单选题A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()AThe room temperature has reached 23C (73.4F). BA Blade within the chassis has been shut down. CThe ambient temperature in the data center has increased DOne of the additional System X servers in the BladeCenter rack has failed.

单选题
A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()
A

The room temperature has reached 23C (73.4F). 

B

A Blade within the chassis has been shut down. 

C

The ambient temperature in the data center has increased 

D

One of the additional System X servers in the BladeCenter rack has failed.


参考解析

解析: 暂无解析

相关考题:

The network administrator has just finished installing a new 10/100/1000 switch, but receives reports from the server administrator that servers connected to the new switch seem to be experiencing slow LAN connections. The network administrator checks the port connecting the new switch to the core switch and sees the following information:Which of the following is the MOST likely cause of the slow connections?()A. The servers have not had VLAN tagging enabled on their NICs.B. Speed and duplex have not been set.C. VLAN tagging was not set on the trunk.D. The servers have been connected with CAT5 cable.

A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble.Which resource should be consulted while developing the solution options?()A. Disk MagicB. TPC for DataC. CLARiiON Procedure GeneratorD. System Storage Interoperability Center

A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()A、The room temperature has reached 23C (73.4F). B、A Blade within the chassis has been shut down. C、The ambient temperature in the data center has increased D、One of the additional System X servers in the BladeCenter rack has failed.

After a server has been installed into a rack, an administrator must ensure which of the following?()A、Warm air flow is permitted through the front bezelB、The system is labeled so that it can be identifiedC、Verify the change control process can be implementedD、Determine the correct power requirements

An SNMP alert has been generated by a server in the main data center.The alert stated that the internal temperature of the server has exceeded the threshold.No other servers in the rack have experienced problems,and no other alerts have come from that server about any other events.Which of the following is the cause of this issue?()A、Rack cooling equipment failureB、Dust collection in the serverC、Server processor failureD、Server power supply failure

A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.  Which IBM BladeCenter Chassis should be recommended? ()A、BladeCenter EB、BladeCenter HC、BladeCenter TD、BladeCenter HT

An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()A、the XIV system can be scaled by the addition of modulesB、XIV offers thin provisioning for all available host operating systemsC、reduced operating costs will pay for another XIV system in less than two yearsD、the management GUI allows the administrator tovirtualize the entire storage system quickly

A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers.  This is the first p650 in the enterprise.  What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()A、Have the PDU requirements been met?B、Are there sufficient KVM connections?C、Is there sufficient service clearance?D、Is there sufficient space in the existing rack?

You have a request to put together IBM System x and blade servers attached to IBM DS4000 Storage: all in a rack. Your customer is also requesting services.  What IBM resource will help you put these different products together?()A、IBM System x and BladeCenter Business Partner GuidebookB、IBM Sizing GuidesC、IBM Configuration  Options Guide (COG)D、IBM Standalone Solutions Configuration Tool (SSCT)

A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers.  Which of the following should the Sales Specialist emphasize to address the pricing difference?()A、Higher rack density that reduces data center footprintsB、Internal upgrades that only IBM can offerC、Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches D、The Rear Door Heat eXchanger that only IBM can offer

While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()A、IBM DS5000 Cabling ToolB、IBM e-Configurator ToolC、IBM Pre-Installation TDA ChecklistD、IBM Standalone Solutions Configuration Tool

An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix of the following?()A、Add Rear Door HeateXchangerB、Add fans to the top of the racksC、Increase circulation from Data Center raised floorD、Change to perforated doors

A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()A、Disk MagicB、TPC for DataC、CLARiiON Procedure GeneratorD、System Storage Interoperability Center

An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix? ()A、Add Rear Door Heat eXchanger B、Add fans to the top of the racks C、Increase circulation from Data Center raised floor D、Change to perforated doors

A customer purchased a new IBM xSeries x445.  They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server.  The rack houses an existing UPS unit for the entire rack.  Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()A、Have optional Fibre Channel and Ethernet switches been installed in the server?B、What is the available kVA value of the UPS?C、Are there sufficient empty socket outlets in the UPS?D、What is the impact on the power consumption of the data center cooling system?

单选题A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()ADisk MagicBTPC for DataCCLARiiON Procedure GeneratorDSystem Storage Interoperability Center

单选题A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()ARedundant power supplies on the serversBRedundant PDUs in the rackCedundant power supplies in the servers and redundant PDUs in the rackDRedundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)

单选题A customer has an IBM System Storage Enterprise Storage Server and several EMC CX3 systems installed in a data center, attached to IBM System p servers. As a step toward data consolidation, they intend to put all data on a new DS8700.  What would be the most important data migration factors to consider()Asector size and the amount of production dataBexisting RAID levels and the disk drive speedCsector size and existing RAID levelsDamount of production data and the disk drive speed

单选题A customer purchased a new IBM xSeries x445.  They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server.  The rack houses an existing UPS unit for the entire rack.  Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()AHave optional Fibre Channel and Ethernet switches been installed in the server?BWhat is the available kVA value of the UPS?CAre there sufficient empty socket outlets in the UPS?DWhat is the impact on the power consumption of the data center cooling system?

单选题After a server has been installed into a rack, an administrator must ensure which of the following?()AWarm air flow is permitted through the front bezelBThe system is labeled so that it can be identifiedCVerify the change control process can be implementedDDetermine the correct power requirements

单选题While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()AIBM DS5000 Cabling ToolBIBM e-Configurator ToolCIBM Pre-Installation TDA ChecklistDIBM Standalone Solutions Configuration Tool

单选题A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.  Which IBM BladeCenter Chassis should be recommended? ()ABladeCenter EBBladeCenter HCBladeCenter TDBladeCenter HT

单选题A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers.  Which of the following should the Sales Specialist emphasize to address the pricing difference?()AHigher rack density that reduces data center footprintsBInternal upgrades that only IBM can offerCTotal Cost of Ownership (TCO) related to innovative components such as Integrated Switches DThe Rear Door Heat eXchanger that only IBM can offer

单选题You have a request to put together IBM System x and blade servers attached to IBM DS4000 Storage: all in a rack. Your customer is also requesting services.  What IBM resource will help you put these different products together?()AIBM System x and BladeCenter Business Partner GuidebookBIBM Sizing GuidesCIBM Configuration  Options Guide (COG)DIBM Standalone Solutions Configuration Tool (SSCT)

单选题An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix? ()AAdd Rear Door Heat eXchanger BAdd fans to the top of the racks CIncrease circulation from Data Center raised floor DChange to perforated doors

单选题An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix of the following?()AAdd Rear Door HeateXchangerBAdd fans to the top of the racksCIncrease circulation from Data Center raised floorDChange to perforated doors

单选题A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()AThe room temperature has reached 23C (73.4F). BA Blade within the chassis has been shut down. CThe ambient temperature in the data center has increased DOne of the additional System X servers in the BladeCenter rack has failed.

单选题An SNMP alert has been generated by a server in the main data center.The alert stated that the internal temperature of the server has exceeded the threshold.No other servers in the rack have experienced problems,and no other alerts have come from that server about any other events.Which of the following is the cause of this issue?()ARack cooling equipment failureBDust collection in the serverCServer processor failureDServer power supply failure