单选题The stevedores()load your ship in a few days.Ais going toBare going toCwas going toDare go to

单选题
The stevedores()load your ship in a few days.
A

is going to

B

are going to

C

was going to

D

are go to


参考解析

解析: 暂无解析

相关考题:

The committee members propose that the plan ________ postponed for a few days. A.beingB.to beC.beenD.be

The stevedores are going to load your ship in ________ daysA.fewB.a fewC.littleD.a little

The trouble ____ the car is that it has to be repaired every few days. A.toB.forC.inD.with

Although the number of____ is not great, it has none the less increased significantly over the past few days. A、positionB、strangerC、applicationsD、character

Great quantities of fish ______ in the river in the past few days. A. is caughtB. are caughtC. has been caughtD. have been caught

Chief foreman,you are requested to instruct all stevedores boarding the ship that no smoking is ______ in the holds during loading.A.allowedB.forbiddenC.approvedD.disliked

The document that certifies the correctness of the load line marks on a ship is called the ______.A.Certificate of InspectionB.Load line certificateC.Certificate of DocumentationD.SOLAS Certificate

During the process of loading,damages to cargo can be reduced to minimum by ______.A.Shippers who deliver the cargo to the ship on timeB.Stevedores who handle the cargo with cautionC.Ship's crew members who check the cargo in regular intervalsD.Consignees who take good care of the cargo

The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the ______.A.Maximum counter weight requiredB.Minimum horsepower requiredC.Hoist rope strengthD.Allowable load

Chief foreman,you are requested to instruct all stevedores______that no smoking is allowed on the main deck.A.boarding the shipB.reaching the shipC.throughing the shipD.disembarking from the ship

Persons who load and discharge ships are called ()(装卸工人).A、cargo workersB、dockersC、port menD、stevedores

大副告诉装卸工人不要用钩子装袋装货。()A、The chief officer told the stevedores not to use hooks to load the deck cargo.B、The bosun told the stevedores not to use hooks to load the bagged cargo.C、The chief officer told the stevedores not to use hooks to load the bagged cargo.D、The bosun told the stevedores not to use hooks to load the deck cargo.

The gangway is ()high for the stevedores ()board this ship.()A、so;thatB、as;asC、too;toD、so;to

单选题The damage to the hatch cover was caused by your stevedores,and you ought to have known we never()lies.AsayBtalkCtellDspeak

单选题Foreman,the ship(),please get the stevedores to fill the port wings with heavier packages.Alists to starboardBis shifting to starboardCis inclined to starboardDis listing to starboard

单选题Please tell the stevedores to load the cargo()according to the respective figures.AtightlyBcloselyCsecurelyDstrictly

单选题On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().Awinch speedBboom strengthCload radiusDcable strength

单选题()is the draft of your ship at full load?AHow manyBHow muchCHow highDWhat

单选题Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().ALCGBtransverse momentCrighting momentDinclining moment

单选题The gangway is ()high for the stevedores ()board this ship.()Aso;thatBas;asCtoo;toDso;to

单选题It’s()that the cargo was damaged by your stevedores.AbrightBdistinctCplainDevident

单选题大副告诉装卸工人不要用钩子装袋装货。()AThe chief officer told the stevedores not to use hooks to load the deck cargo.BThe bosun told the stevedores not to use hooks to load the bagged cargo.CThe chief officer told the stevedores not to use hooks to load the bagged cargo.DThe bosun told the stevedores not to use hooks to load the deck cargo.

单选题The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().Amaximum counter weight requiredBminimum horsepower requiredChoist rope strengthDallowable load

单选题()is not a static load.AActual weight of the ship's structure,outfitting,equipment and machineryBBallast load(weight)CCargo loadDSlamming and sloshing load

单选题Your ship’s certificates show that you did not do renewing work for certificate.All certificates have expired a few days before. Thus, your ship is(). It follows therefore that she will()Aseaworthy; be fined in our portBun-seaworthy; be disassembled in our portCseaworthy; be assembled in our portDun-seaworthy;be detained in our port

单选题Your stevedores are liable()the damage.AatBtoCforDwith

单选题On a ship crane,the load chart relates the allowable load to the combination of boom length and().Aboom angleBboom strengthCload radiusDcable strength