单选题The space in No.1 lower hold is nearly full up but there is still some()side.AcabinBcabinsCroomDrooms
单选题
The space in No.1 lower hold is nearly full up but there is still some()side.
A
cabin
B
cabins
C
room
D
rooms
参考解析
解析:
暂无解析
相关考题:
We ____________ the belief that we will have a promising future as long as we work hard. (A) hold up(B) hold to(C) hold down(D) hold off
Hold No. 4 must be cleaned up to meet the ________ of the cargo surveyorsA.rulesB.necessityC.requirementD.statute
The better we understand ourselves, the easier it becomes to ________ our full potential.A live up toB reach up toC come up toD make up to
This book discusses the most recent events of space travel, it certainly is ____.A:up to nowB:up to this momentC:up to this pointD:up to date
---- Sorry, I have to ______ now. It’s time for class.---- OK, I’ll call back later.A. hang up B. break up C. give up D. hold up
Sweat damage will occur in a cargo hold containing machinery parts when ______.A.the outside air is colder than the cargo.B.the air temperature of the hold is higher than the outside air temperature.C.the dew point of the hold is higher than the temperature of the cargo.D.the dew point of the outside air is lower than the temperature of the cargo
Should the steel be loaded in conditions where the ambient temperature is lower than might be encountered later on in the voyage,______.A.the hold should be ventilatedB.the hold should not be ventilatedC.the hold should be half-ventilatedD.hot air should be introduced into the hold
材料:Early on 5 November 1996,the 140,086 tonnes deadweight Malaysian flag bulk carrier Giga 2 was nearing completion of discharge of a cargo of iron ore at No.2 discharge berth,Port KemblA、Due to the vessels light condition,the unloader could not be positioned over No.1 hold,to remove the 1080 tonnes of cargo remaining in that particular hold.At the suggestion of the shift supervisor,ballast was pumped into No.4 hold,which was permissible under the vessels operations manual.Pumping of ballast into No.4 hold commenced at 0530.After the lunch break,two terminal workers descended into No.5 hold,where the unloader was working,to clear iron ore from around the bottom of the forward spiral access ladder.The spiral ladder terminated at the top of the lower stool,six metres above the tank top.They had just completed this task and were about to climb the ladder when the bulkhead to the starboard side of the centre line,between No.5 hold and the ballasted No.4 hold,collapsed.Both workers were immediately engulfed by the deluge and,although one was able to haul himself clear,the other remained submerged.The shift supervisor was working in his office ashore and,alerted by calls over the radio from the Hatchman,dashed on board and immediately descended the ladder into No.5 hold.Up to his neck in the swirling water and guided by the Hatchman above,he was able to grab hold of the submerged worker.Assisted by another terminal worker,who had followed him into the hold,he was able to haul the unconscious and apparently lifeless worker clear of the water.The shift supervisor then administered cardio-pulmonary resuscitation(CPR),which was successful in restoring breathing in the worker.Very shortly afterwards an ambulance officer arrived on the scene and administered oxygen,before the worker was lifted from the hold and taken to hospital.问题:The most probable reason that the unloader could not be positioned over No.1 hold was that ________.A.the trim was too smallB.the trim was too bigC.the draft was too smallD.the draft was too bigNo.4 hold into which ballast water was pumped was a ________.A.special hold which could only be used to adjust the trim and/or draft in cargo operationB.double bottom tank usually not used as ballast tankC.ballast tankD.cargo holdIt is concluded that the depth of ballast water in No.4 Hold ________ before the bulkhead was collapsed.A.less than 1 meterB.around 1 meterC.around 2 metersD.more than 3 metersOf the following,it is ________ that prevented the submerged worker from hauling himself clear when the bulkhead collapsed.A.his weakness or,possibly,his small figureB.the big depth of the ballast waterC.the big distance from the lower stool of the spiral ladder to the tank-top in No.5 HoldD.the strong or swirling current in the ballast water请帮忙给出每个问题的正确答案和分析,谢谢!
If you grasp this rope,I will pull you up.A:understood B:had a hold overC:took hold of D:left hold of
以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4) No.1 hold bilge, lay wood block; 5) No.1 hold bilge ,lay wood block on tungsten iron and pave canvas on wood block; 6)No.4 hold tweendeck,using rope net separate commodity from stationary.A、1)严格按配载计划要求执行;2)申请理货;B、3)吊杆安全负荷量3t;4)No.1舱底舱铺木板;C、5)No.2舱底舱钨铁上铺木板,上面再铺帆布;6)No.4舱二层舱日用品和文具间用绳网隔票。D、以上都对
In Hatch No.3 lower hold there are a lot of materials for dunnaging,()paper,nets,planks and tapes.A、asB、likeC、such asD、such that
() are activities that manage the space needed to hold the inventories.A、StackingB、Warehousing and storageC、DispatchingD、Goods delivering
The operating system partition on a server is nearly out of space on a Windows 2003 Server. The administrator notices that the file pagefile.sys is taking up nearly 2GB of space. Which of the following would BEST resolve this problem?()A、Move the page file to a free drive.B、Delete the file.C、Add more memory.D、Remove the page file from system properties
A systems administrator has a high performance server with a file share full of data that has not been used in a long time, but is still important and might be used in the future. Which of the following should they do to reclaim the space off the high performance server?()A、Audit the dataB、Delete the dataC、Back up the dataD、Archive the data
You receive the following error: ORA-19804: cannot reclaim nnnnn bytes disk space from mmmmm limit Identify the reason for receiving the above error message?()A、 The sort area is very small.B、 There is no more space in the Undo tablespace.C、 The flash recovery area is full.D、 The online redo log file is full.
单选题The operating system partition on a server is nearly out of space on a Windows 2003 Server. The administrator notices that the file pagefile.sys is taking up nearly 2GB of space. Which of the following would BEST resolve this problem?()A Move the page file to a free drive.B Delete the file.C Add more memory.D Remove the page file from system properties.
单选题Sweat damage will occur in a cargo hold containing machinery parts when().Athe outside air is colder than the cargoBthe air temperature of the hold is higher than the outside air temperatureCthe dew point of the hold is higher than the temperature of the cargoDthe dew point of the outside air is lower than the temperature of the cargo
单选题Hatch No.1 must be cleaned up to meet the()of the cargo surveyors.AnecessityBresponsibilityCrequirementDstipulation
单选题The operating system partition on a server is nearly out of space on a Windows 2003 Server. The administrator notices that the file pagefile.sys is taking up nearly 2GB of space. Which of the following would BEST resolve this problem?()AMove the page file to a free drive.BDelete the file.CAdd more memory.DRemove the page file from system properties.
单选题How should you signal the crane operator to raise the boom and lower the load?().AExtend arm with the palm down and and hold this position rigidlyBPlace both fists in front of the body with the thumbs pointing outward each otherCClasp hands in front of you bodyDExtend arm with the thumb pointing up, and flex the finger s in and out for as long as the load movement is desired
单选题An independent bilge suction is required for ().Aballast tanksBsludge tanksCmachinery space bilgesDcargo hold bilges
单选题A cargo hold has been determined to have a relative humidity of 80% and a dry bulb temperature of 80 ℃ and a dry bulb temperature of 85℃.When the hold is sealed and the dry bulb temperature decreases, the relative humidity in the space will ()AdecreaseBincreaseCdecrease to zeroDremain unchanged
单选题67 A set up B stood up C paid back D hold backAABBCCDD