A resource was dynamically assigned to an LPAR. The customer wants to make the assignment permanent. What does the technical specialist need to do to reconfigure the LPARs to make the assignment permanent?()A、Reboot the source LPAR.B、Remove the resource from the source LPAR.C、Rediscover the managed system from the HMC.D、Add the resource to the profile of the LPAR.
A resource was dynamically assigned to an LPAR. The customer wants to make the assignment permanent. What does the technical specialist need to do to reconfigure the LPARs to make the assignment permanent?()
- A、Reboot the source LPAR.
- B、Remove the resource from the source LPAR.
- C、Rediscover the managed system from the HMC.
- D、Add the resource to the profile of the LPAR.
相关考题:
Resource leveling _____.A.Allocates resources to activities to find shortest schedule within fixed resource limits.B.Smoothes out resource requirements by rescheduling activities within their float time.C.Smooths out resource requirements by substituting activities with unassigned resources.D.Attempts to reduce resource requirements within a constraint on project durationE.B or D
Planning activities such that predetermined resource availability pools are not exceeded is called:A.Resource leveling.B.Manpower leveling.C.Resource limited planning.D.Manpower planning.E.Manpower contingency planning.
171 Resource leveling _____.A. Allocates resources to activities to find shortest schedule within fixed resource limits.B. Smoothes out resource requirements by rescheduling activities within their float time.C. Smooths out resource requirements by substituting activities with unassigned resources.D. Attempts to reduce resource requirements within a constraint on project durationE. B or D
The process of()schedule activity durations uses information on schedule activityscope of work, required resource types, estimated resource quantities, and resource calendarswith resource availabilities.A.estimatingB.definingC.planningD.sequencing
The process of()schedule activity durations uses information on schedule activity scope of work, required resource types, estimated resource quantities, and resource calendars with resource availabilities.A.estimatingB.definingC.planningD.sequencing
● Resource leveling _____.A Allocates resources to activities to find shortest schedule within fixed resource limits.B Smoothes out resource requirements by rescheduling activities within their float time.C Smooths out resource requirements by substituting activities with unassigned resources.D Attempts to reduce resource requirements within a constraint on project durationE B or D
Estimating activity durations uses information on activity scope of(74) , required resource types, estimated resource quantities, and resource calendars.A.milestoneB.baselineC.qualityD.work
X2AP的Resource Status Reporting Initiation过程通过那条消息发起?A.RESOURCE STATUS UPDATEB.RESOURCE STATUS REQUESTC.RESOURCE STATUS RESPONSED.ENB CONFIGURATION UPDATE
The process of(72)schedule activity durations uses information on schedule activity scope of work,required resource types,estimated resource quantities,and resource calendars with resource availabilities.A.estimatingB.definingC.planningD.sequencing
WhichoftheserepresentthemaincomponentsofDatabaseResourceManager?() A.ResourceconsumergroupsB.ResourceplansC.Resource-plangroupsD.Resource-plandirectivesE.Alloftheabove
TD-LTE最小的时频资源单位是()。 A.Resource ELementB.Resource Element groupC.Control Channel ElementD.Resource Block
TD-LTE最小的时频资源单位是()。A、Resource ELementB、Resource Element groupC、Control Channel ElementD、Resource Block
X2AP的ResourceStatusReportingInitiation过程通过那条消息发起A、RESOURCE STATUS UPDATEB、RESOURCE STATUS REQUESTC、RESOURCE STATUS RESPONSED、ENB CONFIGURATION UPDATE
()is the management system to control the material consumed, reduce inventory in the manufacture company.A、DRP (Distribution Resource Planning)B、LRP (Logistics Resource Planning)C、MRP (Material Requirements Planning)D、ERP (Enterprise Resource Planning)
An administrator uses C-SPOC to change the user password for all nodes that belong to a Resource group. The administrator must perform this operation on a node that is:() A、 included in the resource group.B、 currently managing the resource group.C、 not part of an application resource group.D、 included in a cluster_admin resource group.
To load the base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed()A、A mksysb resource, a SPOT resource, and an lpp_source resourceB、A SPOT resource, an lpp_source resource, and a machine definitionC、An lpp_source resource, a mksysb resource, and a machine definitionD、A SPOT resource, an lpp_source resource, a bosinst_data resource, and a machine definition
To load a base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed?()A、A mksysb resource, a SPOT resource, and an lpp_source resourceB、A SPOT resource, an lpp_source resource, and a machine definitionC、An lpp_source resource, a mksysb resource, and a machine definitionD、A SPOT resource, an lpp_source resource, a machine definition, and a bootable CD
You are creating a resource consumer group using the DBMS_RESOURCE_MANAGER.CREATE_CONSUMER_GROUP procedure. Which parameter will you use to define the resource scheduling method used between sessions within the resource group?() A、 CPU_MTHB、 NEW_CPU_MTHC、 CPU_P1D、 CPU_P2
Which of these represent the main components of Database Resource Manager?()A、 Resource consumer groupsB、 Resource plansC、 Resource-plan groupsD、 Resource-plan directivesE、 All of the above
You are creating the simple resource plan using the DBMS_RESOURCE_MANAGER.CREATE_SIMPLE_PLAN procedure. Which resource allocation policy will be used for the resource plan?() A、 RATIOB、 EMPHASISC、 ACTIVE_SESS_POOL_MTHD、 RESOURCE_DEGREE_LIMIT_ABSOLUTE
You create two resource plans, one for data warehouse loading jobs at night and the other for application jobs at day time. You want the resource plans to activate automatically so that the resource allocation is optimum as desired by the activity.How would you achieve this? ()A、Implement job classes B、Implement Scheduler windowsC、Implement the mapping rule for the consumer groups D、Set the SWITCH_TIME resource plan directive for both the resource plans
An HACMP setting timer may used to allow:() A、 The setting or fallback of a cluster custom resource groupB、 The cluster time to stabilize before starting a custom resource groupC、 A priority node time to acquire custom resource group at cluster startD、 A fallover node time to process custom resource states to be monitored
单选题You are creating the simple resource plan using the DBMS_RESOURCE_MANAGER.CREATE_SIMPLE_PLAN procedure. Which resource allocation policy will be used for the resource plan?()A RATIOB EMPHASISC ACTIVE_SESS_POOL_MTHD RESOURCE_DEGREE_LIMIT_ABSOLUTE
单选题To load a base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed?()AA mksysb resource, a SPOT resource, and an lpp_source resourceBA SPOT resource, an lpp_source resource, and a machine definitionCAn lpp_source resource, a mksysb resource, and a machine definitionDA SPOT resource, an lpp_source resource, a machine definition, and a bootable CD
单选题You have created a resource plan, DB_PLAN, using DBMS_RESOURCE_MANAGER.CREATE_SIMPLE_PLAN and you want to impose a restriction on utilization of resources by the database users. Which step must be performed before you can start using the resource plan?()A assign users to consumer groupsB set the resource plan for the instanceC configure a simple resource plan and specify plan directivesD configure a complex resource plan and specify plan directives
单选题An administrator uses C-SPOC to change the user password for all nodes that belong to a Resource group. The administrator must perform this operation on a node that is:()A included in the resource group.B currently managing the resource group.C not part of an application resource group.D included in a cluster_admin resource group.
单选题To load the base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed()AA mksysb resource, a SPOT resource, and an lpp_source resourceBA SPOT resource, an lpp_source resource, and a machine definitionCAn lpp_source resource, a mksysb resource, and a machine definitionDA SPOT resource, an lpp_source resource, a bosinst_data resource, and a machine definition
单选题You have created a resource plan, DB_PLAN, using DBMS_RESOURCE_MANAGER.CREATE_SIMPLE_PLAN and you want to impose a restriction on utilization of resources by the database users. Which step must be performed before you can start using the resource plan?()Aassign users to consumer groupsBset the resource plan for the instanceCconfigure a simple resource plan and specify plan directivesDconfigure a complex resource plan and specify plan directives