shore crane ()A、龙门吊B、浮吊C、岸吊D、起重机

shore crane ()

  • A、龙门吊
  • B、浮吊
  • C、岸吊
  • D、起重机

相关考题:

The electrical components for each single crane are installed in its ______.A.crane houseB.machinery baseC.turntableD.All of the above

The net productivity per gang-hour can be improved through a decrease of ______.A.cranes/derricksB.crane/derrick cyclesC.crane/derrick cycle timeD.weight per package

The term LEE SHORE refers to the ______.A.shore on the lee side of the vesselB.shore that is in the leeC.western shore of the Lesser AntillesD.shore in a harbor of refuge

On no account ______ to be exceeded.A.is the SWL of the craneB.are the SWL of the craneC.the SWL of the crane isD.the SWL of the crane are

Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels ________.A.A centerline crane can never be operated in tandemB.One crane is able to work one end of two adjacent hatchesC.These cranes are more economical and weigh less than outboard-mounted cranesD.One crane is able to work both sides of the ship

Which of the following statements is TRUE regarding crane operations ________.A.Radio communications allow the crane operator to disregard the use of hand signalsB.The crane operators and signalman must be familiar with the correct hand signalsC.The forward cranes can be operated from the bridgeD.The aft cranes can be operated from the aft steering station

The international shore connection ______.A.Allows hook up of fire fighting water from shore facilitiesB.Satisfies pollution prevention requirementsC.Allows emergency use of the fire main for deballastingD.Permits discharge of waste oil to shore facilities

During which condition should the operator of a pedestal crane shutdown operations ________.A.Bunkering barge alongsideB.Potable water spill on deckC.Crane hydraulic hose burstsD.Trim greater than 4 feet

浮吊()A、gantry craneB、floating craneC、shore craneD、overhead crane

滨海(shore)

前滨(fore shore)

送撇缆上岸。()A、Send rope to shore .B、Send heavy line to shore .C、Send heaving line ashore .D、Send light line ashore .

I think you’d better use the ()(岸吊).A、derrickB、heavy derrickC、shore craneD、floating crane

水鹤 water crane

英译中:Crane

单选题The ()(笨重货) must be handled by jumbo boom or shore crane.Aawkward cargoBdrummed cargoCcased cargoDheavy cargo

单选题On no account()to be exceeded.Ais the S.W.L. of the craneBare the S.W.L. of the craneCthe S.W.L. of the crane isDthe S.W.L.of the crane are

单选题On no account()to be exceeded.Ais the SWL of the craneBare the SWL of the craneCthe SWL of the crane isDthe SWL of the crane are

单选题Which of the following statements is TRUE regarding crane operations().ARadio communications allow the crane operator to disregard the use of hand signalsBThe crane operators and signalman must be familiar with the correct hand signalsCThe forward cranes can be operated from the bridgeDThe aft cranes can be operated from the aft steering station

单选题Which action(s) should the operator of a pedestal crane take if crane control is lost?()ALet go of both control levers and return to neutral positionBPress the emergency stopCNotify the mate on watchDAll of the above

单选题My radar is not working.I require shore based radar assistance.Is shore based radar assistance()?AusedBavailableCin useDcan be used

单选题Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().AA centerline crane can never be operated in tandemBOne crane is able to work one end of two adjacent hatchesCThese cranes are more economical and weigh less than outboard-mounted cranesDOne crane is able to work both sides of the ship

单选题What following is not among the functions of SOLAS ships?()Areceive shore-to-ship distress alertingBtransmit ship-to-shore distress alertingCreceive message for public correspondenceDtransmit and receive locating signals

名词解释题水鹤 water crane

单选题In a ordinary cargo crane, () is fitted to rotate the crane.Athe slewing motorBthe lulling motorCthe hoisting motorDnone of the above

单选题An oceangoing ship of 400 gross tons and above must be fitted with a standard discharge shore connectionWhat is the size of the bolt circle diameter of the shore connection required to transfer oily ballast to a shore side reception facility?()A125 mmB183 mmC215 mmDIt depends on outside pipe diameter

单选题The term LEE SHORE refers to the().Ashore on the lee side of the vesselBshore that is in the leeCwestern shore of the Lesser AntillesDshore in a harbor of refuge