单选题Electrical wiring on all “T-Boats” must be()。Aconcealed to prevent mechanical damageBconcealed so the boat can be maintained more easilyCprotected from the weatherDin an accessible place behind the ceiling

单选题
Electrical wiring on all “T-Boats” must be()。
A

concealed to prevent mechanical damage

B

concealed so the boat can be maintained more easily

C

protected from the weather

D

in an accessible place behind the ceiling


参考解析

解析: 暂无解析

相关考题:

Dry powder is used to put out ________A.electrical fireB.oil fireC.common firesD.all kinds of fires

An electrical device which prevents an action from occurring until all other required conditions are met is called a/an _____.A.limitB.monitorC.modulatorD.interlock

The electrical components for each single crane are installed in its ______.A.crane houseB.machinery baseC.turntableD.All of the above

Given two different character sets (A and B), which of the following must be true for A to be considered a strict superset of B?() A. A must contain all of the characters defined in BB. A must be UnicodeC. The encoded values in A must match the encoded values in B for all characters defined in BD. A must be a multibyte character setE. The encoded values in A must match the encoded values in B for all numeric and alphabetic characters in B

We must do something to stop the pollution, and ______ we must make all the people realize how serious the problem is. A.after allB.above allC.in allD.at all

Electrical wiring on all "T-Boats" must be ______.A.concealed to prevent mechanical damageB.concealed so the boat can be maintained more easilyC.protected from the weatherD.in an accessible place behind the ceiling

Which statement concerning reserve sources of energy for GMDSS is FALSE ________.A.While the ship is at sea,there must be available at all times a supply of electrical energy sufficient to operate the radio installations and to charge any batteries used as part of a reserve source of energyB.Both the VHF and MF/HF installations must be simultaneously suppliedC.A means of ensuring a continuous supply of electrical power must be provided to all GMDSS equipment that could be affected by an interruption in powerD.If a UPS or equivalent is used to supply power to the ship's GPS receiver or other source of positional information,a means must be provided to ensure the continuous supply of the information in the event of a failure to the ship's main or emergency source of power

All electrical appliances aboard a vessel should be grounded to ______.A.prevent them from falling when the vessel rollsB.protect personnel from electrical shockC.increase their operating efficiencyD.prevent unauthorized personnel from operating them

Given two different character sets (A and B), which of the following must be true for A to be considered a strict superset of B?()A、 A must contain all of the characters defined in BB、 A must be UnicodeC、 The encoded values in A must match the encoded values in B for all characters defined in B D、 A must be a multibyte character setE、 The encoded values in A must match the encoded values in B for all numeric and alphabetic character

船舶离港之前,所有的吊杆必须纵向收放好。()A、Before leaving the harbour, all derricks must be stowed.B、After leaving the harbour, all derricks must be stowed fore and aft.C、Before leaving the harbour, all derricks must be stowed fore and aft.D、Before leaving the harbour, all heavy derricks must be stowed fore and aft.

() must know the location as well as the operation of the life-saving and fire-fighting appliances.A、All officersB、All engineersC、All the crewD、All sailors

Which of the following are true of Ethernet technology?()A、Hosts use a logical ring topology.B、Hosts use a logical bus topologyC、Hosts must wait for an electronic signal to transfer data.D、Hosts are directly connected to a wiring concentrator called a MSAU.

Lightening causes a power surge and leads to a fire in the datacenter. Following emergency procedures, which of the following is the FIRST thing the server administrator should do?()A、Turn off all electrical powerB、Remove all backup mediaC、Implement fire suppressionD、Evacuate all personnel

What must be done in order to automatically close the purchase requisition (PR) after one or more purchase orders (PO) have been created?  ()A、 All PR lines must be assigned to a PO.B、 The PR must be in the Approved status.C、 The PR must enter the workflow process.D、 All manual company input fields must be completed.

单选题Water fog from an all-purpose nozzle may be used to().Afight an electrical fireBfight a magnesium fireCeliminate smoke from a compartmentDAll of the above

单选题Accidental grounds in a shipboard electrical system must be repaired as soon as possible as they will ()Aresult in immediate power outagesBdamage circuit breakersCappear on the ground detection systemDdamage insulation and may cause outages

单选题When a rescuer finds an electrical burn victim in the vicinity of live electrical equipment or wiring,his first step is to().Aflush water over any burned area of the patientBapply ointment to the burned areas on the patientCget assistance to shut down electrical power in the areaDremove the patient from the vicinity of the live electrical equipment or wiring

单选题Which statement concerning reserve sources of energy for GMDSS is FALSE().AWhile the ship is at sea,there must be available at all times a supply of electrical energy sufficient to operate the radio installations and to charge any batteries used as part of a reserve source of energyBBoth the VHF and MF/HF installations must be simultaneously suppliedCA means of ensuring a continuous supply of electrical power must be provided to all GMDSS equipment that could be affected by an interruption in powerDIf a UPS or equivalent is used to supply power to the ship's GPS receiver or other source of positional information,a means must be provided to ensure the continuous supply of the information in the event of a failure to the ship's main or emergency source of power

单选题A ground can be defined as an electrical connection between the wiring of a motor and its().Ashunt fieldBcircuit breakerCmetal frameworkDinter-pole

多选题Given two different character sets (A and B), which of the following must be true for A to be considered a strict superset of B?()AA must contain all of the characters defined in BBA must be UnicodeCThe encoded values in A must match the encoded values in B for all characters defined in BDA must be a multibyte character setEThe encoded values in A must match the encoded values in B for all numeric and alphabetic characters in B

单选题To repair a small electrical motor that has been submerged in saltwater, you should ().Awash it with fresh water and apply an external source of heatBrenew the windingsCsend it ashore to an approved service facilityDrinse all electrical parts with a carbon tetrachloride cleaning solvent and then blow dry the motor with compressed air

单选题The source of energy fitted in GMDSS complying vessels must be().Athe main source of energyBemergency source of electrical powerCthe reserve source of energyDall of above

单选题All electrical appliances aboard a vessel should be grounded to().Aprevent them from falling when the vessel rollsBprotect personnel from electrical shockCincrease their operating efficiencyDprevent unauthorized personnal from operating them

多选题Which three options are prerequisites to configuring Cisco AutoOoS?()ACisco Express Forwarding (CEF) must be globally enabled.BPrior to the enabling of the Cisco AutoOoS feature, the bandwidth command must be applied on all interfaces or subinterfaces.CAfter the enabling of the Cisco AutoOoS feature, the bandwidth command must be applied on all interfaces or subinterfaces .DOoS policies must be enabled on all interfaces that will participate in the AutoOoS configuration.EAn IP address must be configured on all low-bandwidth interfaces (768 kb/s or lower) that will participate in the AutoOoS configurationFAn IP address must be configured on all interfaces that will participate in the AutoOoS configuration

单选题What must be done in order to automatically close the purchase requisition (PR) after one or more purchase orders (PO) have been created?  ()A All PR lines must be assigned to a PO.B The PR must be in the Approved status.C The PR must enter the workflow process.D All manual company input fields must be completed.

单选题Storage batteries on T-Boats must be located().Ain sight of the main engine(s)Bin a tray lined with suitable material that resists damage from the electrolyteCin locked closets with restricted ventilationDnear the bilge to lower the center of gravity and improve stability

单选题Which action should be taken when an auxiliary boiler in is operation?()AClean all electrical connectionsBLift the relief valves by handCInspect and clean all solenoid valvesDInspect for oil and water leaks