名词解释题工厂的最小有效规模(Minimum efficient size of plant)
名词解释题
工厂的最小有效规模(Minimum efficient size of plant)
参考解析
解析:
暂无解析
相关考题:
如果一个企业有两个生产相同产品的工厂,一个规模大,一个规模小,企业安排生产的原则是()。A:先安排规模大的工厂生产,后安排规模小的工厂生产B:先安排规模小的工厂生产,后安排规模大的工厂生产C:主要安排在规模大的工厂生产,少部分安排在规模小的工厂生产D:根据每增加一个单位的产出,哪个工厂的边际成本低,就安排哪个工厂生产
Describe the most efficient way(in term of execution timeand code size) to divide a number by 4 in assembly language
Apriori算法用下列哪个做项目集(Itemset)的筛选?()A、最小信赖度(Minimum Confidence)B、最小支持度(Minimum Support)C、交易编号(TransactionID)D、购买数量
What are three benefits of implementing vlans?()A、A more efficient use of bandwidth can be achieved allowing many physical groups to use the same network infrastructureB、Broadcast storms can be mitigated by decreasing the number of broadcast domains,thus increasing their size.C、A higher level of network security can be reached by separating sensitive data traffic from other network traffic.D、Port-based vlans increase switch-port use efficient,thanks to 802.1Q trunksE、A more efficient use of bandwidth can be achieved allowing many logical networks to use the same network infrastructure.F、Broadcast storms can be mitigated by increasing the number of broadcast domains,thus reducing their size.G、VLANs make it easier for IT staff to configure new logical groups,because the vlans all belong to the same broadcast domain.
public class Plant { private String name; public Plant(String name) { this.name = name; } public String getName() { return name; } } public class Tree extends Plant { public void growFruit() { } public void dropLeaves() { } } Which is true?() A、 The code will compile without changes.B、 The code will compile if public Tree() { Plant(); } is added to the Tree class.C、 The code will compile if public Plant() { Tree(); } is added to the Plant class.D、 The code will compile if public Plant() { this(”fern”); } is added to the Plant class.E、 The code will compile if public Plant() { Plant(”fern”); } is added to the Plant class.
单选题Apriori算法用下列哪个做项目集(Itemset)的筛选?()A最小信赖度(Minimum Confidence)B最小支持度(Minimum Support)C交易编号(TransactionID)D购买数量
单选题The MINIMUM acceptable size for a towing bridle would be that size in which the safe working load (SWL) of each leg of the bridle is equal to().Aone-half the SWL of the main towing hawserBthree-fourths the SWL of the main towing hawserCthat of the main towing hawserDtwice that of the main towing hawser
单选题The size of the discharge ring used for the efficient operation of a disk type purifier is dependent upon the()Arated capacity of that purifierBviscosity of the oil being purifiedCmaximum design speed of that purifierDspecific gravity of the oil being purified
多选题You set the value of the SGA_TARGET initialization parameter to 1G to enable Oracle to automatically resize most of the memory components according to the current workload in the database. You issue the following statement: SQL SELECT name, value, isdefault 2 FROM v$parameter 3 WHERE name LIKE ’%size%’; The output of this statement displays that the DB_CACHE_SIZE, SHARED_POOL_SIZE, LARGE_POOL_SIZE, and JAVA_POOL_SIZE initialization parameters contain a zero value. What does this imply?()AThe SGA_TARGET initialization parameter cannot be set to a value less than 1GBThe SGA_TARGET initialization parameter cannot be set to a value greater than 1GCThe Memory Advisor of the Oracle Enterprise Manager 10g cannot be used to obtain advice on the important memory components of the SGADThe values of the DB_CACHE_SIZE, SHARED_POOL_SIZE, LARGE_POOL_SIZE, and JAVA_POOL_SIZE initialization parameters cannot be set manually.ENo minimum limits are imposed on the DB_CACHE_SIZE, SHARED_POOL_SIZE, LARGE_POOL_SIZE, and JAVA_POOL_SIZE initialization parameters.FThe Automatic Shared Memory Management feature cannot be disabled unless you specify values for the DB_CACHE_SIZE, SHARED_POOL_SIZE, LARGE_POOL_SIZE, and JAVA_POOL_SIZE initialization parameters in the initialization parameter file.
单选题You are maintaining your database in Oracle10g. You have set the value of the STATISTICS_LEVEL initialization parameter to TYPICAL and the value of the FAST_START_MTTR_TARGET parameter to 900 seconds. To increase the performance of the database, you want to determine the log file size that should equal the minimum size of all the online redo log files. Which column will enable you to perform the desired task?()A the WRITES_LOGFILE_SIZE column of the V$INSTANCE_RECOVERY viewB the column of the V$INSTANCE_RECOVERY viewC the OPTIMAL_LOGFILE_SIZE column of the V$INSTANCE_RECOVERY viewD the LOG_FILE_SIZE_REDO_BLKS column of the V$INSTANCE_RECOVERY view
单选题Automatic Shared Memory Management (ASMM) has been enabled for your database instance. Theinitialization parameters for the components that are managed by ASMM are not set. After observing theeffects of ASSM, you executed the following command: SQL ALTER SYSTEM SET DB_CACHE_SIZE = 100M; Which statement is true in this scenario()AThe minimum memory size for the database buffer cache is set to 100 mb.BThe maximum memory size that can be obtained by the database buffer cache during ASMM is set to100 mbCThe minimum memory size allocated for a server process in the database buffer cache in dedicatedmode is set to 100 mb.DThe maximum memory size from the database buffer cache that can be released for dynamicdistribution during ASMM is set to 100 mb
单选题The minimum speed an engine must attain before ignition can occur depends upon ().Athe type and size of the engineBthe condition of the engineCambient temperatureDall of the above
多选题What are the three steps you should take to tune a JDBC Connection pool in WebLogic from the initial settings in a production environment?()AEnsure the maximum size is increased to an appropriate setting.BSet the minimum and maximum size of the connection pool to the same value.CIncrease the statement cache size.DAdd more heap to the JVM.EAdd more nodes to the cluster.