While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()A、IBM DS5000 Cabling ToolB、IBM e-Configurator ToolC、IBM Pre-Installation TDA ChecklistD、IBM Standalone Solutions Configuration Tool

While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()

  • A、IBM DS5000 Cabling Tool
  • B、IBM e-Configurator Tool
  • C、IBM Pre-Installation TDA Checklist
  • D、IBM Standalone Solutions Configuration Tool

相关考题:

A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble.Which resource should be consulted while developing the solution options?()A. Disk MagicB. TPC for DataC. CLARiiON Procedure GeneratorD. System Storage Interoperability Center

A customer has installed an IBM System Storage DS8700 with 20 TB of storage, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues since they have added new workloads. The customer asks the storage specialist for guidance.Which of the following actions should be recommended as a first step?()A. install the Performance Accelerator featureB. review the DS Storage Manager Major Event Log (MEL)C. add an expansion frame with additionalFibre Channel portsD. review the latest TPC for Disk study to identify the source of the performance issue

An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()A. the XIV system can be scaled by the addition of modulesB. XIV offers thin provisioning for all available host operating systemsC. reduced operating costs will pay for another XIV system in less than two yearsD. the management GUI allows the administrator tovirtualize the entire storage system quickly

A customer is looking to add disk storage. They are not satisfied with their existing EMCCLARiiON CX4-240. Instead of adding storage to the CX4, the customer wants to add a newsystem and migrate the LUNs from the EMC to the new storage system over a 6 month period,and not have any system disruption during this time. They are also interested in consolidating diskstorage management. Given these specifications, which of the following solutions would satisfythis customer’s requirements?()A、DS5100 and SAN Volume ControllerB、DS5100 and Tivoli Storage ManagerC、2 DS5100 systems with Remote MirroringD、DS5100 and Tivoli Storage Productivity Center for Data

A customer wants to collect performance data from a newly installed IBM System Storage DS8300 to determine if the system meets expected benchmarks using their application test data.  Which tool best gathers the performance data()A、IBM DS Storage ManagerB、IBM Tivoli Storage Resource ManagerC、IBM TotalStorage Productivity Center for DiskD、IBM TotalStorage Productivity Center for Data

The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()A、capacity above 500 TBB、first in customer locationC、a new model has been releasedD、sold without implementation service

A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()A、The room temperature has reached 23C (73.4F). B、A Blade within the chassis has been shut down. C、The ambient temperature in the data center has increased D、One of the additional System X servers in the BladeCenter rack has failed.

A customer is interested in purchasing a new IBM System Storage TS3500 Tape Library. Which ofthe following documents should be used first to guide the Business Partner to verify theenvironment?()A、TS3500 RedbookB、TS3500 Operators ManualC、Solution Assurance Product Review (SAPR) GuideD、TS3500 Product Installation and Planning Guide

A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch. Which of the following should be mentioned to the customer regarding the NPIV switch?()A、Youcan not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet SwitchB、Using blade servers with the NPIV switch will require morefibre ports on the external fibre switchC、Storage devices likeFibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switch.D、The NPIV switch will count against the number of domains in a fabric

An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()A、the XIV system can be scaled by the addition of modulesB、XIV offers thin provisioning for all available host operating systemsC、reduced operating costs will pay for another XIV system in less than two yearsD、the management GUI allows the administrator tovirtualize the entire storage system quickly

A customer is interested in purchasing a new IBM System Storage DS8000 solution to consolidateolder ESS and F20 storage systems. What should be done first, prior to final proposaldevelopment?()A、perform a Disk Magic study B、review eConfig with a technical specialist C、confirm that the customer has enough ports available in the SAN infrastructure D、submit configuration to IBM System Storage Interoperability Center for validation

A customer has installed an IBM System Storage DS8700 with 20 TB of storage, two-way processor version, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues.  To address this performance consideration with minimal cost to the customer, which of the following should be the FIRST step to resolve the problem()A、add an expansion frame with additionalFibre Channel portsB、increase the amount of storage by 20 TBC、conduct a Disk Magic study to identify the source of the performance issueD、add additionalFibre Channel ports to the existing DS8700

A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()A、A solution sizing questionnaireB、Verify the customer has the proper racksC、A Technical Delivery AssessmentD、Verify the customer has enough cooling in the computer room

A small bio-tech company is interested in implementing an IBM System Storage solution. Which ofthe following tools can be used to help justify the cost of our solution to a customer?()A、TCOnowB、Disk Magic C、Capacity Magic D、System Storage Productivity Center (SSPC)

A customer has installed an IBM System Storage DS8700 with 20 TB of storage, 32 GB cache, and 16 Fibre Channel ports. The customer is beginning to experience throughput performance issues since they have added new workloads. The customer asks the storage specialist for guidance. Which of the following actions should be recommended as a first step?()A、install the Performance Accelerator featureB、review the DS Storage Manager Major Event Log (MEL)C、add an expansion frame with additionalFibre Channel portsD、review the latest TPC for Disk study to identify the source of the performance issue

A customer has the need for performance monitoring of an IBM System Storage DS8000.  Which product does the customer need()A、System Storage Productivity CenterB、Tivoli Storage Productivity Center for DataC、Tivoli Storage Productivity Center for DiskD、Tivoli Storage Productivity Center for Fabric

A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()A、You can not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch B、Using blade servers with the NPIV switch will require more fibre ports on the external fibre switch C、Storage devices like Fibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switchD、The NPIV switch will count against the number of domains in a fabric

A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()A、Disk MagicB、TPC for DataC、CLARiiON Procedure GeneratorD、System Storage Interoperability Center

A customer purchased a new IBM xSeries x445.  They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server.  The rack houses an existing UPS unit for the entire rack.  Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()A、Have optional Fibre Channel and Ethernet switches been installed in the server?B、What is the available kVA value of the UPS?C、Are there sufficient empty socket outlets in the UPS?D、What is the impact on the power consumption of the data center cooling system?

An industrial sector customer has requested an IBM System x3755 for a high performance computing application. Pricing is the most sensitive decision factor for this customer. They are looking for an entry-level storage solution because the application needs to access about 12 TB of data, with an expected future growth of 10-15 percent. As this is the only server accessing this amount of data, the customer does not want to have a SAN.  What should the System x Sales Specialist recommend? ()A、DS3300 iSCSI-based solutionB、One MegaRAID 8480 card with four EXP3000 unitsC、DS4000 Fibre Channel solution with EXP810 expansion unitsD、DS3400 Fibre Channel solutionWArialZ

单选题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()AYou can not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch BUsing blade servers with the NPIV switch will require more fibre ports on the external fibre switch CStorage devices like Fibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switchDThe NPIV switch will count against the number of domains in a fabric

单选题A customer is looking to add disk storage. They are not satisfied with their existing EMCCLARiiON CX4-240. Instead of adding storage to the CX4, the customer wants to add a newsystem and migrate the LUNs from the EMC to the new storage system over a 6 month period,and not have any system disruption during this time. They are also interested in consolidating diskstorage management. Given these specifications, which of the following solutions would satisfythis customer’s requirements?()ADS5100 and SAN Volume ControllerBDS5100 and Tivoli Storage ManagerC2 DS5100 systems with Remote MirroringDDS5100 and Tivoli Storage Productivity Center for Data

单选题A small bio-tech company is interested in implementing an IBM System Storage solution. Which ofthe following tools can be used to help justify the cost of our solution to a customer?()ATCOnowBDisk Magic CCapacity Magic DSystem Storage Productivity Center (SSPC)

单选题A customer purchased a new IBM xSeries x445.  They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server.  The rack houses an existing UPS unit for the entire rack.  Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()AHave optional Fibre Channel and Ethernet switches been installed in the server?BWhat is the available kVA value of the UPS?CAre there sufficient empty socket outlets in the UPS?DWhat is the impact on the power consumption of the data center cooling system?

单选题While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()AIBM DS5000 Cabling ToolBIBM e-Configurator ToolCIBM Pre-Installation TDA ChecklistDIBM Standalone Solutions Configuration Tool

单选题A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()AA solution sizing questionnaireBVerify the customer has the proper racksCA Technical Delivery AssessmentDVerify the customer has enough cooling in the computer room

单选题A customer has the need for performance monitoring of an IBM System Storage DS8000.  Which product does the customer need()ASystem Storage Productivity CenterBTivoli Storage Productivity Center for DataCTivoli Storage Productivity Center for DiskDTivoli Storage Productivity Center for Fabric