单选题Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().ALCGBtransverse momentCrighting momentDinclining moment
单选题
Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().
A
LCG
B
transverse moment
C
righting moment
D
inclining moment
参考解析
解析:
暂无解析
相关考题:
On a vessel, multiplying a load’s weight by the distance of the load’s center of gravity above the baseline results in a(n) ______.A.transverse momentB.vertical momentC.righting momentD.inclining moment
Where is the GMDSS Radio Logbook kept aboard ship?A.Attached to the Deck LogbookB.At the principal radio operating locationC.In the Chief Mate’s officeD.In the Master’s office
The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the ______.A.Maximum counter weight requiredB.Minimum horsepower requiredC.Hoist rope strengthD.Allowable load
Floors aboard ship are ______.A.frames to which the tank top and bottom shell are fastened on a double bottomed shipB.transverse members of the ships frame which support the decksC.longitudinal beams in the extreme bottom of a ship from which the ship's ribs startD.longitudinal angle bars fastened to a surface for strength
Aboard a vessel, dividing the sum of the longitudinal moments by total weight yields the vessel’s ______.A.inclining momentsB.righting momentsC.vertical momentsD.longitudinal position of the center of gravity
Aboard a vessel, dividing the sum of the vertical moments by total weight yields the vessel’s_____.A.height of the center of gravityB.vertical momentsC.righting momentsD.inclining moments
Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the mid-ship section results in the load’s ______.A.LCGB.longitudinal momentC.righting momentD.inclining moment
In relation to cargo gear, what does SWL mean ?______.A.Safe working loadB.Ship’s working liftC.Starboard wing liftD.Stress, weight, load
从水线到船底是“吃水”。()A、“From the centerline to the ship’s bottom” is “draft”.B、“From the keel to the ship’s bottom” is “draft”.C、The maximum distance from the waterline to the ship’s bottom is “draft”.D、“From the centerline to the ship’s main deck” is “draft”.
单选题The deadweight of a bulk carrier consists of().Athe weight of the ship's structure and its machineryBbunker and other consumable loadsCballast loadsDall those weights,such as the weight of the bunkers,ballast,provisions and cargo
单选题Floors aboard ship are().Aframes to which the tank top and bottom shell are fastened on a double bottomed shipBtransverse members of the ships frame which support the decksClongitudinal beams in the extreme bottom of a ship from which the ship's ribs startDlongitudinal angle bars fastened to a surface for strength
单选题In relation to cargo gear,what does SWL mean?().ASafe working loadBShip's working liftCStarboard wing liftDStress,weight,load
单选题Aboard a vessel,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().ATCGBtransverse momentCrighting momentDtransverse free surface moment
单选题Aboard a vessel, dividing the sum of the vertical moments by the total weight yields the vessel’s().Aheight of the center of gravity A.LCGBvertical momentCrighting momentDinclining moment
单选题Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in th eload’s().ATCGBtransverse momentCrighting momentDtransverse free surface moment
单选题0n a vessel,multipiying a load’s weight by the distance of the load’s center of gravity above the baseline results in a(n)().Atransverse momentBvertical momentCrighting momentDinclining moment
单选题On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().Awinch speedBboom strengthCload radiusDcable strength
单选题An electrical device which employs a stationary armature and a rotating electromagnetic field is used aboard ship as a ().Amagnetic amplifierBship’s service alternatorCthree-wire DC generatorDsaturable core reactor
单选题Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().ALCGBtransverse momentCrighting momentDinclining moment
单选题Aboard a vessel, dividing the sum of the vertical moment by the total weight yields the vessel’s().Avertical momentBtransverse position of the center of gravityCinclining momentDrighting moment
单选题Traditionally,the signal for fire aboard ship is().Amore than 6 short blasts and 1 long blast on the whistle,and the same signal on the general alarmBcontinuous sounding of the ship's whistle and the general alarm for at least 10 secondsC1 short blast on the whistleDalternating short and long blasts on the ship's whistle
单选题Which statement regarding garbage disposal is correct?()ARecords for ground garbage disposal are not required when disposal into the sea occurs more than 25 miles offshoreBDischarging or transfer of garbage while in port to a shore facility must he recordedCMaintaining records for the incineration of garbage aboard ship is not requiredDThe recording of garbage disposal should include the approximate weight
单选题The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().Amaximum counter weight requiredBminimum horsepower requiredChoist rope strengthDallowable load
单选题()is not a static load.AActual weight of the ship's structure,outfitting,equipment and machineryBBallast load(weight)CCargo loadDSlamming and sloshing load
单选题On a vessel,multiplying a load’s weight by the distance of the load’s center of gravity above the baseline results in a(n)().Atransverse momentBvertical momentCrighting momentDinclining moment
单选题Your assigned emergency station aboard ship can be found on the ship’s ()Astation billBclearance papersCcertificate of inspectionDpermit to proceed
单选题从水线到船底是“吃水”。()A“From the centerline to the ship’s bottom” is “draft”.B“From the keel to the ship’s bottom” is “draft”.CThe maximum distance from the waterline to the ship’s bottom is “draft”.D“From the centerline to the ship’s main deck” is “draft”.
单选题At the instant when a string of casing being run from a ship is landed in the well head,().Athe total weight in air of the casing string is removed from the shipBthe hook load (weight of the casing string) is removed from the shipCthe weight of the casing inside the riser is removed from the shipDthe weight of the casing string added to the weight of the fill-up mud is removed from the ship