单选题A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored?()AIdentify which systems are the most critical and bring them up by level of importance.BRetrieve the latest backup tapes for immediate system restore using the GFS rotation.CIdentify the least critical systems and then power those systems on first.DDetermine the cause of the power outage and install UPS systems to prevent its reoccurrence.
单选题
A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored?()
A
Identify which systems are the most critical and bring them up by level of importance.
B
Retrieve the latest backup tapes for immediate system restore using the GFS rotation.
C
Identify the least critical systems and then power those systems on first.
D
Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.
参考解析
解析:
暂无解析
相关考题:
A technician has had several support requests for one PC. The technician has reseated the PCIcards and replaced the hard drive in the PC located in a school cafeteria kitchen. PCs located in the business office or the classrooms have not had this issue.Which of the following is MOST likely causing this PC’s issue?()A. Faulty RAMB. 240 volt Kitchen outletsC. Power BrownoutsD. Excessive Heat
Which of the following provides the BEST security and accountability for a Data Center?() A. Entry loggingB. Combination locksC. Card keysD. Dead bolts
Certkiller .com has a remote data center with servers connected to a local datacenter through a high-speed network. Which of the following methods is the most convenient to use to install and upgrade the servers in the remote center using locally managed install images?()A.NIMB.HAGEO/HACMPC.NFSD.ftp, rsh and rexec
Cisco UCS Manager provides the ability to manage power utilization to the blades. Which two statements about UCS Manager power policies are true? ()A、 Power capping helps mainly in reducing data center footprint.B、 Power capping helps reduce data center cooling.C、 A single power cap group policy allows you to set power limits across multiple UCS domains. D、 You can have multiple power cap groups per UCS domain.E、 Each blade within a UCS 5108 chassis can belong to a separate power cap group.
Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()A、Connect to the network,power on the server,Micro-Partition the serverB、Connect to the HMC,power on the server,Micro-Partition the server,connect to the networkC、Power on server,connect to the network,Micro-Partition the server,connect to the HMCD、Power on the server,connect to the HMC,Micro-Partition the server,connect to the network
Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()A、Removes the requirement for Intelligent PDUsB、Monitor and balance disk speeds according to utilization needsC、Is a required element for EnergyStar certification of the server/data centerD、Monitor and report power and thermal trending to optimize energy consumption
A failure of the primary data center has occurred. A warm site is available for use. Which of the following should be done FIRST to bring the critical applications online?()A、Run cabling and power to the warm site.B、Restore data to the equipment.C、Transfer all data tapes over to the warm site.D、Restore least critical applications online to test to make sure the site is functioning.
Which of the following provides the BEST security and accountability for a Data Center?()A、Entry loggingB、Combination locksC、Card keysD、Dead bolts
Which of the following is eliminated when using SATA instead of PATA technology?()A、Jumper selectionB、Power connectorC、Data port connectorD、Hard drive LEDs
A technician has had several support requests for one PC. The technician has reseated the PCIcards and replaced the hard drive in the PC located in a school cafeteria kitchen. PCs located in the business office or the classrooms have not had this issue. Which of the following is MOST likely causing this PC’s issue?()A、Faulty RAMB、240 volt Kitchen outletsC、Power BrownoutsD、Excessive Heat
An administrator has experienced minor electrical shocks when touching metal surfaces in the data center. Which of the following is the MOST likely cause?()A、The UPS is using 220-240V rather than 110-120VB、The humidity is too lowC、The temperature is too lowD、The datacenter is experiencing EMI
A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored?()A、Identify which systems are the most critical and bring them up by level of importance.B、Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C、Identify the least critical systems and then power those systems on first.D、Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.
An SNMP alert has been generated by a server in the main data center.The alert stated that the internal temperature of the server has exceeded the threshold.No other servers in the rack have experienced problems,and no other alerts have come from that server about any other events.Which of the following is the cause of this issue?()A、Rack cooling equipment failureB、Dust collection in the serverC、Server processor failureD、Server power supply failure
When selling against competition, which of the following focus on the iDataPlex value proposition? ()A、Superior chip density B、Balance performance, cost, and power+cooling efficiency C、Flexible configurations ready for integration and testing at the customers data center D、Standard rack mounting
A client has a SAP production database with 10 TB of usable storage on a DS4700. The growthrate of the data is 50% per year. The majority of the data rapidly becomes reference data and isnot frequently accessed. The customer would like to implement a solution that would migrate thereference data to a less expensive disk. Which of the following would be the most cost effectivesolution?()A、 N3400 Express with SnapVault B、 DS5020 using SATA drives and TSM with HSM C、 DS5300 with Tivoli Storage Productivity Center for Data D、 DS8700 with Tivoli Storage Productivity Center for Replication
A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers. Which of the following should the Sales Specialist emphasize to address the pricing difference?()A、Higher rack density that reduces data center footprintsB、Internal upgrades that only IBM can offerC、Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches D、The Rear Door Heat eXchanger that only IBM can offer
A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()A、Two additional power suppliesB、Fibre Channel (FC) switches and SAN storageC、A Nortel 1/10 GB ESMD、SSD for the HX5
Which of the following products helps a customer identify a performance bottleneck?()A、Tivoli Storage Manager B、Tivoli Storage Productivity Center for Disk C、Tivoli Storage Productivity Center for Data D、Tivoli Storage Productivity Center for Replication
单选题A customer requires their application to have high availability within a data center, and also the ability to recover at a data center located 600km away in the event of an outage. Which system software solution component supports the customer requirement?()APowerHA SystemMirror Basic EditionBPowerHA SystemMirror Express EditionCPowerHA SystemMirror Standard EditionDPowerHA SystemMirror Enterprise Edition
单选题A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()AThe room temperature has reached 23C (73.4F). BA Blade within the chassis has been shut down. CThe ambient temperature in the data center has increased DOne of the additional System X servers in the BladeCenter rack has failed.
单选题A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored? ()A Identify which systems are the most critical and bring them up by level of importance.B Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C Identify the least critical systems and then power those systems on first.D Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.
单选题Which of the following provides the BEST security and accountability for a Data Center?()A Entry loggingB Combination locksC Card keysD Dead bolts
单选题Certkiller .com has a remote data center with servers connected to a local datacenter through a high-speed network. Which of the following methods is the most convenient to use to install and upgrade the servers in the remote center using locally managed install images?()ANIMBHAGEO/HACMPCNFSDftp, rsh and rexec
单选题According to the passage, which of the following about Europe is TRUE?AIt is dependent on Russia for gas and oil.BIt has put an end to fossil fuels.CIt had a major nuclear accident this year.DIt is likely that they would rethink their nuclear power policies.
多选题Cisco UCS Manager provides the ability to manage power utilization to the blades. Which two statements about UCS Manager power policies are true? ()APower capping helps mainly in reducing data center footprint.BPower capping helps reduce data center cooling.CA single power cap group policy allows you to set power limits across multiple UCS domains.DYou can have multiple power cap groups per UCS domain.EEach blade within a UCS 5108 chassis can belong to a separate power cap group.
单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()AOrder a POWER5 HMCBConnect to the existing HMCCInstall an 8-port asynchronous card in the managed server to connect to the existing HMCDInstall an additional network card to the existing HMC and connect to the POWER5 service processor
单选题Which of the following is a compelling reason to deploy IBM Systems Director Active Energy Manager (AEM) in a data center with high energy utilization?()ARemoves the requirement for Intelligent PDUsBMonitor and balance disk speeds according to utilization needsCIs a required element for EnergyStar certification of the server/data centerDMonitor and report power and thermal trending to optimize energy consumption