单选题A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()AThe room temperature has reached 23C (73.4F). BA Blade within the chassis has been shut down. CThe ambient temperature in the data center has increased DOne of the additional System X servers in the BladeCenter rack has failed.
单选题
A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()
A
The room temperature has reached 23C (73.4F).
B
A Blade within the chassis has been shut down.
C
The ambient temperature in the data center has increased
D
One of the additional System X servers in the BladeCenter rack has failed.
参考解析
解析:
暂无解析
相关考题:
A customer has ordered a rack, a p650, two p630s, and two p615s. During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit. However, the specialist knows that the p650 will be racked, but the other systems will arrive separately. In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()A、Because additional systems would require more power receptaclesB、Because the customer may need to do additional facilities planningC、Because the customer needs additional funding to cover the servicesD、Because postponing the eventual discussion will likely lead to customer dissatisfaction
A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()A、12 B、10 C、8 D、6
A manufacturing customer has liminted space remaining in their data center and is concerned about rising power costs. The customer applications require very large amounts of memory. They want server redundancy and no downtime. Which of the following architectural features should be discussed with them?()A、iDataPlex with vSphereB、Four x3550 M3 servers,vSphere and racksC、BladeCenter, HX5 blades and vSphereD、One x3950 X5 servers andvSphere
A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack. Which IBM BladeCenter Chassis should be recommended? ()A、BladeCenter EB、BladeCenter HC、BladeCenter TD、BladeCenter HT
A customer is considering an Intel processor-based blade solution from a competitor. The customer is willing to share only the information that the competitor offers 96 Xeon processors per rack. Which of the following IBM BladeCenter E benefits should the Sales Specialist emphasize first?()A、Redundant BlowersB、Availability of AMD and Intel ProcessorsC、Processor densityD、Advanced Management Module
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()A、An IBM BladeCenter H chassis for the JS22 Blade serversB、A concurrent KVM daughter cardC、A pair of IBM BladeCenter Power SuppliesD、A second Management Module
A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers. Which of the following should the Sales Specialist emphasize to address the pricing difference?()A、Higher rack density that reduces data center footprintsB、Internal upgrades that only IBM can offerC、Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches D、The Rear Door Heat eXchanger that only IBM can offer
A customers has asked you to investigate their current x86 server environment to determinate if they can achieve a reduction in power and rack consumption. They plan to implement VMware and the local storage shared. Which of the following consolidation proposals meets these needs?()A、BladeCenter SB、BladeCenter HC、BladeCenter ED、BladeCenter HT
A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()A、Redundant power supplies on the serversB、Redundant PDUs in the rackC、edundant power supplies in the servers and redundant PDUs in the rackD、Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)
A customer needs a new database server. The database application has a high memory overhead but does not benefit from 8-way processing. They would like a rack mountable system, which will support four Xeon processors with 512KB of L2 cache and 16GB of main system memory. Which of the following will satisfy the customer’s requirements?()A、x445 with four Xeon DP processors and 16GB of memory in a single SMP moduleB、x445 with four Xeon MP processors and 16GB of memory in a single SMP moduleC、x445 with two SMP modules each containing two Xeon DP processors and 8GB of memoryD、x445 with two SMP modules each containing two Xeon MP processors and 8GB of memory
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A、The customer used their IBM Customer NumberB、The customer has activated their base warrantyC、The customer purchased Remote Technical Support ServicepacD、The customer escalated the issue to the Duty Manager
A medical customer wants to deploy around 8TB integrated storage on a BladeCenter.Which of the following should be discussed with this customer?()A、SATA internal disksB、iSCSIC、Solid State StorageD、SAS Internal Disk
A manufacturing customer wants a consolidation solution that provides scale-out capability and the highest processor density per rack unit. Which of the following solution meets customer’s requirement?()A、x3650 M3 with Microsoft Virtual ServerB、BladeCenter JS43 with VMwareC、x3850 X5 with VMwareD、BladeCenter HS22V with VMware
A customer currently has a large group of older 1U servers. Each dedicated to aunique application. Quick provisioning of the servers is important to the customer. Which of the following approaches addresses this situation?()A、VirtualizationB、Replace each server with energy efficient serversC、Upgrade in place to improve performanceD、Implement BladeCenter
A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives (2)two physical Microsoft Active Directory Servers (3)twenty-two physical Citrix servers (4)three physical Web servers (5)one physical vCenter server (6)eight vSphere hosts Which configuration minimally satisfies these requirements?()A、Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modulesB、Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modulesC、Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modulesD、Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules
A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()A、SAN Switch modulesB、BlowersC、Power suppliesD、Battery backup units
单选题A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()AAn IBM BladeCenter H chassis for the JS22 Blade serversBA concurrent KVM daughter cardCA pair of IBM BladeCenter Power SuppliesDA second Management Module
单选题A customer has a BladeCenter H chassis with a single AMM. The AMM is defective. Which of the following is the method to backup the existing AMM so the new AMM automaticlally picks up the configuration? ()ABack up the AMM configuration to a file BBack up the AMM configuration to the chassis CBack up the AMM using IBM Systems Director DBack up the AMM using Tivoli Storage Manager
单选题A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()AThe room temperature has reached 23C (73.4F). BA Blade within the chassis has been shut down. CThe ambient temperature in the data center has increased DOne of the additional System X servers in the BladeCenter rack has failed.
单选题A University customer has a BladeCenter H fully populated with LS21 Blades, a single AMM, and four power modules. The BladeCenter has been running flawlessly for three months. One day an administrator discovers that they cannot view video on blades 9-12 either locally or remotely even though they still appear to be running. The video works on all of the other blades. Which of the following is the cause of the video problem?()AA power module has failed and there is not enough power to see video on all blades.BMUX 3 on theBladeCenter backplane has failed.CA firmware update is required on the AMM.DA second AMM is required to view video on blades 9-14.
单选题A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration: (1)two Brocade 20-Port SAN Switch Modules (2)two Nortel Networks 1/10 GB Uplink ESM (3)a redundant AMM What is the minimum number of power supplies needed for this configuration to have full redundancy?()A4B3C2D8
单选题A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives (2)two physical Microsoft Active Directory Servers (3)twenty-two physical Citrix servers (4)three physical Web servers (5)one physical vCenter server (6)eight vSphere hosts Which configuration minimally satisfies these requirements?()AThree IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modulesBThree IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modulesCFour IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modulesDThree IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules
单选题Your customer has converted from traditional servers to BladeCenter technology and has a requirement for an RSA adapter on a new BladeCenter server. Which of the following options would you use? ()ARemote Supervisor Adapter II (RSA II Slimline)BManagement Module, which comes standard on the BladeCenterCAcoustic Attenuation ModuleDEthernet NICs
单选题A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()ASupport for10Gb internal networkBSupport for SSDCSupport for integrated disk drivesDSupport for8Gb FC Switch Modules
单选题A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()AThe customer used their IBM Customer NumberBThe customer has activated their base warrantyCThe customer purchased Remote Technical Support ServicepacDThe customer escalated the issue to the Duty Manager
单选题A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()A6B8C10D12
单选题A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which is the minimum amount of rack space required to implement the solution of the following?()A32UB21UC25UD22U
单选题A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack. Which IBM BladeCenter Chassis should be recommended? ()ABladeCenter EBBladeCenter HCBladeCenter TDBladeCenter HT