单选题Deck cranes require() time to prepare for working cargo than derricks.AlessBmoreCmanyDmuch

单选题
Deck cranes require() time to prepare for working cargo than derricks.
A

less

B

more

C

many

D

much


参考解析

解析: 暂无解析

相关考题:

Edmond Moutran spends more time travelling by air than working at his office.() 此题为判断题(对,错)。

What would NOT require that a detailed report of the release of hazardous cargo be made to the Department of Transportation?A.The valve on an empty portable tank that contained acetone is accidently opened and some of the residue escapes to the open seaB.A carboy of nitric acid is broken on deck while loading and is flushed overboard with no injury or damageC.Part of your deck cargo of five gallon cans of paint is damaged and leaking so you jettison them to eliminate the fire hazardD.Heavy weather causes damage to packages of a hazardous liquid that is subsequently pumped out at sea through the bilge pumping system.

To "shore up" the main deck for the stowage of deck cargo means to ______.A.weld pad eyes on deck in proper position to secure the cargoB.strengthen the main deck by placing pillars underneath it in the tween-decksC.distribute the weight of the cargo by placing fore-and-aft planks on the main deckD.package the cargo in wooden crates so it will not damage the deck

When stowing hazardous materials on deck,lashing of such cargo is permitted if ______.A.A wooden bin is constructed of at least 2-inch dunnage and bolted togetherB.The cargo is lashed to the adjacent guard railsC.The lashings are secured to deck pad eyesD.There is at least 3 inches of dunnage on deck

______ is not a proper procedure for a lashing of the timber deck cargo.A.to be efficiently attached to the deck stringer plate or other strengthened pointsB.to pass over the timber deck cargoC.to be shackled to eye platesD.to be applied not contacting with the timber deck cargo

What is/are the advantage(s)of cranes over conventional cargo booms ________.A.Cranes are able to pick up and drop loads over a greater spotting areaB.Increased safety because the deck is clear of running and standing riggingC.Simplicity of operation of the crane by its operatorD.All of the above

It is possible,and sometimes necessary,to strengthen the deck of a vessel for carriage of deck cargo by ______.A.placing bunker on the deckB.building a stage on which to place the cargoC.welding steel feet to the deck,on which the cargo is placedD.erecting vertical pillars under the deck to support the cargo

Concentrated heavy loads are involved in loading a LASH vessel. What does NOT require close attention due to such loads while working cargo?______.A.GM – available and requiredB.Longitudinal stress numeralC.Tons per inch immersion numeralD.Draft

Some companies have introduced flexible working time with less emphasis on pressure ____A.than more on efficiencyB.and more on efficiencyC.and more efficiency D.than efficiency

The cargo gear includes().A、derrick, winches, cargo ropes and wiresB、derricks, windlass, capstanC、hatch covers, derricks, windlassD、cranes, hatches, lashing wires

When the charterer uses more time than time stipulated in a voyage C/P to load his cargo, the ship-owner is entitled to()A、overtimeB、dispatchC、demurrageD、deadfreight

单选题The advantage of container transportation is to().Aprovide the better working condition for stevedore and crewBtake the advantage of cargo handling and keep a good maintenance of the vesselCstandardize the size and package of the general cargoDreduce handling cost and damage of cargo and shorten the ship's turn round time in port

单选题It is possible,and sometimes necessary,to strengthen the deck of a vessel for carriage of deck cargo by().Aplacing bunker on the deckBbuilding a stage on which to place the cargoCwelding steel feet to the deck,on which the cargo is placedDerecting vertical pillars under the deck to support the cargo

单选题If the goods shipped are perishable,low cost goods,live animals,deck cargo,etc.,the freight and all related charges shall be paid().Aat the time of shipmentBon vessel's arrivalCat the time of sailingDat the time the voyage has been accomplished

单选题What would NOT require that a detailed report of the release of hazardous cargo be made to the Department of Transportation? ()AThe valve on an empty portable tank that contained acetone is accidently opened and some of the residue escapes to the open seaBA carboy of nitric acid is broken on deck while loading and is flushed overboard with no injuryor damageCPart of your deck cargo of five gallon cans of paint is damaged and leaking so you jettison them to eliminate the fire hazardDHeavy weather causes damage to packages of a hazardous liquid that is subsequently pumped out at sea through the bilge pumping system

单选题A sum of money paid by the Shipowner to Charterer for completing loading or discharging a cargo in less time than that stipulated in Charter Party as laydays.It is().Aextra expensesBdispatch moneyCdemurrageDremuneration

单选题Regulations require that pumprooms on tank vessels carrying grade C liquid cargo with machinery spaces below the freeboard deck be ventilated with().Apower ventilationBgooseneck vents and flame screensCat least two ducts extending to the weather deckDa vent header system

单选题Concentrated heavy loads are involved in loading a LASH vessel. What does NOT require close attention due to such loads while working cargo?() .AGM - available and requiredBLongitudinal stress numeralCTons per inch immersion numeralDDraft

单选题Connentrated heavy loads are involved in loading a lash vessel. What does not require close attention due to such loads while working cargo?().AGM-available and requiredBLongitudinal stress numberalCTons per inch immersion numeralDDraft

单选题0n the fully containerized ship, approximately one-third or more of the cargo is on deck above the rolling center. Top stowed containers are subject to().Aacceleration greater than on conventional vesselsBacceleration less than on conventional vesselsCacceleration the same as on conventional vesselsDno acceleration

单选题On the fully containerized ship,approximately one-third or more of the cargo is on deck above the rolling center. Top stowed containers are subject to().Aaccelerations greater than on conventional vesselsBaccelerations less than on conventional vesselsCaccelerations the same as on conventional vesselsDno accelerations

单选题These include deck machinery such as mooring equipment, anchor handling equipment, cranes and ().AboilersBbow thrustersCstabilizersDhatch covers

单选题To “shore up” the main deck for the stowage of deck cargo means to().Aweld pad eyes on deck in proper position to secure the cargoBstrengthen the main deck by placing pillars underneath it in the tween-decksCdistribute the weight of the cargo by placing fore-and-aft planks on the main deckDpackage the cargo in wooden crates so it will not damage the deck

单选题A clause in the charter party requires a vessel’s owner to pay dispatch money when the vessel ().Achanges berths to expedite loading or dischargingBdoes not load and discharge its cargo in the time specifiedCis not ready to load or discharge cargoDloads and discharges its cargo in less time than specified

单选题Which statement is TRUE concerning the tandem working arrangement of pedestal cranes when completing a quad lift? ()AThe discharge is slow due to the size of the cargo and all the cranes working togetherBThe cargo discharge can be accomplished with controlled pendulationCThe cargo discharge can be performed in port or at anchorDThe cranes enable the handling of heavy cargos without shoreside assistance

单选题The deck water seal of the inert gas system().Acools the inert gas and prevents soot from entering the cargo tanksBacts as an emergency shutdown when inlet pressures exceed the safe working pressureCprevents the backflow of hydrocarbon gasses into nonhazardous areasDrelieves sudden large overpressures in the system

单选题What is/are the advantage(s)of cranes over conventional cargo booms().ACranes are able to pick up and drop loads over a greater spotting areaBIncreased safety because the deck is clear of running and standing riggingCSimplicity of operation of the crane by its operatorDAll of the above