单选题During the watch keeping at sea, the engineer in charge should notify in the event of any serious occurrence or a situation where he is unsure of the action to take()Athe masterBthe chief engineerCthe bridgeDthe company superintendent

单选题
During the watch keeping at sea, the engineer in charge should notify in the event of any serious occurrence or a situation where he is unsure of the action to take()
A

the master

B

the chief engineer

C

the bridge

D

the company superintendent


参考解析

解析: 暂无解析

相关考题:

STCW78/95 Convention describes that _____ are laid down for the certification of engineer officers in charge of a watch in a traditionally manned engine room, or the designated engineer in a periodically unmanned engine room.A.available minimum requirementsB.available maximum requirementsC.mandatory minimum requirementsD.mandatory maximum requirements

When will an Engineer Officer in charge of watch call Chief Engineer?

At an unsheltered anchorage the chief engineer officer shall consult with_______whether or not to maintain an underway watchA.the engineer officer in charge of watchB.the deck officer in charge of watchC.the masterD.the chief mate

During the watch keeping at sea, the engineer in charge should notify______in the event of any serious occurrence or a situation where he is unsure of the action to takeA.the masterB.the chief engineerC.the bridgeD.the company superintendent

STCW78/95 Convention states that the officer in charge of the engineering watch is the representativeA.ship-owner'sB.master'sC.chief engineer'sD.manager's

which machineries and spare parts should the third engineer be in charge of ?

when you do the watch keeping in the engine room ,what should you be careful about ?

The engineer ______ the watch to the relieving officer if there is reason to believe that the latter is obviously not capable of carrying out the watch-keeping duties effectively.A.shall take overB.shall not take overC.shall hand overD.shall not hand over

At an unsheltered(开放的) anchorage the chief engineer officer shall consult with ______whether or not to maintain an underway watch.A.the engineer officer in charge of watchB.the deck officer in charge of watchC.the masterD.the chief mate

The Company should establish in the SMS that ______has the overriding authority and the responsibility to make decisions with respect to safety and pollution prevention.A.the masterB.the chief engineerC.the officer on dutyD.the engineer in charge of watch

单选题At an unsheltered anchorage the chief engineer officer shall consult with () whether or not to maintain an underway watch.Athe engineer officer in charge of watchBthe deck officer in charge of watchCthe masterDthe chief mate

单选题The officer in charge of the engineering ()the watch to the reliving officer if there is reason to believe that the latter is obviously not capable of carrying out the watch-keeping duties effectively.Ashall take overBshall not take overCshall hand overDshall not hand over

单选题The officer in charge of the engineering watch shall continue to be responsible for machinery operations, ()the presence of the chief engineer in the machinery space.Aas long asBunlessCdespiteDtill

单选题The officer in charge of the engineering watch shall notify the chief engineer without delay ().Ain any emergency or if in any doubt as to what decision or measures to takeBin the event of any impending action in machinery spaces that may cause reduction in ship’s speedCwhen isolating and bypassing machinery to be worked onDco-operating with any engineer in charge of maintenance work

单选题While on watch at sea you must maintain a proper lookout at all times. On a 700-foot cargo vessel being hand-steered during daylight hours in good visibility and clear of any navigational hazards,the lookout may be().Athe helmsmanBthe mate on watchCEither A or BDNeither A nor B

单选题When the chief engineer is in the machinery spaces, the officer in charge of the engineering watch shall()Acontinue to be responsible for machinery space operations despite the presence of the CEBhand over the responsibility activelyCbe responsible for the watching together with the chief engineerDassistant the chief engineer to control the machinery

单选题At an unsheltered anchorage the chief engineer officer shall consult with the master whetheror not to maintain an underway watch“An underway watch” means()Aa watch which is kept with lower standardBa watch which is kept when the ship isnt sailingCa watch which is kept when the ship is sailingDa watch which is kept when the ship is in a restricted visibility area

单选题During an engine room watch if immediate action is necessary to ensure safety of the ship its machinery and crew ()Athe chief engineer must be informed at firstBthe captain must be informed at firstCit must be taken by the duty engineerDthe generator engine must be stopped

单选题During the watch at sea () should be logged or recorded in the engine log book.Athe running hours of the cooling water pumpBchief engineer’s orderCthe main parameters of main and auxiliary equipmentDthe position of the vessel

单选题When the engine room is put in standby condition, the engineer in charge of the watch need not to()Aensure all machinery which may be used during maneuvering is in readyBensure an adequate reserve of power is available for steering gear and other requirementsCkeep the main propulsion unit controls continuously attended when in the manual mode of operationDensure all machinery which may be used during maneuvering is running stably

单选题STCW78/95 Convention describes that () are laid down for the certification of engineer officers in charge of a watch in a traditionally manned engine room, or the designated engineer in a periodically unmanned engine room.Aavailable minimum requirementsBavailable maximum requirementsCmandatory minimum requirementsDmandatory maximum requirements

单选题During the watch keeping at sea, routine adjustments should be ()Amade and noted as required by the duty engineerBreported to chief engineer immediately after being made by duty engineerCnever made before getting permission from chief engineerDmade as required but not logged

单选题During the watch keeping at sea, at appropriate intervals inspection should be made of (), auxiliary machinery and steering gear spaces by the duty engineer.Athe main propulsion plantBlifesaving jacketsClifeboat engineDstate of emergency generator

单选题During the watch at sea, where situations occur in the machine apace which may affect the speed maneuverability, power supply or other essentials for the safe operation of the ship()should be informed as soon as possible.Athe chief engineerBthe masterCthe bridgeDthe company superintendent

单选题The Company should establish in the SMS that () has the overriding authority and the responsibility to make decisions with respect to safety and pollution prevention.Athe masterBthe chief engineerCthe officer on dutyDthe engineer in charge of watch

单选题The officer of the watch()a good lookout on the bridge.AkeepBkeepingCkeepsDis keeping

单选题The responsibilities of the engineer officer in charge of the watch do not include ()Ato ensure the main propulsion plant are kept under constant surveillanceBto ensure the auxiliary systems are kept under constant surveillanceCto inspect the steering gear spaces at suitable intervalsDto inspect and overhaul the equipments in his charge