单选题When the chief engineer is in the machinery spaces, the officer in charge of the engineering watch shall()Acontinue to be responsible for machinery space operations despite the presence of the CEBhand over the responsibility activelyCbe responsible for the watching together with the chief engineerDassistant the chief engineer to control the machinery
单选题
When the chief engineer is in the machinery spaces, the officer in charge of the engineering watch shall()
A
continue to be responsible for machinery space operations despite the presence of the CE
B
hand over the responsibility actively
C
be responsible for the watching together with the chief engineer
D
assistant the chief engineer to control the machinery
参考解析
解析:
暂无解析
相关考题:
The officer in charge of the engineering watch shall notify the chief engineer without delay ____.A.in any emergency or if in any doubt as to what decision or measures to takeB.in the event of any impending action in machinery spaces that may cause reduction in ship's speedC.when isolating and bypassing machinery to be worked onD.co-operating with any engineer in charge of maintenance work
If anything abnormal be found on the load change of main engine when the ship is entering in shallow waterway, before taking measures the engineer on duty should _______.A.stop main engine immediatelyB.ask the captain and the chief engineer's permission for stopping the engineC.inquire the bridge for the situation initiativelyD.stop engine and inform bridge
When deciding the composition of the engineering watch, which may include____ appropriately, many factors shall be taken into account.A.satisfied engineersB.qualified ratingsC.satisfied chief engineerD.qualified chief' engineer
When anchoring in unsheltered anchorage, chief engineer should consult with captain ____.A.if the ship must be stand byB.if take bunkeringC.if keep-watching as in voyageD.if the ship must anchor two anchors
At an unsheltered(开放的) anchorage the chief engineer officer shall consult with ______whether or not to maintain an underway watch.A.the engineer officer in charge of watchB.the deck officer in charge of watchC.the masterD.the chief mate
单选题At an unsheltered anchorage the chief engineer officer shall consult with () whether or not to maintain an underway watch.Athe engineer officer in charge of watchBthe deck officer in charge of watchCthe masterDthe chief mate
单选题The person on a ship who is responsible for maintaining the engineering spaces in a clean and sanitary condition is the().AMaster,or person in chargeBChief Engineer,or engineer in charge if no chief engineer is requiredCSenior mechanic,or mechanic on duty if no senior mechanic designatedDSenior electrician,or electrician on duty if no senior electrician designated
单选题When deciding the composition of the engineering watch, which may include appropriately, many factors shall be taken into account().Asatisfied engineersBqualified ratingsCsatisfied chief engineerDqualified chief engineer
单选题If anything abnormal be found on the load change of main engine when the ship is entering in shallow waterway, before taking measuring the engineer on duty should ()Astop main engine immediatelyBask the captain and the chief engineer’s permission for stopping the engineCinitiatively inquire the bridge for the situationDstop engine and inform bridge
单选题The officer in charge of the engineering watch shall continue to be responsible for machinery operations, ()the presence of the chief engineer in the machinery space.Aas long asBunlessCdespiteDtill
单选题The officer in charge of the engineering watch shall notify the chief engineer without delay ().Ain any emergency or if in any doubt as to what decision or measures to takeBin the event of any impending action in machinery spaces that may cause reduction in ship’s speedCwhen isolating and bypassing machinery to be worked onDco-operating with any engineer in charge of maintenance work
单选题In the event of minor emergencies when the machinery spaces unattended () will be informed of malfunction in the machinery by his cabin monitor.Athe chief engineerBthe engineer on cabin watchCthe bridge officer on watchDthe master
单选题When the machinery spaces are in the periodic unmanned condition, shall be immediately available and on call to attend the machinery space().Athe chief engineerBthe designated engineer from shipyardCthe designated duty officer in charge of the engineering watchDthe designated surveyor from classification society
单选题It was ______ the chief engineer came ______ we began the experiment.Anot until; that Bnot until; then Cuntil; that Duntil; when
单选题At an unsheltered anchorage the chief engineer officer shall consult with the master whetheror not to maintain an underway watch“An underway watch” means()Aa watch which is kept with lower standardBa watch which is kept when the ship isnt sailingCa watch which is kept when the ship is sailingDa watch which is kept when the ship is in a restricted visibility area
单选题During an engine room watch if immediate action is necessary to ensure safety of the ship its machinery and crew ()Athe chief engineer must be informed at firstBthe captain must be informed at firstCit must be taken by the duty engineerDthe generator engine must be stopped
单选题When the PSCO would like to witness a fire drill carried out by the crew, he should consult ()to locate a simulated fire.Athe manager of the companyBthe surveyor of the Classification SocietyCthe master of the vesselDthe chief engineer of the vessel
单选题However, where immediate action is necessary to ensure safety of the ship, its machinery and crew, it must be taken by the engineer in chargeWhat dose “it” mean in the sentence above?()AsafetyBthe ship, its machinery and crewCimmediate actionDthe engineer in charge
单选题When accepting engine room spares, you should()Asend a requisition list to the supplierBcheck that whether the items ordered have been already deliveredCmake the chief engineer on sportDfollow a preset procedure
单选题When the engine room is put in standby condition, the engineer in charge of the watch need not to()Aensure all machinery which may be used during maneuvering is in readyBensure an adequate reserve of power is available for steering gear and other requirementsCkeep the main propulsion unit controls continuously attended when in the manual mode of operationDensure all machinery which may be used during maneuvering is running stably
单选题During the watch keeping at sea, at appropriate intervals inspection should be made of (), auxiliary machinery and steering gear spaces by the duty engineer.Athe main propulsion plantBlifesaving jacketsClifeboat engineDstate of emergency generator
单选题Deck machinery, which is also known as hull machinery, includes all power driven equipment located ()the machinery spaces that is () with the main propulsion plant.Ainside;associatedBinside;not associatedCoutside;associatedDoutside;not associated
单选题During tours of inspection in the machinery space, you found a fire on a running generator, what should you do first?()Ainform chief engineer officer immediatelyBstop the generatorClet the duty officer in bridge determine how to doDwait for help