At the foot of the mountain__________A.a village lieB.lies a villageC.does a village lieD.lying a village
At the foot of the mountain__________
A.a village lie
B.lies a village
C.does a village lie
D.lying a village
B.lies a village
C.does a village lie
D.lying a village
参考解析
解析:考情点拨:本题考查倒装句型。应试指导:句意:在山脚下,坐落着一个村庄。当表示方位的状语放在句首时,要用完全倒装。完全倒装是只将句子中的谓语动词全部置于主语之前。此结构通常用于一般现在时和一般过去时。
相关考题:
_____ from the top of the tower ,the south foot of the mountain is a sea of trees . ( )A.SeenB.SeeingC.Have seenD. To see
You can’t imagine how my sister finished the relay race ________ her left foot wounded so much.A、thatB、forC、withD、while
The car () at the present speed until it reaches the foot of the mountain at about ten o’clock tonight. A、would goB、wentC、will be goingD、goes
There was a house at ______A、the mountain footB、the foot of the mountainC、the feet of the mountainD、the mountain's foot
I'm terribly sorry for being late. I was caught in________. A.a traffic jamB.a foot bridgeC.a field tripD.a Buddhist temple
Given the same water depth and line tension, the holding power of a 19 pound / foot wire rope mooring system in comparison to the holding power of a 90 pound / foot chain mooring system will be ______.A.weakerB.equalC.greaterD.Indeterminable
This area has been free from Foot - and - Mouth Disease ( ) two years.A. for B. inC. after D. before
单选题There was a house at()Athe mountain footBthe foot of the mountainCthe feet of the mountainDthe mountain's foot
单选题In preparing a cargo space for receipt of a shipment of bagged cargo,which instruction for laying dunnage should be followed? ()AUse either 1 or 2 tiers of dunnage,spacing the pieces in each tier a foot apart,and lay pieces in the bottom tier diagonally to the ship's sideBUse 1 tier of dunnage,laying the pieces tightly together to form a solid floor over the steel deckCUse 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier 6 inches apartDUse 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier together
单选题The Vessel Bridge-to-Bridge Radiotelephone Act applies to which towboat?()AA 100 GT towboat,24 feet in lengthBA 90-foot towboat tied to the pierCA 60-foot towboat towing by pushing aheadDA 400 GT towboat anchored
单选题Which statement concerning the carriage of containers is TRUE?().AThe Chief Mate and Master of a container ship should have the proposed stowage plan ready for the stevedore upon arrival in portBWhen stowed on deck of a break bulk ship,the bottom of the container must be evenly supported throughoutCWith tiered containers,a 40-foot container may be stowed on top of two 20-foot containersDDeck load calculations must take into account the square footage of the entire container bottom
单选题Which vessel in ocean service is not subject to Annex V of MARPOL 73/78? ()AA 20-foot sailing vesselBA 26-foot tug and towCAn uninspected 35-foot passenger vesselDA Navy Destroyer
单选题What is MTI?().AThe foot/tons needed to trim the vessel by 1 inchBThe foot/tons needed to trim the vessel by 1 footCThe moments needed to trim the vessel by 1 centimeterDThe amount of vessel will trim when loading 100 tons 100 feet from the tipping Center
名词解释题平过道 foot pass between platform