单选题A System p customer has installed components from the Linux ToolBox. By default, which of the following directories will contain the open source commands such as gzip, gunzip and zcat()A/opt/freeware/binB/usr/bin/freewareC/var/freeware/binD/usr/sbin/freeware
单选题
A System p customer has installed components from the Linux ToolBox. By default, which of the following directories will contain the open source commands such as gzip, gunzip and zcat()
A
/opt/freeware/bin
B
/usr/bin/freeware
C
/var/freeware/bin
D
/usr/sbin/freeware
参考解析
解析:
暂无解析
相关考题:
The(74)has several major components, including the system kernel, a memory management system, the file system manager, device drivers, and the system libraries.A.applicationB.information systemC.networkD.operating system
The ______ has several major components, including the system kernel, a memory management system, the file system manager, device drivers, and the system libraries.A.applicationB.information systemC.networkD.operating system
An administrator installed new components on a server. After the device installation, two of the components fail.Which of the following is the cause of the problem?()A、The server was not powered off correctly.B、The proper ESD procedures were not used.C、The devices were installed in the incorrect sequence.D、The devices are incompatible with the system.
A customer has an EMC Symmetrix DMX3000 that is at the end of lease. The environment consists of IBM System p, IBM System i, and IBM System z. The customer is evaluating EMC, HDS, and IBM storage as possible replacements. They are interested in comparing the performance of all three disk subsystems. Which tool compares performance()A、Capacity MagicB、eConfigC、TPC for DiskD、Disk Magic
The customer has recently installed a pSeries p5-570 with EMC attached disk storage. After installation, the customer complained that the disk access appeared to be too slow. How should the pSeries technical specialist best assist the customer?()A、Recommend the customer call EMC.B、Recommend the customer call IBM hardware support.C、Recommend the customer contact SupportLine.D、Recommend the customer re-creates the volume groups.
A System p customer has installed components from the Linux ToolBox. By default, which of the following directories will contain the open source commands such as gzip, gunzip and zcat()A、/opt/freeware/binB、/usr/bin/freewareC、/var/freeware/binD、/usr/sbin/freeware
A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server on a high end disk subsystem. The customer does not have a SAN installed. The customer will require approximately 24 TB of capacity for System p and 20 TB of capacity for System i. The customer states that performance of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers. Which solution best satisfies the customer requirements()A、IBM DS8700 with 600 GB drives for the System p, 300 GB/15k drives for Systemi; and advanced functions for System p capacityB、IBM DS8700 with LPAR, 300 GB/15k drives and RAID 10 for Systemi; and 600GB drives with RAID 5 and advanced functions for System p capacityC、IBM DS8700 with advanced functions, 300 GB/15k drives and RAID 10 for Systemi performance; and 600 GB drives and RAID 5 for System p capacityD、IBM DS5100 with Enhanced Remote Mirror, 600GB/15k drives and RAID 5 for System p; and 300GB/15k drives and RAID 10 for Systemi
A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further discussion confirms that the customers only has cursory knowledge of fiber channel and is not currently prepared to for the installation. What steps should be taken to make sure customer is satisfied with the solution? ()A、Suggest a cloud networkB、Direct the customer to redbooks and white papers on FC technologiesC、Work with business partner to include Lab Service engagement to setup FC environment and perform knowledge transferD、Switch project to iSCSI
A customer has an existing DS5300 system attached to two Brocade switches with eight Windowsservers. The customer wants to add their System i p750 server to this SAN. From the followingchoices what is the simplest and least expensive solution for this customer?()A、add twofibre HBAs to the System i and connect to the SANB、add twofibre HBAs to the System i and connect to the Windows ServersC、add twofibre HBAs to the System i and connect to the System i using VIOSD、add two SAS HBAs to the Systemi array and connect directly to the DS5300
A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the data migration. What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()A、Use rsync to synchronize the data across servers.B、Use exportvg and importvg to move the data to the target system.C、Use NFS to copy the data from the source system to the target system.D、Backup the data from the source system and restore to the target system.
A System p administrator has been instructed to verify that all filesets have all required requisitesand are completely installed. Which of the following commands will provide this information()A、lslppB、lppchkC、geninstallD、installp
A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()A、z/OS, DS8000, TSMB、TSM, LTO-5, VMwareC、System x, VMware, XIVD、System p, VMware, DS5000
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A、 vmstat and iostat data from the older machines B、 The number of CPUs that were installed in the original machines C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) D、 Performance data that is collected from the new system after it has been put into production
An architectural design company with 45 employees has their office located within 5 kilometers oftheir disaster recovery center. They have an IBM System Storage N6040 installed at bothlocations. In this customer environment what protocol would be used for disaster recovery?()A、NFSB、CIFSC、iFCPD、iSCSI
A customer has just received three enterprise systems that support a total of 48 LPARs. Which installation method expedite the process?()A、Network installation managerB、Boot from installation mediaC、A migration installD、Copy the system using the HMC
A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()A、Configure a 2 node x3950 X5 B、Customer needs a System p server to support Oracle applications C、Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing D、Configure a system that meets the minimum requirements
A System p distribution customer is very concerned about Reliability, Availability and Serviceability (RAS). They are planning to install several p6 servers in their facilities and want to be able to move an LPAR from one System p to another. Which of the following would accomplish this()A、System p servers using similar SAN storageB、System p servers must share an HMCC、System p servers must have the same level HMCD、System p servers with VIOS
A Sales Specialist receives an email from a customer, requesting information on IBM’s best Server Consolidation solution. How should the Sales Specialist proceed? ()A、Send the customer information on VMwareB、Send the customer information on IBM BladeCenter C、Call the customer to ask why they are consolidatingD、Send the customer information on IBM System P
The pSeries technical specialist is concerned that the installed inventory for a p670 does not match what the customer says is installed. The specialist discovers that the customer has never updated their VPD. Which of the following HMC applications is used to gather the current VPD information?()A、Service ProcessorB、Service DirectorC、Inventory Scout ServicesD、Service Focal Point
Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()A、The customer is looking for a fibre SAN solution to increase reliability and performance.B、The customer wants to implement an energy-efficient solution to comply with their Go Green initiative.C、The customer is cost-conscious and is looking for a centralized storage solution.D、The customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.
A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()A、SAN Switch modulesB、BlowersC、Power suppliesD、Battery backup units
单选题A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server. The customer does not have a SAN installed. The customer will require approximately 4 TB for System p and 3 TB for System i. The customer states that performance and isolation of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers. Which solution best satisfies the customer requirements()AIBM System Storage DS8100 with 300 GB drives for the System p, 73 GB/15k drives for System i, and advanced functions for System p capacityBIBM System Storage DS8300 with LPAR, 73 GB/15k drives for System i, and 300 GB drives and advanced functions for System p capacityCIBM System Storage DS6800 with direct attach, 73 GB/15k drives for System i performance, and 300 GB drives and advanced functions for System pDIBM System Storage DS6800 with LPAR, 146 GB/15k drives for System i, 500 GB FATA drives for System p
单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()AExplain to the customer that they need an additional HMC for the POWER5 system.BObtain a PO from the customer to purchase additional serial connections to the HMC.CObtain a PO from the customer to purchase additional Ethernet connections to the HMC.DExplain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
单选题A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A vmstat and iostat data from the older machines B The number of CPUs that were installed in the original machines C Data from Workload Estimator (WLE) and IBM Performance Management (PM) D Performance data that is collected from the new system after it has been put into production
单选题A customer has an IBM System Storage Enterprise Storage Server and several EMC CX3 systems installed in a data center, attached to IBM System p servers. As a step toward data consolidation, they intend to put all data on a new DS8700. What would be the most important data migration factors to consider()Asector size and the amount of production dataBexisting RAID levels and the disk drive speedCsector size and existing RAID levelsDamount of production data and the disk drive speed
单选题Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()AThe customer is looking for a fibre SAN solution to increase reliability and performance.BThe customer wants to implement an energy-efficient solution to comply with their Go Green initiative.CThe customer is cost-conscious and is looking for a centralized storage solution.DThe customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.
单选题The pSeries sales representative has done an excellent job in educating the customer on the benefits of working with IBM. The customer is planning to implement their first ERP application. This new application will be critical to running their business. The customer has only a competitor’s UNIX systemcurrently installed. They are interested in obtaining a proposal from IBM. In addition to the AIX hardware and HACMP software, what else should be included in the IBM proposal for the new ERP solution?()AI/T services and education to help with the implementation of the hardware and softwareBA Supportline specialist to work directly with the customer to manage any issues that ariseCThe services required to move the currently installed applications from the competitor’s systems to the IBM systemsDA slimmed down solution to ensure that the IBM solution is less expensive than the competitor’s solution