单选题A sales team has proposed an IBM System Storage DS8100 configured with 10 TB, split equallybetween IBM System z and IBM System p. The System z environment requires point-in-time copyand the System p environment does not. For the System z environment, 3 TB have beenconfigured with an additional 2 TB for point-in-time copy. What is the least expensive licensescope for point-in-time copy?()AAll and 10 TBBCKD and 2 TBCCKD and 5 TBDCKD and 10 TB
单选题
A sales team has proposed an IBM System Storage DS8100 configured with 10 TB, split equallybetween IBM System z and IBM System p. The System z environment requires point-in-time copyand the System p environment does not. For the System z environment, 3 TB have beenconfigured with an additional 2 TB for point-in-time copy. What is the least expensive licensescope for point-in-time copy?()
A
All and 10 TB
B
CKD and 2 TB
C
CKD and 5 TB
D
CKD and 10 TB
参考解析
解析:
暂无解析
相关考题:
单选题A mainframe customer wants to add additional disk capacity to an IBM System Storage DS8100to accommodate a projected workload increase. They ask the storage specialist to assess theimpact of the additional capacity on the DS8100 without other upgrades. Which tool bestassesses the impact of the upgrade on response times?()ACapacity MagicBTPC for DiskCRMF disk reportsDDisk Magic
单选题Which document provides guidelines to support planning and provides pre-installation steps forthe IBM System Storage DS8000?()ASolution Assurance Product Review GuideBDS8000 Introduction and Planning GuideCDS8000 Installation GuideDSystem Assurance Product Review Guide
单选题Metro Mirror pairs are set up between volumes in LSSs, usually in separate locations anddifferent disk subsystems. These logical paths are defined over physical links between the disksubsystems. What is the maximum number of logical paths per physical link?()A128B256C512D1024
单选题A mainframe customer with a 2105-800 storage subsystem will be migrating to a new data center.They will be replacing existing servers with newer hardware and the 2105 subsystem with an IBMSystem Storage DS8100. The data centers are 613 kilometers apart. The data migration andproduction cutover must be accomplished with minimal disruption. Which solution best meetsthese requirements?()AMetro MirrorBHSMCSVCDGlobal Copy
单选题Which configuration actions can be performed by using the DSCLI on IBM System StorageDS6000 and DS8000 servers?()AAssign RAID ranks to extent pools and combine storage extent poolsBAssign RAID ranks to extent pools and create and assign volumes to hostsCCombine storage extent pools and invoke a server failover/fallbackDInvoke a server failover/fallback and create and assign volumes to hosts
单选题A System z customer is planning to deploy the IBM System Storage DS6800 in each of threesmall data centers located around a large city. A backup data center with an IBM System StorageDS8100 will serve as the disaster recovery facility. Which advanced function can the customerimplement to meet disaster recovery requirements?()AGlobal Mirror for zSeriesBMetro MirrorCGlobal CopyDMetro/Global Mirror
单选题Which tasks are necessary to perform a data migration using DFSMS?()AMicrocode review and data classificationBInitialization and data classificationCMicrocode review, ACS routine, and back up of dataDData classification, ACS routine, and back up of data
单选题Which tasks can NOT be performed at the management console if the Client ID is being used?()AReboot the HMCBAccess the storage managerCShut down the consoleDAccess the storage system diagnostics