The strategies for handling risk comprise of two main types: negative risks,and positive risks. The goal of the plan is to minimize threats and maximize opportunities. When dealing with negative risks, there are three main response strategies – ( ) , Transfer, Mitigate. A.Challenge B.Exploit C.AvoiD. D.Enhance
The strategies for handling risk comprise of two main types: negative risks,and positive risks. The goal of the plan is to minimize threats and maximize opportunities. When dealing with negative risks, there are three main response strategies – ( ) , Transfer, Mitigate.
A.Challenge
B.Exploit
C.AvoiD.
D.Enhance
B.Exploit
C.AvoiD.
D.Enhance
参考解析
解析:风险应对策略包括两种类型:负面风险的应对策略和正向风险的应对策略。风险应对计划的目标是最小化威胁,并且最大化机会。处理负面风险有三种典型的战略:回避、转移和减轻。A.挑战 B.Exploit C.避免 D.提高
相关考题:
Risk mitigation includes all but which of the following:A Developing system (policies, procedures, responsibilities)B Obtaining insurance against lossC performing contingent planningD developing planning alternativesE identification of project risks.
Risk can be divided into two basic types; business risk and pure (or insurable risk). Of the following, which one(s) fall(s) under business risk?A liability lossB direct property lossC profit lossD personnel-related lossE B and C
There are strategies typically deal with threats or risk that may have negative impacts on project objectives if they occur, some other strategies are suggested to deal with risks with potentially positive impacts. ()is a risk response strategy that may be adopted for either threats or opportunities.A.shareB.MitigateC.TransferD.Acceptance
●(71)assesses the priority of identified risks using their probability of occurring, the corresponding impact on project objectives if the risks do occur, as well as other factors such as the time frame. and risk tolerance of the project constraints of cost, schedule, scope, and quality.(71)A. Quantitative Risk AnalysisB. Qualitative Risk AnalysisC. Enterprise Environmental FactorsD. Risk Management Plan
2 The risk committee at Southern Continents Company (SCC) met to discuss a report by its risk manager, StephanieField. The report focused on a number of risks that applied to a chemicals factory recently acquired by SCC in anothercountry, Southland. She explained that the new risks related to the security of the factory in Southland in respect ofburglary, to the supply of one of the key raw materials that experienced fluctuations in world supply and also anenvironmental risk. The environmental risk, Stephanie explained, was to do with the possibility of poisonousemissions from the Southland factory.The SCC chief executive, Choo Wang, who chaired the risk committee, said that the Southland factory was importantto him for two reasons. First, he said it was strategically important to the company. Second, it was important becausehis own bonuses depended upon it. He said that because he had personally negotiated the purchase of the Southlandfactory, the remunerations committee had included a performance bonus on his salary based on the success of theSouthland investment. He told Stephanie that a performance-related bonus was payable when and if the factoryachieved a certain level of output that Choo considered to be ambitious. ‘I don’t get any bonus at all until we reacha high level of output from the factory,’ he said. ‘So I don’t care what the risks are, we will have to manage them.’Stephanie explained that one of her main concerns arose because the employees at the factory in Southland were notaware of the importance of risk management to SCC. She said that the former owner of the factory paid less attentionto risk issues and so the staff were not as aware of risk as Stephanie would like them to be. ‘I would like to get riskawareness embedded in the culture at the Southland factory,’ she said.Choo Wang said that he knew from Stephanie’s report what the risks were, but that he wanted somebody to explainto him what strategies SCC could use to manage the risks.Required:(a) Describe four strategies that can be used to manage risk and identify, with reasons, an appropriate strategyfor each of the three risks mentioned in the case. (12 marks)
● There are strategies typically deal with threats or risks that may have negative impacts on project objectives if they occur. Some other strategies are suggested to deal with risks with potentially positive impacts. (74) is a risk response strategy that may be adopted for either threats or opportunities.(74) A. ShareB. MitigateC. TransferD. Acceptance
______assesses the priority of identified ri sks using their probability of occurring,the corresponding impact on project objectives if the risks do occur,as well as other factors such as the time frame. and risk tolerance of the project constraints of cost,schedule,scope,and quality.A.Quantitative Risk AnalysisB.Qualitative Risk AnalysisC.Enterprise Environmental FactorsD.Risk Management Plan
The()process analyzes the effect of risk events and assigns a numerical rating to those risks.()A.Risk Identification B.Quantitative Risk AnalysisC.Qualitative Risk Analysis D.Risk Monitoring and Control
● Project()is an uncertain event or condition that ,if it occurs ,has a positive or a negative effect on at least one project objective ,such as time ,cost ,scope or quality()A. risk B. problem C. result D. data
听力原文:M: Can you give an example of types of risks Banks face?W: Yes. The major type of risks is called credit risk. It means a counterpart fails to perform. according to a contractual arrangement.Q: What are they talking about?(13)A.A contractual arrangement.B.A counterpart.C.Many types of risks.D.Credit risk.
Setting redundant components in subsystem to handle with the risks brought by the defaults of original components, what kind of risk response strategy is this ? ( 75 ).A.Risk avoidanceB.Risk acceptanceC.Risk mitigationD.Contingency plan
setting redundant components in subsystem to handle with the risks brought by the defaultsof original components,what kind of risk response strategy is this?()A.risk avoidanceB.risk acceptanceC.risk mitigationD.contingency plan
()is the process of implementing risk response plans,tracking identified risks,monitoring residual risk,identifying new risk,and evaluating risk process effectiveness throughout the project.A.Identity risksB.Control risksC.Plan risk responsesD.Plan risk management
The______process ascertains which risks have the potential Of affecting the proect and documenting the risks' characteristics.A.Risk IdentificationB.Quantitative Risk AnalysisC.Qualitative Risk AnalysisD.Risk Monitoring and Control
()is the process of identifying individual project risks as well as source of overall project risk,and documenting their characteristics.A.identify risksB.monitor risksC.implement risks responsesD.plan risk management
Psychology tells us that many people hate to take risks. But it is good for us to take risks, especially when the risk is to achieve a desired result. In that way, we become stronger and braver.Our human nature should be to take risks, but some people just sit and wish they didn't have the fear to move on. This is because they failed a few times in their lives. Please step out and don't let the past hold you back from living life to the fullest. Move forward and move on! In studying the psychology of taking risks, we find that human provides us with the desire to experiment and take chances.Risk taking is a great advantage that allowed our ancestors to become stronger and stronger day by day. By taking risks they fought off enemies and discovered new territories. This attitude has become a part of our modem culture. Riding a roller caster is a common risk taking activity. Even each person seems to enjoy the risk although they have the understanding that it is dangerous. This psychological and biological connection creates an interesting connection between what is unsafe and what humans enjoy.Getting in a car each day is a risk. Getting out of bed is a risk, too. We need to take risks so that we can complete many things. Astronauts take risks when they get inside a rocket; however,the things they achieve are great. Businessmen take a risk when they buy parts of a company, however, without doing that, they could not make more money.We need to take risks so that we can gain something. It is impossible to move forward in life, earn money, enjoy a relationship, play a sport, or doing anything else without taking a risk. It is all part of the game. It' s one of the most important parts of life.What would be the title for the passage?A.Taking Risks Is Easier Said than DoneB.Risks Taken by AncestorsC.Live Our Life to the FullestD.No Risk, No Gain
Psychology tells us that many people hate to take risks. But it is good for us to take risks, especially when the risk is to achieve a desired result. In that way, we become stronger and braver.Our human nature should be to take risks, but some people just sit and wish they didn't have the fear to move on. This is because they failed a few times in their lives. Please step out and don't let the past hold you back from living life to the fullest. Move forward and move on! In studying the psychology of taking risks, we find that human provides us with the desire to experiment and take chances.Risk taking is a great advantage that allowed our ancestors to become stronger and stronger day by day. By taking risks they fought off enemies and discovered new territories. This attitude has become a part of our modem culture. Riding a roller caster is a common risk taking activity. Even each person seems to enjoy the risk although they have the understanding that it is dangerous. This psychological and biological connection creates an interesting connection between what is unsafe and what humans enjoy.Getting in a car each day is a risk. Getting out of bed is a risk, too. We need to take risks so that we can complete many things. Astronauts take risks when they get inside a rocket; however,the things they achieve are great. Businessmen take a risk when they buy parts of a company, however, without doing that, they could not make more money.We need to take risks so that we can gain something. It is impossible to move forward in life, earn money, enjoy a relationship, play a sport, or doing anything else without taking a risk. It is all part of the game. It' s one of the most important parts of life.What can we infer from the passage?A.Daily life is full of risks.B.The safest place has the greatest risk.C.People should take risks when they are young.D.We can always achieve our goals by taking risks.
setting redundant components in subsystem to handle with the risks brought by the defaults of original components,what kind of risk response strategy is this? ( ) . A.risk avoidance B.risk acceptance C.risk mitigation D.contingency plan
setting redundant components in subsystem to handle with the risks brought by the defaults of original components,what kind of risk response strategy is this?()A、risk avoidanceB、risk acceptanceC、risk mitigationD、contingency plan
()assesses the priority of identified risks using their probability of occurring, the corresponding impact on project objectives if the risks do occur, as well as other factors such as the time frame and risk tolerance of the project constraints of cost, schedule, scope, and quality.A、Quantitative Risk AnalysisB、Qualitative Risk AnalysisC、Enterprise Environmental FactorsD、Risk Management Plan
The carrier has to take care of the risk of freight payments by the individual shippers when handling LCL shipments.
The general additional risks including()are covered in all risks coverage.A、risk of shortageB、risk of leakageC、strikes riskD、risk of rust
单选题The center of buoyancy and the metacenter are in the line of action of the buoyant force().Aonly when there is positive stabilityBonly when there is negative stabilityConly when there is neutral stabilityDat all times
单选题The strategies for handling risk comprise of two main types: negative risks, and positive risks. The goal ofthe plan is to minimize threats and maximize opportunities. When dealing with negative risks, there are three main response strategies(),rransfer ,Mitigate.AChallengeBExploitCAvoidDEnhance
单选题For a floating vessel, the center of buoyancy and the metacenter are in the line of action of the buoyant force().Aonly when there is positive stabilityBonly when there is negative stabilityConly when there is neutral stabilityDat all times
单选题When operating with a negative suction head, which of the following types of pumps will require priming?()AReciprocatingBCentrifugalCRotaryDGear
单选题()assesses the priority of identified risks using their probability of occurring, the corresponding impact on project objectives if the risks do occur, as well as other factors such as the time frame and risk tolerance of the project constraints of cost, schedule, scope, and quality.AQuantitative Risk AnalysisBQualitative Risk AnalysisCEnterprise Environmental FactorsDRisk Management Plan