单选题The boom stops are installed on an offshore crane to().Aprevent the boom from being raised too highBprevent the boom from swingingCsupport the boom when not in useDprevent the boom from being lowered

单选题
The boom stops are installed on an offshore crane to().
A

prevent the boom from being raised too high

B

prevent the boom from swinging

C

support the boom when not in use

D

prevent the boom from being lowered


参考解析

解析: 暂无解析

相关考题:

On a crane, the boom indicator tells the operator what angle the boom angle is compared to the ______.A.vertical positionB.horizontal positionC.boom stop angleD.minimum radius angle

The electrical components for each single crane are installed in its ______.A.crane houseB.machinery baseC.turntableD.All of the above

The boom stops are installed on an offshore crane to ______.A.prevent the boom from being raised too highB.prevent the boom from swingingC.support the boom when not in useD.prevent the boom from being lowered

The boom stops on a pedestal crane prevent the boom from ______.A.being raised too highB.swinging at seaC.overloading when not in useD.being lowered too low

The signal man assisting a crane operator has his arm extended with his fingers closed and thumb pointing upward.This is the signal to ______.A.raise the boomB.raise the hookC.raise the boom and hookD.check the boom stop

For any given pedestal crane,when the boom is lengthened,the lifting capacity is ______.A.unchangedB.increasedC.eliminatedD.decreased

The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the ______.A.Maximum counter weight requiredB.Minimum horsepower requiredC.Hoist rope strengthD.Allowable load

What does “evel-luffing” accomplish during crane operations ________.A.It prevents the load from swinging when the boom level is adjustedB.Less power is needed when topping the boom with a load on the hookC.It maintains the height of the load above the deckD.All of the above

What is meant by the term“luffing the boom”of a crane ________.A.Stopping the boomB.Topping or lowering the boomC.Moving the boom left or rightD.All of the above

When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength

While off-loading from an offshore supply vessel with the crane,the wind increases in strength and changes direction significantly,you should ______.A.Expedite off-loadingB.Stop off-loading,but keep the offshore supply vessel in the present locationC.Continue off-loading with no changesD.Move the offshore supply vessel to the downwind side

单选题The ()(笨重货) must be handled by jumbo boom or shore crane.Aawkward cargoBdrummed cargoCcased cargoDheavy cargo

单选题Which action(s) is/are included in crane operations?()ANormal boom stowage and shutdown operationsBEmergency shutdown operationCRemoving booms from stowageDAll of the above

单选题For any given pedestal crane,when the boom is lengthened, the lifing capacity is().AunchangedBincreasedCeliminatedDdecreased

单选题The signal man assisting a crane operator has his arm extended with his fingers closed and thumb pointing upward. This is the signal to().Araise the boomBraise the hookCraise the boom and hookDcheck the boom stop

单选题On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().Awinch speedBboom strengthCload radiusDcable strength

单选题The boom stops on a pedestal crane prevent the boom from().Abeing raised too highBswinging at seaCoverloading when not in useDbeing lowered too low

单选题What is meant by the term“luffing the boom”of a crane().AStopping the boomBTopping or lowering the boomCMoving the boom left or rightDAll of the above

单选题Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().AA centerline crane can never be operated in tandemBOne crane is able to work one end of two adjacent hatchesCThese cranes are more economical and weigh less than outboard-mounted cranesDOne crane is able to work both sides of the ship

单选题When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().Awinch speedBboom strengthCload radiusDcable strength

单选题The load chart of a crane enables the operator to combine the load radius with boom length to determine the().Amaximum counter weight requiredBminimum horsepower requiredChoist rope strengthDallowable load

单选题Sudden starts or stops of the boom is likely to cause all of the following except().Abreaking a cargo runnerBparting guys topping liftsCcarrying away a blockDoverheating the resistors and eventually burning out

单选题The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().Amaximum counter weight requiredBminimum horsepower requiredChoist rope strengthDallowable load

单选题What does “evel-luffing” accomplish during crane operations().AIt prevents the load from swinging when the boom level is adjustedBLess power is needed when topping the boom with a load on the hookCIt maintains the height of the load above the deckDAll of the above

单选题0n a crane ,the boom indicator tells the operator what angle the boom angle is compared to the().Avertical positionBhorizontal positionCboom stop angleDminimum radius angle

单选题The boom indicator on a crane will indicate the().Alength of the boomBangle of the boomClifting capacity of the boomDdirection of the boom

单选题On a ship crane,the load chart relates the allowable load to the combination of boom length and().Aboom angleBboom strengthCload radiusDcable strength