单选题A customer has a new p5-550 running AIX 5.2 that is SAN-attached to a FAStT900. They have encountered hangs lasting over a minute on their new system during application load testing. They called the pSeries technical specialist for advice. Which of the following would be the most appropriate questions to determine their next step in resolving the problem?()AAre there any errors in the error log? Do they indicate any hardware or software errors?BHas performance data been collected? What do the results show in terms of I/O statistics?CHas performance data been collected? What do the results show in terms of CPU utilization? DWhat type of SAN switch is the customer using? What are the microcode levels on the switch?
单选题
A customer has a new p5-550 running AIX 5.2 that is SAN-attached to a FAStT900. They have encountered hangs lasting over a minute on their new system during application load testing. They called the pSeries technical specialist for advice. Which of the following would be the most appropriate questions to determine their next step in resolving the problem?()
A
Are there any errors in the error log? Do they indicate any hardware or software errors?
B
Has performance data been collected? What do the results show in terms of I/O statistics?
C
Has performance data been collected? What do the results show in terms of CPU utilization?
D
What type of SAN switch is the customer using? What are the microcode levels on the switch?
参考解析
解析:
暂无解析
相关考题:
A customer has many RS/6000s and POWER4 systems running different AIX applications. What should the customer do to best position themselves for the migration to POWER5?()A、Upgrade OS to AIX 5.2.B、Implement Micro-Partitioning.C、Upgrade HMC to support POWER5.D、Install Partition Load Manager.
Companycom has a p690 and currently has eight LPARs. They have purchased a p5 590 and wish to migrate their eight LPARs to the new server. The LPARs are running either AIX 5.2 or AIX 5.3 with the current maintenance. What is the LEAST disruptive method for this activity?()A、New install of AIXB、Migrate the 7040-61DC、Utilize alt_disk_installD、Use the enterprise back up strategy
Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?() A、APV features are not supported for some legacy POWER4 adaptersB、APV will require the most current maintenance level for AIX 5.2C、APV features will require that legacy POWER4 adapters be updated with new microcodeD、The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3
A customer has budget sign-off to purchase a new p5-550 2-way server to replace their aging 2-way 7025-6F0. They like the advantages of the Simultaneous Multi Processing (SMT) ability of this server. Their application is certified at AIX 5.2 and is scheduled for AIX 5.3 certification in six months. The Chief Information Officer is concerned that they will lose the budget if they do not purchase the server this fiscal year. What is the most relevant and cost-effective advice the pSeries technical specialist can offer?()A、Purchase a 4-way p630 to compensate for not using SMT.B、Purchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.C、Purchase the p5-550 server and install AIX 5.2 and enable SMT.D、Suspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.
A financial industry customer will consolidate their Intel-based servers to a p5-550 running AIX, and needs experienced technical services. What information should the account executive provide to the customer to assure them that the technical specialist has the required experience?()A、The technical specialist has supported multiple Cluster 1350 environments. References will be provided.B、The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.C、The technical specialist has worked on multiple UNIX consolidation projects. References will be provided.D、The technical specialist has worked on Linux consolidation efforts. References will be provided.
A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()A、A p650 running AIX v5.3B、A p5-550 running AIX v5.3C、A p5-570 running Advanced POWER VirtualizationD、Multiple rack-mounted p615s running dynamic LPAR
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications. The pSeries technical specialist should recommend purchasing which of the following?()A、p5 hardware, AIX 5.2, Virtual I/O ServerB、POWER4 hardware, AIX 5.3, Virtual I/O Server,C、p5 hardware, AIX 5.3, Advanced POWER Virtualization featureD、POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature
Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions. Which of the following data center servers can be used for this purpose?()A、p5-520 running Virtual I/O ServerB、p690 running AIX 5L V5.3C、p5-510 running AIX 5L V5.2D、p5-520 running two dedicated processor partitions
A system administrator has just finished upgrading a system to AIX 5.2. If there are future problems, the system administrator would like to add an entry to the AIX errorlog to record this event. Which of the following commands can be issued for this purpose?()A、/usr/bin/errmsg "System upgraded to AIX 5.2"B、/usr/bin/errlog "System upgraded to AIX 5.2"C、/usr/bin/errupdate "System upgraded to AIX 5.2"D、/usr/bin/errlogger "System upgraded to AIX 5.2"
A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future. Which pSeries system would be positioned best to meet this customer’s requirements?()A、p5-550 with the Advanced POWER Virtualization feature and AIX 5.2B、p5-550 with the POWER5 processor technology and AIX 5.2C、p5-570 with the Advanced POWER Virtualization feature and AIX 5.3D、p5-570 with the POWER5 processor technology and AIX 5.2
A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers. They have four identical new applications each requiring a minimum of seven processors and 96GB of memory. Which solution would best meet the customer’s requirements?()A、Two p670 serversB、Four p650 serversC、Two p5-570 serversD、Four p5-550 servers
Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()A、Verify the ISV application runs on AIX 5.2B、Power4 to POWER5 upgrades are not supported without a application recompileC、Check the placement and size of the boot logical volume and disk space requirements on the S85D、AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked
A customer has a new p5-550 running AIX 5.2 that is SAN-attached to a FAStT900. They have encountered hangs lasting over a minute on their new system during application load testing. They called the pSeries technical specialist for advice. Which of the following would be the most appropriate questions to determine their next step in resolving the problem?()A、Are there any errors in the error log? Do they indicate any hardware or software errors?B、Has performance data been collected? What do the results show in terms of I/O statistics?C、Has performance data been collected? What do the results show in terms of CPU utilization? D、What type of SAN switch is the customer using? What are the microcode levels on the switch?
Companycom tells the technical sales specialist that recent announcements state that virtual lan in the datacenter is the best option. The customer wants to use interpartition communication to save on adapters and increase performance. The systems are going to have shared and dedicated processor partitions. Some of the partitions will be running AIX 5.2 and some will be running AIX 5.3. The second p5 590 will be running a mixture of AIX 5.3 and Linux partitions with 2.6 kernel. What limitations of vlan/interpartition communication should be discussed with this customer?()A、Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet is supported on AIX 5L and Linux 2.5 and above. B、Virtual Ethernet can be used within groups of shared OR groups of dedicated processor partitions, but not both simultaneously. Virtual Ethernet comes with AIX 5L, and is supported in AIX 5.2 or AIX 5.3 partitions, but not Linux. C、Virtual Ethernet can be used in both shared and dedicated processor partitions. Virtual Ethernet can run in an AIX 5.3 or Linux 2.6 Kernel, but not AIX 5.2 partitions. Virtual Ethernet can only connect partitions within a single system. D、Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet can connect partitions between systems if the HMC is shared between systems.
A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()A、A minimum of two HBAs; the customer will need to download SDDB、A minimum of four HBAs; the customer will need to download SDDC、A minimum of two HBAs; the customer will need to configure MPIOD、A minimum of four HBAs; the customer will need to configure MPIO
A customer has a pSeries that needs to be upgraded from AIX Version 5.1 to AIX Version 5.2. The customer wants to retain /etc/passwd. Which of the following installation types should be used?()A、Preservation InstallB、Retention InstallC、Overwrite InstallD、Migration Install
单选题Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()AVerify the ISV application runs on AIX 5.2BPower4 to POWER5 upgrades are not supported without a application recompileCCheck the placement and size of the boot logical volume and disk space requirements on the S85DAIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked
单选题A customer has a new p5-550 running AIX 5.2 that is SAN-attached to a FAStT900. They have encountered hangs lasting over a minute on their new system during application load testing. They called the pSeries technical specialist for advice. Which of the following would be the most appropriate questions to determine their next step in resolving the problem?()AAre there any errors in the error log? Do they indicate any hardware or software errors?BHas performance data been collected? What do the results show in terms of I/O statistics?CHas performance data been collected? What do the results show in terms of CPU utilization? DWhat type of SAN switch is the customer using? What are the microcode levels on the switch?
单选题Companycom has a p690 and currently has eight LPARs. They have purchased a p5 590 and wish to migrate their eight LPARs to the new server. The LPARs are running either AIX 5.2 or AIX 5.3 with the current maintenance. What is the LEAST disruptive method for this activity?()ANew install of AIXBMigrate the 7040-61DCUtilize alt_disk_installDUse the enterprise back up strategy
单选题A customer wishes to replace 12 older small UNIX systems. They are running out of floor space in their data center and any solution must take this into consideration. Assuming that the applications are supported on all AIX versions, which of the following would best meet the customer’s requirements?()AA p650 running AIX v5.3BA p5-550 running AIX v5.3CA p5-570 running Advanced POWER VirtualizationDMultiple rack-mounted p615s running dynamic LPAR
单选题A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future. Which pSeries system would be positioned best to meet this customer’s requirements?()Ap5-550 with the Advanced POWER Virtualization feature and AIX 5.2Bp5-550 with the POWER5 processor technology and AIX 5.2Cp5-570 with the Advanced POWER Virtualization feature and AIX 5.3Dp5-570 with the POWER5 processor technology and AIX 5.2
单选题A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()AA minimum of two HBAs; the customer will need to download SDDBA minimum of four HBAs; the customer will need to download SDDCA minimum of two HBAs; the customer will need to configure MPIODA minimum of four HBAs; the customer will need to configure MPIO
单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()AExplain to the customer that they need an additional HMC for the POWER5 system.BObtain a PO from the customer to purchase additional serial connections to the HMC.CObtain a PO from the customer to purchase additional Ethernet connections to the HMC.DExplain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
单选题Companycom has a system running AIX 5.2 and wants to upgrade to AIX 5.3. What method would provide the quickest recovery if the upgrade failed?()AUse alt_disk_installBBackup image to NIM serverCBackup using mksysb to DVD-RAMDApply the upgrade and do not commit
单选题A customer has requested a proposal for a p5-520 with AIX 5.2 and Sysback. There are no plans to run LPARs or Micro-Partitions on the p5-520 in the near future. The customer has asked the pSeries technical specialist to recommend anything else that may be needed. Which of the following should be recommended in this situation?()AHMCBDVD-ROMCTape driveDNetwork switch
单选题A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications. Each partition requires two of the following: OS boot drives, fiber adapters, and gigabit Ethernet adapters. The customer has an HMC with an available serial port. In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()AOne 7311-D20 drawerBTwo 7311-D20 drawersCTwo 7311-D10 drawersDOne 7311-D10 drawers
单选题The pSeries sales representative has done an excellent job in educating the customer on the benefits of working with IBM. The customer is planning to implement their first ERP application. This new application will be critical to running their business. The customer has only a competitor’s UNIX systemcurrently installed. They are interested in obtaining a proposal from IBM. In addition to the AIX hardware and HACMP software, what else should be included in the IBM proposal for the new ERP solution?()AI/T services and education to help with the implementation of the hardware and softwareBA Supportline specialist to work directly with the customer to manage any issues that ariseCThe services required to move the currently installed applications from the competitor’s systems to the IBM systemsDA slimmed down solution to ensure that the IBM solution is less expensive than the competitor’s solution
单选题A financial industry customer will consolidate their Intel-based servers to a p5-550 running AIX, and needs experienced technical services. What information should the account executive provide to the customer to assure them that the technical specialist has the required experience?()AThe technical specialist has supported multiple Cluster 1350 environments. References will be provided.BThe technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.CThe technical specialist has worked on multiple UNIX consolidation projects. References will be provided.DThe technical specialist has worked on Linux consolidation efforts. References will be provided.