单选题A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()AA minimum of two HBAs; the customer will need to download SDDBA minimum of four HBAs; the customer will need to download SDDCA minimum of two HBAs; the customer will need to configure MPIODA minimum of four HBAs; the customer will need to configure MPIO
单选题
A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()
A
A minimum of two HBAs; the customer will need to download SDD
B
A minimum of four HBAs; the customer will need to download SDD
C
A minimum of two HBAs; the customer will need to configure MPIO
D
A minimum of four HBAs; the customer will need to configure MPIO
参考解析
解析:
暂无解析
相关考题:
Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs. What is the best hardware to propose to keep the software cost low?()A、A 24 way p5 595 with 3 LPARsB、A 24 way p5 595 with 2 LPARsC、One p5 570s 16 way and one p5 570 8 wayD、One p5 595 12 way active and 12 way inactive, and one p5 570 8 way
An existing IBM customer has some iSeries servers in their environment. The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications. The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms. Which of the following will accomplish this?()A、Share the data over the Ethernet LAN.B、Install the IXA Adapter in the iSeries server.C、Install the IXA Adapter in the xSeries server.D、Attach both servers to an IXS switch.
Companycom has just added some new disk drives to a p5 590. The customer needs to know the largest Logical Track Group that these drives will support. What is the best way to locate this information?()A、Use lquerypv to read the driveB、Use lspv and look at PP Size valueC、Look on the outside of the drive itselfD、Use bootinfo to find the LTG on the drive
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications. The pSeries technical specialist should recommend purchasing which of the following?()A、p5 hardware, AIX 5.2, Virtual I/O ServerB、POWER4 hardware, AIX 5.3, Virtual I/O Server,C、p5 hardware, AIX 5.3, Advanced POWER Virtualization featureD、POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature
Machine policy templates can be assigned based on certain attributes of a machine. A customer organizes their machines based on the following requirements: The machines are all placed in specific Organizational Units in the Active Directory. The customer has Citrix Servers, and they have a specific naming convention meant only for their Citrix Servers. The customer has DHCP enabled for all the client machines. The customer has made it clear that they should not need to change anything in the existing infrastructure. Given these requirements, which single assignment attribute would be chosen for assigning machine policy templates?()A、HostnamesB、IP AddressesC、Machine Group TagD、Active Directory Groups
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A、Free up one HMC and update the software for use with the p5 570B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
A customer needs detailed information on the internal architecture of the new p5-570. Which of the following is the most appropriate place to get this documentation?()A、IBM sales manualB、IBM Redbooks WebsiteC、IBM eServer p5 and pSeries Qs and AsD、IBM eServer p5 and pSeries Facts and Features
The account executive is asking about post-sales support for a new p5 HMC. They need the pSeries technical specialist to configure an HMC with software support for the customer. Which of the following should the specialist include in the configuration?()A、SupportlineB、ServiceSuiteC、Software Maintenance Agreement (SWMA)D、Machine Control Program Remote Support Agreement (MCPRSA)
A customer wants to purchase an IBM System Storage DS8700 to support a high-performance database environment. Which technical solution gives the customer the best relationship between I/O performance at the machine’s backend vs. capacity installed in the machine()A、additional installation of the first and second expansion frame will increase the backend performance capabilityB、the usage of 300 GB/15k FC disks will give the server a high-performance backend capabilityC、performance Accelerator restricts the number of disks connected to one device adapter pair to 32 disksD、the second RIO-G loop between the base frame and the first expansion increases the backend performance
Companycom purchased a p5 570 with no plans to partition. The customer plans to use the ASMI interface to power on and off the machine. How can ASMI be accessed without a HMC?()A、By typing diags and then going to the ASMI menusB、Through SSH from a TCP/IP connection on the serverC、Through WebSM which is connected to a system Ethernet portD、By connecting through a web browser to an HMC Ethernet port
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing. This system does not require an HMC.
A customer is installing a new xSeries server into a Token-Ring environment. Where would the customer find the latest supported Token-Ring PCI adaptors for that server?()A、IBM ServerProven hardware websiteB、IEEE Proven websiteC、IBM PartnerWorld websiteD、3Com Support website
A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()A、A minimum of two HBAs; the customer will need to download SDDB、A minimum of four HBAs; the customer will need to download SDDC、A minimum of two HBAs; the customer will need to configure MPIOD、A minimum of four HBAs; the customer will need to configure MPIO
The customer has an IBM Enterprise Storage Server 800 coming off lease this year. Themaintenance charges are becoming very expensive and they are looking at a new storage solutionto attach to their mainframe environment. Which of the following solutions would be most costeffective?()A、DS8300B、DS8700 C、Storwize V7000 D、XIV Storage System
How can an Oracle WebLogic cluster’s capacity be increased ?()A、 by adding server instances to the cluster on an existing machineB、 by adding machines to host server for more clustered instancesC、 by adding machines to the cluster to host the incremental server instancesD、 by adding node managers to an existing machine
You are planning an upgrade strategy for a Windows Azure application. You need to identify changes that will require application downtime. Which change will always require downtime?()A、 Changing the virtual machine sizeB、 Adding an HTTPS endpoint to a web roleC、 Changing the value of a configuration settingD、 Upgrading the hosted service by deploying a new package
During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()A、The IBM CE will install the cardB、The card will not be supported by IBMC、The AIX device driver should work fineD、The customer is correct, there should be no problem
单选题During the Solution Assurance for a p5 590, Companycom states there is a plan to install OEM Emulex cards in the p5 590. The customer assumes there will be no problem with the plan since IBM resells the Emulex cards. What is the correct response for the customer?()AThe IBM CE will install the cardBThe card will not be supported by IBMCThe AIX device driver should work fineDThe customer is correct, there should be no problem
单选题Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server. What is the smallest p5 570 that should be sold to this customer?()A4 processors 8GB of memoryB5 processors 8GB of memoryC4 processors 10GB of memoryD5 processors 10GB of memory
多选题Which two statements are true about the WebLogic Cluster ?()AClustered Servers capacity can be increased by adding new server instance to the cluster on an existing machineBClustered Servers can be on a same or different machine with same operating system onlyCClustered Servers can only be on a same machine or different operating systemDClustered Servers can be on a same or different machine with same or different operating system
单选题The account executive is asking about post-sales support for a new p5 HMC. They need the pSeries technical specialist to configure an HMC with software support for the customer. Which of the following should the specialist include in the configuration?()ASupportlineBServiceSuiteCSoftware Maintenance Agreement (SWMA)DMachine Control Program Remote Support Agreement (MCPRSA)
单选题A customer is installing a new xSeries server into a Token-Ring environment. Where would the customer find the latest supported Token-Ring PCI adaptors for that server?()AIBM ServerProven hardware websiteBIEEE Proven websiteCIBM PartnerWorld websiteD3Com Support website
单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()AExplain to the customer that they need an additional HMC for the POWER5 system.BObtain a PO from the customer to purchase additional serial connections to the HMC.CObtain a PO from the customer to purchase additional Ethernet connections to the HMC.DExplain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
单选题Companycom purchased a p5 570 with no plans to partition. The customer plans to use the ASMI interface to power on and off the machine. How can ASMI be accessed without a HMC?()ABy typing diags and then going to the ASMI menusBThrough SSH from a TCP/IP connection on the serverCThrough WebSM which is connected to a system Ethernet portDBy connecting through a web browser to an HMC Ethernet port
多选题How can an Oracle WebLogic cluster’s capacity be increased ?()Aby adding server instances to the cluster on an existing machineBby adding machines to host server for more clustered instancesCby adding machines to the cluster to host the incremental server instancesDby adding node managers to an existing machine
单选题You are planning an upgrade strategy for a Windows Azure application. You need to identify changes that will require application downtime. Which change will always require downtime?()A Changing the virtual machine sizeB Adding an HTTPS endpoint to a web roleC Changing the value of a configuration settingD Upgrading the hosted service by deploying a new package
单选题Companycom purchased a new p5 570 without a HMC. The customer does not know how to power the full frame/system off since there does not appear to be an on/off button. What can be done to accomplish this task?()ATelnet into the machine and do a shutdown -FrBLog into ASMI as Administrator and use ASMI menusCLog into the service processor using WebSM and use ASMI menusDUse the off button which is located to the left below the LEDs