单选题The ()(重吊杆) can lift heavy cargo.Aheavy cargo derrickBheavy deckCjumbo boomDheavy block

单选题
The ()(重吊杆) can lift heavy cargo.
A

heavy cargo derrick

B

heavy deck

C

jumbo boom

D

heavy block


参考解析

解析: 暂无解析

相关考题:

This is the deck cargo. ________ stow it in the holdsA.NotB.Can’tC.Doesn’tD.Don’t

Proper lifting technique for heavy items is:() A. to use gloves to pick up the item.B. to squat and lift from the legs.C. to have two people bend down and pick the item up.D. to bend down and lift the item up.

The Charterers to have the right to __________ of all winches,derricks including heavy lift gear and/or cranes to their full capacity.A.Freely useB.Use freelyC.Free useD.Use free

heavy derrick()A、吊件货B、起重吊杆C、重吊杆D、重吊车

The jumbo boom can ().A、lift heavy cargoB、load and unloadC、join ropes togetherD、lift light cargo

The jumbo boom can lift heavy cargo, the gantry crane can hoist containers.()A、重吊杆吊重货和集装箱货。B、龙门吊能起吊重件货,重吊杆能起吊集装箱。C、重吊杆能起吊重件货,龙门吊能起吊集装箱。D、龙门吊吊重货和集装箱货。

This is deck cargo. ()stow it in the holds.A、NotB、NottoC、Don’tD、Can

重吊杆用于吊大的重件。()A、Heavy derrick is used for lifting large heavy cargo.B、Derrick is used for lifting large heavy cargo.C、Heavy derrick is used for lifting dry bulk cargo.D、Derrick is used for lifting dry bulk cargo.

The ()(重吊杆) can lift heavy cargo.A、heavy cargo derrickB、heavy deckC、jumbo boomD、heavy block

A ()can give power to hoist or lower cargo.A、cargo winchB、lift winchC、derrickD、crane

Which of the following safety procedures is the BEST when lifting heavy equipment onto a repairbench?()A、The technician should always bend at the waist and lift with their arms.B、The technician should seek assistance from an available customer.C、The technician should always bend at the waist and lift with their back.D、The technician should get assistance from another technician.

What is the disadvantage for air transportation? ()A、Quick but not safeB、Less frequencyC、It can’t lift heavy goodsD、The highest cost in all transport modes

()is the disadvantage for air transportation?A、Quick but not safeB、Less frequencyC、It can’t lift heavy goodsD、the highest cost in all transport modes

Proper lifting technique for heavy items is:()A、to use gloves to pick up the item.B、to squat and lift from the legs.C、to have two people bend down and pick the item up.D、to bend down and lift the item up.

单选题()is the disadvantage for air transportation?AQuick but not safeBLess frequencyCIt can’t lift heavy goodsDthe highest cost in all transport modes

单选题Proper lifting technique for heavy items is:()Ato use gloves to pick up the item.Bto squat and lift from the legs.Cto have two people bend down and pick the item up.Dto bend down and lift the item up.

单选题heavy derrick()A吊件货B起重吊杆C重吊杆D重吊车

单选题A carling is used aboard ship().Aas a connecting strap between the butted ends of platingBto stiffen areas under points of great stress between beamsCto prevent the anchor from fouling when the brake is releasedDto provide an extra heavy fitting in a heavy lift cargo rig

单选题The jumbo boom can lift heavy cargo, the gantry crane can hoist containers.()A重吊杆吊重货和集装箱货。B龙门吊能起吊重件货,重吊杆能起吊集装箱。C重吊杆能起吊重件货,龙门吊能起吊集装箱。D龙门吊吊重货和集装箱货。

单选题The ()(重吊杆) can lift heavy cargo.Aheavy cargo derrickBheavy deckCjumbo boomDheavy block

单选题The parts of the derrick are: derrick boom rest, gooseneck, center guy, stay, topping lift, topping lift block and so on.()A吊杆的部件有:吊杆支架、鹅颈头、中心稳索、支索、千斤索和千斤索滑车组等。B吊杆的部件有:鹅颈头、中心稳索、千斤索、侧稳索、千斤索滑车组和支索等。C吊杆的部件有:中心稳索、侧稳索、吊杆支架、鹅颈头、千斤索、和千斤索滑车组等。D吊杆的部件有:侧稳索、中心稳索、鹅颈头、吊杆支架、千斤索、和千斤索滑车组等。

单选题重吊杆用于吊大的重件。()AHeavy derrick is used for lifting large heavy cargo.BDerrick is used for lifting large heavy cargo.CHeavy derrick is used for lifting dry bulk cargo.DDerrick is used for lifting dry bulk cargo.

单选题下列不设稳索装置的吊杆是()。A双千斤索轻型单吊杆和普通重吊杆BV型重吊杆和单千斤索轻型单吊杆C普通重吊杆和V型重吊杆D双千斤索轻型单吊杆和V型重吊杆

单选题What is the disadvantage for air transportation? ()AQuick but not safeBLess frequencyCIt can’t lift heavy goodsDThe highest cost in all transport modes

单选题A ()(重吊杆)is used for lifting long heavy cargo.AderrickBcraneCjumbo boornDspecial crane

单选题Which statement is TRUE concerning the tandem working arrangement of pedestal cranes when completing a quad lift? ()AThe discharge is slow due to the size of the cargo and all the cranes working togetherBThe cargo discharge can be accomplished with controlled pendulationCThe cargo discharge can be performed in port or at anchorDThe cranes enable the handling of heavy cargos without shoreside assistance

单选题The man with()strength could lift a heavy rock without any difficulty.ApowerfulBstrongCintelligentDphenomenal

单选题A single heavy wire made up for the topping lift is called a().AbaleBspanner wireCbull lineDworking guy