单选题Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()APhysically press the appropriate button on the system.BPhysically disconnect and reconnect the power cable on the system.CLog into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.DLog into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.

单选题
Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()
A

Physically press the appropriate button on the system.

B

Physically disconnect and reconnect the power cable on the system.

C

Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.

D

Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.


参考解析

解析: 暂无解析

相关考题:

请将下面程序补充完整。public class PowerCalc{public static void main(String[]args){double x=5.0;System. out. println(x+"to the power 4 is"+power(x, 4));System. out. println("7. 5 to the power 5 is"+power(7.5, 5));System. out. println("7.5 to the power 0 is"+power(7.5, 0));System. out. println("10 to the power -2 is"+power(10, -2));}static double【 】 (double x, int n){if(n>1)return x * power(x, n-1);else if(n<0)return 1.0/power(x, -n);elsereturn n==0 ? 1.0:x;}}

A technician needs to replace a computer’s hard drive. Which of the following should thetechnician do FIRST?() A. Remove network connectionsB. Remove the RAMC. Self ground on the computer caseD. Disconnect power to PC

Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?() A. There is a fire hazard potential if a power outage occurs.B. The last system plugged into the UPS will not be provided any power.C. The UPS will draw more power from the circuit to compensate.D. The runtime of the UPS will be insufficient if a power outage occurs.

A user reports the system runs fine for a few minutes and then freezes or locks up. Which of the following is the BEST cause of this issue?()A、Memory is bad or not seated.B、Fans are failing.C、Power supply needs to be replaced.D、CD-ROM is faulty and needs to be replaced.

What is the FIRST step in diagnosing a completely dead computer that was working fine the day before?()A、remove all peripherals and reinstall them one at a timeB、replace the CMOS batteryC、check the AC power cord and verify the power sourceD、back up the entire hard drive

A computer boots up with the error "CMOS Checksum Failure." Which of the following components needs to be replaced?()A、power supplyB、CMOS chipC、motherboardD、CMOS battery

A server will not power on. Which of the following devices should the administrator use FIRST to determine the problem?()A、Loop back plugsB、Power supply testerC、System logsD、TDR

A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored? ()A、 Identify which systems are the most critical and bring them up by level of importance.B、 Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C、 Identify the least critical systems and then power those systems on first.D、 Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.

Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()A、 There is a fire hazard potential if a power outage occurs.B、 The last system plugged into the UPS will not be provided any power.C、 The UPS will draw more power from the circuit to compensate.D、 The runtime of the UPS will be insufficient if a power outage occurs.

A technician needs to replace a computer’s hard drive. Which of the following should thetechnician do FIRST?()A、Remove network connectionsB、Remove the RAMC、Self ground on the computer caseD、Disconnect power to PC

A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700.  They would like to upgrade and plan for 40 TB capacity.  The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()A、What are the plans for Disaster Recovery? B、What are the plans for data migration? C、Would iSCSI meet your needs? D、How much space is available in the current storage systems?

Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()A、Physically press the appropriate button on the system.B、Physically disconnect and reconnect the power cable on the system.C、Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.D、Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.

A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()A、Power 710B、Power 720C、Power 730D、Power 740

A system was running properly until a reboot. Following the reboot, the system LED displayed cycles between 0223 and 0229. Which of the following procedures should be performed next?()A、Power down then power up the systemB、Boot into diagnostic mode and run fsckC、Boot from installation media and run bosbootD、Boot into maintenance mode and check the bootlist

A system administrator’s daily monitoring has revealed a failing disk drive. The drive that is failing, hdisk0, is a lvm mirrored drive. What is the first step that should be taken in order to physically replace this drive?()A、Remove the physical volume from the system.B、Remove the physical volume from the volume group.C、Remove the physical partitions from the volume group.D、Remove the logical volume copies from the failing drive.

A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()A、What are Disaster RecoveryplansB、What are plans for datamigrationC、What storage system space isavailableD、DoesiSCSI meet the needs

单选题A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored?()AIdentify which systems are the most critical and bring them up by level of importance.BRetrieve the latest backup tapes for immediate system restore using the GFS rotation.CIdentify the least critical systems and then power those systems on first.DDetermine the cause of the power outage and install UPS systems to prevent its reoccurrence.

单选题A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()AWhat are Disaster RecoveryplansBWhat are plans for datamigrationCWhat storage system space isavailableDDoesiSCSI meet the needs

单选题A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700.  They would like to upgrade and plan for 40 TB capacity.  The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()AWhat are the plans for Disaster Recovery? BWhat are the plans for data migration? CWould iSCSI meet your needs? DHow much space is available in the current storage systems?

单选题Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()APhysically press the appropriate button on the system.BPhysically disconnect and reconnect the power cable on the system.CLog into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.DLog into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.

单选题What is the FIRST and most important step in system troubleshooting?()Aback up the system dataBgather information about the problemCtry rebooting the system to see if that fixes the problemDcheck the System Error Log or Event Log

单选题What is the FIRST step in diagnosing a completely dead computer that was working fine the day before?()Aremove all peripherals and reinstall them one at a timeBreplace the CMOS batteryCcheck the AC power cord and verify the power sourceDback up the entire hard drive

单选题A system administrator’s daily monitoring has revealed a failing disk drive. The drive that is failing, hdisk0, is a lvm mirrored drive. What is the first step that should be taken in order to physically replace this drive?()ARemove the physical volume from the system.BRemove the physical volume from the volume group.CRemove the physical partitions from the volume group.DRemove the logical volume copies from the failing drive.

单选题A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored? ()A Identify which systems are the most critical and bring them up by level of importance.B Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C Identify the least critical systems and then power those systems on first.D Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.

单选题A server will not power on. Which of the following devices should the administrator use FIRST to determine the problem?()A Loop back plugsB Power supply testerC System logsD TDR

单选题Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()AThere is a fire hazard potential if a power outage occurs.BThe last system plugged into the UPS will not be provided any power.CThe UPS will draw more power from the circuit to compensate.DThe runtime of the UPS will be insufficient if a power outage occurs.

单选题To examine the Exhibit, press the Exhibit button. Using the "ps -mo THREAD" output as shown in the exhibit, which of the following conclusions is most appropriate to draw?()A  This is a uniprocessor systemB  The "prog" process has a nice value of 107C  There are two active processors on this systemD  The "prog" process will only be scheduled to run on processor 0

多选题Which of the following are attributes of a hardware-based RAID controller?()ABacks up dataBLess expensive than software RAIDCVendor neutral implementationDAccessible through a BIOS interfaceEMore host CPU usage than software RAIDFAccessible through a system utility after the OS has been loadedGMay retain data in the event of a power outage