单选题The SWL of the derricks are different from 5 tons to 10 tons.()A吊杆的安全工作负荷从5吨到10吨不等。B安全规则规定,吊杆是5吨和10吨。C吊杆自身的重量从5吨到10吨不等。D起重机的安全工作负荷从5吨到10吨不等。

单选题
The SWL of the derricks are different from 5 tons to 10 tons.()
A

吊杆的安全工作负荷从5吨到10吨不等。

B

安全规则规定,吊杆是5吨和10吨。

C

吊杆自身的重量从5吨到10吨不等。

D

起重机的安全工作负荷从5吨到10吨不等。


参考解析

解析: 暂无解析

相关考题:

We suggest your order()a minimum quantity of 10,000 tons. A、call forB、calls forC、call onD、call up

From ________ the information concerning the tons per inch or centimeter immersion of a vessel shall be usually found.A.Stability CurveB.Deadweight ScaleC.Table of AzimuthD.Freeboard Assignment

A shipboard oil pollution emergency plan is required of ______.A.all vessels, regardless of size and commercial applicationB.any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardC.an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveD.an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above

The Tonnage Certificate indicates ______.A.deadweight tonsB.displacement tonsC.net tons and gross tonsD.volume tons

The SWL of the derricks are different from 5 tons to 10 tons.()A、吊杆的安全工作负荷从5吨到10吨不等。B、安全规则规定,吊杆是5吨和10吨。C、吊杆自身的重量从5吨到10吨不等。D、起重机的安全工作负荷从5吨到10吨不等。

水手应该知道船上吊杆的安全工作负荷。()A、Sailors should know the SWL of cranes on board their ship.B、Sailors should know the SWL of derricks on board their ship.C、Officers should know the SWL of derricks on board their ship.D、Officers should know the SWL of cranes on board their ship.

We are in receipt of your letter dated Jan 8, ____ we are pleased to learn that you want to order 100 tons of the subject goods.A、in whichB、from whichC、to whichD、at which

()an order for one thousand tons or more we grant a special discount of 10%.A、onB、ForC、ToD、On

这个吊杆的安全工作负荷是6吨。()A、The SWL of the derrick is five tons.B、The SWL of the heavy derrick is six tons.C、The SWL of the derrick is six tons.D、The SWL of the crane is six tons.

Lifting capacities of derricks vary from three to ten tons. ()A、吊杆的起吊能力为三至十吨不等B、克令吊的起吊能力为三至十吨不等C、他们每24个小时值两次班D、起重机的起吊能力为为三至十吨不等

单选题If your vessel bums 8 tons of fuel per hour at 15 knots, how many tons per hour will it burn at 18 knots?()A1382 tonsB1561 tonsC1600 tonsD1637 tons

单选题这个吊杆的安全工作负荷是6吨。()AThe SWL of the derrick is five tons.BThe SWL of the heavy derrick is six tons.CThe SWL of the derrick is six tons.DThe SWL of the crane is six tons.

单选题The Tonnage Certificate indicates ().Adeadweight tonsBdisplacement tonsCnet tons and gross tonsDvolume tons

单选题Every new crude oil tanker of 20000 tons deadweight and above and every new product carrier of 30000 tons deadweight and above shall be()with segregated ballast tanks.AcompliedBprovidedCdividedDsupplied

单选题At least()two-way VHF radiotelephone apparatus shall be provided on every cargo ship of 300 tons gross tonnage and upwards but less than 500 tons gross tonnage.AoneBtwoCthreeDfour

单选题From()the information concerning the tons per inch or centimeter immersion of a vessel shall be usually found.Avariation curveBdead weight scaleCtable of azimuthDfreeboard assignment

单选题A shipboard oil pollution emergency plan is required of ().Aall vessels, regardless of size and commercial applicationBany barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardCan oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveDan oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above

单选题A shipboard Oil Pollution Emergency Plan is required of().Aall vessels,regardless of size and commercial applicationBany barge or ship constructed or operated in such a manner that no oil in any form can be carried aboardCan oil tanker of 150 gross tons and above,or other ship of 400 gross tons and aboveDan oil tanker of 400 gross tons and above,or other ships of 150 gross tons and above

单选题The designed () is 20 tons per day, but the fresh water generator can only distil 15 tons at present.AdisplacementBweightCpowerDcapacity

单选题The ()of the derrick is 5 tons.AGTBSWLCDWTDTDW

单选题At least two two-way VHF radiotelephone apparatus shall be provided on every cargo ship of()tons gross tonnage and upwards but less than 500 tons gross tonnage.A200B300C400D800

单选题()an order for one thousand tons or more we grant a special discount of 10%.AonBForCToDOn

单选题What is MTI?().AThe foot/tons needed to trim the vessel by 1 inchBThe foot/tons needed to trim the vessel by 1 footCThe moments needed to trim the vessel by 1 centimeterDThe amount of vessel will trim when loading 100 tons 100 feet from the tipping Center

单选题The designed capacity is 25 tons a day, but the fresh water generator can only () 22 tons at present.AconsumeBdistillCrunDoperate

单选题From()the information concerning the tons per inch or centimeter immersion of a vessel shall be usually found.AStability curveBDeadweight scaleCTable of AzimuthDFreeboard assignment

单选题Lifting capacities of derricks vary from three to ten tons. ()A吊杆的起吊能力为三至十吨不等B克令吊的起吊能力为三至十吨不等C他们每24个小时值两次班D起重机的起吊能力为为三至十吨不等

单选题Every()shall be fitted with a cargo tank cleaning system using crude oil washing.Aexisting crude oil tanker of 20000 tons deadweight and underBnew crude oil tanker of 20000 tons deadweight and underCexisting crude oil tanker of 20000 tons deadweight and aboveDnew crude oil tanker of 20000 tons deadweight and above