Global MirrorC、DS5300 systems at each site running Global MirrorD、XIV systems at each site running Remote Mirroring
A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites. Which of the following solutions satisfies the customer's recovery time objective?()A、DS8700 systems at each site running Metro MirrorB、DS5300 systems at each site running Metro MirrorC、DS5100 systems at each site running Global MirrorD、XIV systems at each site running synchronous mirroring
A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()A、The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.B、The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.C、The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.D、The POWER5 system supports more partitions and has the lowest partitioning overhead.
An HP UNIX server customer running Oracle is interested in knowing more about IBM’s future direction because of the uncertainty of HP hardware platforms changing to Itanium. Which of the following advantages should be communicated as a compelling reason to consider a pSeries server solution?()A、IBM pSeries servers support Oracle on both POWER4 and ItaniumB、AIX has Itanium affinity with any ISV application including OracleC、Oracle and thousands of other ISV applications are already available for AIX on pSeriesD、IBM Data Migration Services can migrate the HP UNIX operating system to a pSeries solution
A customer wants to run a Domino e-mail application,a Business Intelligence database,and a batch processing application on Linux.The workloads have different behaviors and do not have peaks at the same time. What is a benefit of running these applications on a Power Systems server instead of running on separate x86 servers?()A、Each Linux application can run in a Workload Partition, reducing the management efforts.B、Total cost of Linux applications on Power Systems is more cost effective than on x86 because of platform licensing.C、Memory cloning can be used on the Power Systems to have a single image of the Linux kernel shared by all partitions.D、Using micro-partitions on Power Systems allow the workloads to share the processing resources, increasing the overall system utilization.
单选题A pSeries technical specialist has been asked to provide a server consolidation solution to replace several AIX servers running typical commercial database workloads. Benchmarks for SPECint, SPECfp, SPECjbb as well as estimates of ROLTP and rPerf are available for all the current systems. Which of the following could be used as a first approximation of total performance required for one large server?()ASum of SPECfp valuesBSum of rPerf values onlyCSum of rPerf and ROLTP valuesDSum of SPECint and SPECjbb values
单选题A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()AAll the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterBThe Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCCThey should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneDThe Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM
单选题A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites. Which of the following solutions satisfies the customer's recovery time objective?()ADS8700 systems at each site running Metro MirrorBDS5300 systems at each site running Metro MirrorCDS5100 systems at each site running Global MirrorDXIV systems at each site running synchronous mirroring
单选题A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()APowerVM Standard EditionBVMControl Standard EditionCHardware Management ConsoleDIBM Systems Director Standard Edition
单选题A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()AThe POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.BThe POWER5 system supports more partitions, processors, and memory than any competitor’s solution.CThe POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.DThe POWER5 system supports more partitions and has the lowest partitioning overhead.
单选题A hospital customer with an experienced AIX and Microsoft Windows staff wants to consolidate all of their file/print services onto fewer systems. They currently use multiple Microsoft Windows-based Intelsystems that are experiencing reliability problems. They also have POWER4+ systems that are running multiple AIX LPARs that have experienced no reliability issues. They need at least 99.99% uptime. Which solution will meet their uptime needs at the lowest cost?()ACombine the file/print servers onto a larger Intel-based machine (x445).BBring up a Linux LPAR on the pSeries and run Samba to provide file/print services.CBring up another AIX LPAR on the pSeries and run Samba to provide file/print services.DBring up another AIX LPAR on the pSeries and run Connect Direct to provide file/print services.
单选题An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energy efficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following will address his concern?()APOWER7 servers running AIX 5.3 operate in POWER5+ mode.BPOWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.CPOWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.DPOWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.
单选题A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()A PowerVM Lx86B PowerVM Express EditionC PowerVM Standard EditionD PowerVM Enterprise Edition
单选题The company has purchased one hundred and fifty new servers. The server administrator needs to build and deploy them as quickly as possible. Which of the following is the FASTEST method of building and deploying each server?()ABuild each server from the OS manufacturer’s build disk.BUse an imaging system to manually deploy the build to the servers.CBuild each server with the manufacturer’s build disk.DGive the company build disk to the server manufacturer.
单选题An existing IBM customer has a few pSeries servers running DB2 on AIX in their environment. The DB2 application contains the database for an order entry application. An xSeries SQL database server replicating from DB2 is added for off-line analysis purposes. The customer wants to know if consolidating the storage and centralized backup is possible. What are the options available to accomplish this?()ApSeries and xSeries use different file systems. Consolidating Storage and backup is not achievable.BConsolidation is possible by connecting pSeries local storage to the xSeries SQL server using the IXA adapter.CStorage consolidation can be achieved by connecting the pSeries and xSeries servers to a common DS4000 storage server.DStorage consolidation is only achievable when raw file systems are used by the databases and both servers run the same Linux file system (e.g., EXT3 or Reiser).
单选题A financial customer has three data centers that are four kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds. Which solution satisfies the customer’s recovery time objective()ADS8700 systems at each site running Metro MirrorBDS8700 systems at each site running Global MirrorCDS5300 systems at each site running Global MirrorDXIV systems at each site running Remote Mirroring
单选题A customer wants to run a Domino e-mail application,a Business Intelligence database,and a batch processing application on Linux.The workloads have different behaviors and do not have peaks at the same time. What is a benefit of running these applications on a Power Systems server instead of running on separate x86 servers?()AEach Linux application can run in a Workload Partition, reducing the management efforts.BTotal cost of Linux applications on Power Systems is more cost effective than on x86 because of platform licensing.CMemory cloning can be used on the Power Systems to have a single image of the Linux kernel shared by all partitions.DUsing micro-partitions on Power Systems allow the workloads to share the processing resources, increasing the overall system utilization.
单选题An HP UNIX server customer running Oracle is interested in knowing more about IBM’s future direction because of the uncertainty of HP hardware platforms changing to Itanium. Which of the following advantages should be communicated as a compelling reason to consider a pSeries server solution?()AIBM pSeries servers support Oracle on both POWER4 and ItaniumBAIX has Itanium affinity with any ISV application including OracleCOracle and thousands of other ISV applications are already available for AIX on pSeriesDIBM Data Migration Services can migrate the HP UNIX operating system to a pSeries solution