单选题A financial industry customer will consolidate their Intel-based servers to a p5-550 running AIX, and needs experienced technical services.  What information should the account executive provide to the customer to assure them that the technical specialist has the required experience?()AThe technical specialist has supported multiple Cluster 1350 environments. References will be provided.BThe technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.CThe technical specialist has worked on multiple UNIX consolidation projects.  References will be provided.DThe technical specialist has worked on Linux consolidation efforts.  References will be provided.

单选题
A financial industry customer will consolidate their Intel-based servers to a p5-550 running AIX, and needs experienced technical services.  What information should the account executive provide to the customer to assure them that the technical specialist has the required experience?()
A

The technical specialist has supported multiple Cluster 1350 environments. References will be provided.

B

The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.

C

The technical specialist has worked on multiple UNIX consolidation projects.  References will be provided.

D

The technical specialist has worked on Linux consolidation efforts.  References will be provided.


参考解析

解析: 暂无解析

相关考题:

In a contract, the point of total assumption refers to the point where:A . The customer incurs the total financial responsibility for each additional dollar spent.B . The contractor incurs the total financial responsiblity for each dollar spent.C . The schedule and cost variance are zero.D . The customer will incur no further costs for the work the contractor performs in the completion of the contract.E . B and D only.

73 In a contract, the point of total assumption refers to the point where:A. The customer incurs the total financial responsibility for each additional dollar spent.B. The contractor incurs the total financial responsiblity for each dollar spent.C. The schedule and cost variance are zero.D. The customer will incur no further costs for the work the contractor performs in the completion of the contract.E. B and D only

His method supports Mr Shiller's findings and has ________efforts to predict prices in the financial industry. A influenced ;B influentially ;C influence

A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700.How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()A. 8 drive sets of 300 GB drivesB. 4 drive sets of 300 GB drivesC. 14 drive sets of 146 GB drivesD. 18 drive sets of 146 GB drives

Your customer wants to build a network for a financial trading floor that has a requirement for multiple high-value transactions, which are also vital to the customer. What are the two most critical requirements? ()(Choose two.)A. no single point of failureB. trading database server locationC. redundant application servers locationD. deterministic response to all failuresE. determine which protocol to use

What are three project goals of a Technical Decision Maker? ()A、 ensuring network integrityB、 controlling financial factorsC、 finding a solution that simplifies setup and operationD、 understanding customer needsE、 saving budget for future quartersF、 providing offeringsthat are modular and can be built opon

A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700. How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()A、8 drive sets of 300 GB drivesB、4 drive sets of 300 GB drivesC、14 drive sets of 146 GB drivesD、18 drive sets of 146 GB drives

What best explains why the banking industry is ready to take advantage of an integrated network infrastructure?()A、 Many banks are still connecting via dial-up.B、 Many banks need to consolidate departments and resources.C、 Many banks find themselves with an obsolete branch infrastructure.D、 Many banks need back-office process streamlining.

Which prepare phase service component involves providing a customer with a financial justification for adopting a technology? Select exactly 1 answer(s) from the following:()。A、Technology Strategy DevelopmentB、High-Level Design DevelopmentC、Business Case DevelopmentD、Proof of Concept

An existing IBM customer has some iSeries servers in their environment.  The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications.  The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms.  Which of the following will accomplish this?()A、Share the data over the Ethernet LAN.B、Install the IXA Adapter in the iSeries server.C、Install the IXA Adapter in the xSeries server.D、Attach both servers to an IXS switch.

A financial industry customer will consolidate their Intel-based servers to a p5-550 running AIX, and needs experienced technical services.  What information should the account executive provide to the customer to assure them that the technical specialist has the required experience?()A、The technical specialist has supported multiple Cluster 1350 environments. References will be provided.B、The technical specialist is Linux-certified by two industry groups. Certificate copies will be provided.C、The technical specialist has worked on multiple UNIX consolidation projects.  References will be provided.D、The technical specialist has worked on Linux consolidation efforts.  References will be provided.

A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()A、A DCE domainB、A Kerberos domainC、A PPP tunnel between the serversD、An IPSEC tunnel between the servers

You are speaking to an IT manager with 350 small servers. The IT manager is looking to reduce and consolidate systems.  What strategy would you follow?()A、Tell the customer that IBM has the best scale-out server strategy.B、Show the benefit of server consolidation with IBM and the return on investment.C、Find out the mixture of server processor and application type.D、Tell the customer to buy smaller servers.

A customer plans to consolidate multiple business unit applications on a single Power Systems server. The maximum number of cores which can be used by each business unit must be limited by creating shared processor pools. What is the minimum PowerVM Edition which provides this feature?()A、BasicB、ExpressC、StandardD、Enterprise

Which of the following environments is most closely addressed by the N series N3600?()A、a customer that requires block level storage B、a customer that requires CIFS and AIX NFS environments C、a customer that requires good scalability and performance D、a customer that needs to consolidate multiple storage controllers under a single interface

Which of the following customer environments is addressed by IBM System Storage N series gateways?()A、 a customer with CIFS, NFS and GPFS requirements B、 a customer wanting to natively implement Easy Tier C、 a customer who has large block sequential write requirements D、 a customer who needs to consolidate multiple storage controllers under one managementinterface

A customer would like to consolidate multiple database workloads to a single server to reduce TCO. What is the effect of PowerVM on TCO?()A、Reduces SAN costB、Reduces network costC、Reduces administration costsD、Reduces software licensing cost

An installed customer has developed human resource constraints in the IT department. Which of the following allows the sales professional to proceed with future sales?()A、Proof of conceptB、Volume sales discountsC、ServicePacsD、Industry leading technology

单选题What best explains why the banking industry is ready to take advantage of an integrated network infrastructure?()A Many banks are still connecting via dial-up.B Many banks need to consolidate departments and resources.C Many banks find themselves with an obsolete branch infrastructure.D Many banks need back-office process streamlining.

多选题What are three project goals of a Technical Decision Maker? ()Aensuring network integrityBcontrolling financial factorsCfinding a solution that simplifies setup and operationDunderstanding customer needsEsaving budget for future quartersFproviding offeringsthat are modular and can be built opon

单选题Which of the following environments is most closely addressed by the N series N3600?()Aa customer that requires block level storage Ba customer that requires CIFS and AIX NFS environments Ca customer that requires good scalability and performance Da customer that needs to consolidate multiple storage controllers under a single interface

单选题A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()AA DCE domainBA Kerberos domainCA PPP tunnel between the serversDAn IPSEC tunnel between the servers

单选题Which of the following customer environments is addressed by IBM System Storage N series gateways?()A a customer with CIFS, NFS and GPFS requirements B a customer wanting to natively implement Easy Tier C a customer who has large block sequential write requirements D a customer who needs to consolidate multiple storage controllers under one managementinterface

单选题A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server.  What is the minimum PowerVM edition that supports the customer requirement?()A PowerVM Lx86B PowerVM Express EditionC PowerVM Standard EditionD PowerVM Enterprise Edition

多选题Your customer wants to build a network for a financial trading floor that has a requirement formultiple high-value transactions, which are also vital to the customer. What are the two mostcritical requirements?() (Choose two.)Ano single point of failureBtrading database server locationCredundant application servers locationDdeterministic response to all failuresEdetermine which protocol to use

单选题A customer is running Microsoft Windows 2003, Sun Solaris, and IBM AIX with a total capacity of20 TB. This customer needs high availability for e-business applications. The servers are currently connected to two EMC Symmetrix subsystems that are running RAID 1. The customer wants to consolidate all storage into an IBM System Storage DS8700. How many Fibre Channel drive sets are needed to satisfy the total capacity for this customer?()A8 drive sets of 300 GB drivesB4 drive sets of 300 GB drivesC14 drive sets of 146 GB drivesD18 drive sets of 146 GB drives

单选题Factors leading to the crisis included poor regulation, mismanagement and deception in the industry, and competition from other types of financial firms.AcheatingBpollutionCabuseDdepression