名词解释题环发 circular departure
名词解释题
环发 circular departure
参考解析
解析:
暂无解析
相关考题:
Which of the following is NOT a condition for deadlock?A.StarvationB.Circular waitC.No preemptioD.Mutual Exclusion
Tospeedupthe______ofletters,thePostOfficeintroducedautomaticsorting.A)treatmentB)deliveryC)transmissionD)departure
The carrying vessel chartered by the Seller shall sail and arrive at the port of departure within the normal and reasonable period of time.()
The circular steel structure installed around the propeller of a towboat is the______.A.nozzleB.shroudC.strutD.Hood
A generally circular low pressure area is called a(n)______.A.cycloneB.anticycloneC.cold frontD.occluded front
汉译英:“有效期限;签发日期;运输方式”,正确的翻译为:()。A. valid period ; date of dispatch ; means of transportB. departure time ; issuing date ; means of conveyanceC. departure time; date of dispatch; means of conveyanceD. valid period; issuing date; means of transport
汉译英:“装货港;到达日期”,正确的翻译为:() A.Port of loading ; Date of departure B.Port of discharge ; Date of departure C.Port of loading ; Date of arrival D.Port of discharge ; Date of arrival
汉译英:“原产地;有效期限”,正确的翻译为( )。A. place of issue ; Departure time B. place of origin ; Departure timeC. place of issue ; Valid period D. place of origin ; Valid period
进场和离场为同一条航线。()A、Approach and Leave are on the same route.B、Arrival and Departure are on the same route.C、Approach and Departure are on the same route.
单选题The Departure Report,required by vessels participating in AMVER,must be sent().Aas soon as practicable on leaving portBprior to departureCwithin 24 hours of departureDwithin 12 hours of departure
单选题A coastal current().Ais generated by waves striking the beachBflows outside the surf zoneCflows in a circular patternDis also known as a longshore current
单选题The circular steel structure installed around the propeller of a towboat is the().AnozzleBshroudCstrutDhood
单选题The projection on a shaft designed to change circular motion into up and down or back and fore motion is called ().AwheelBcrankshaftCrunning gearDcam