单选题Prior to any overhaul work on electric equipment, it is important to ensure the circuits are ().AliveBdeadCexcitedDon line
单选题
Prior to any overhaul work on electric equipment, it is important to ensure the circuits are ().
A
live
B
dead
C
excited
D
on line
参考解析
解析:
暂无解析
相关考题:
—Are you pleased with your work?—Yes, it couldn't beA. any betterB. any worseC. the bestD. the worst
But in spite of his disadvantage in physical condition, Prior enjoys his work and excels in Goldman’s trading.() 此题为判断题(对,错)。
What is NOT true about overhaul repair?( ) A.Overhaul repair is a major repair.B.Overhaul repair is carried out in a dock.C.Overhaul repair is carried out once a year.D.Overhaul repair is done for the purpose of rating.
After a seaman is discharged,at the end of the voyage,the final payment of wages due must be made at the earlier of within 24 hours after the cargo has been discharged or______.A.within 4 days after the seaman's dischargeB.prior to the vessel's departure on the next voyageC.prior to loading any out-bound cargoD.prior to any change of Master
The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ______.A.terminal operatorB.owner of the bargeC.tankerman or person in charge of loadingD.charterer through the Master of the towing vessel
That REMOVE ANY LIST ON THE V/L AFTER EACH WATCH END means that ______.A.any list,no matter where it is posted,shall be removed prior to ending his watch by the OOWB.the vessel should not be removedC.any and all lists on board the vessel should be taken offD.the inclination of the vessel should be corrected prior to ending his watch by the OOW
The majority researcher tend to use the methods which are______or consistent with their prior work.A.feasibleB.probableC.possibleD.capable
Any equipment that does not arrive in perfect ____ may be returned to MQZ Electronics free of charge.A.developmentB.situationC.problemD.condition
Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()A、 elapsed time since the target start date or completion date of previous work generated by PM B、 difference between completion date of previous work and system date is equal to Lead Time C、 elapsed time since the target start date or completion date of the latest work orders for the assetD、 metered equipment usage since the target start date or completion date of previous work generated by PME、 metered equipment usage since the target start date or completion date of the latest work order for the asset
Which of the following components should be removed prior to troubleshooting any server hardware failure?()A、Memory in RAIDB、Hard drivesC、Third party memoryD、Airflow baffles
单选题What describes an accurate position that is NOT based on any prior position? ()ADead-reckoning positionBEstimated positionCFixDRunning fix
单选题The final inspection responsibility for seeing that a tank barge is provided with the required equipment and fittings in good and serviceable condition prior to loading cargo rests with the ().Aterminal operatorBowner of the bargeCtankerman or person in charge of loadingDcharterer through the Master of the towing vessel
单选题In addition to their simple beauty, what makes the adobe dwellings admirable is their________ to air-condition a house without using electric equipment.AabsorptionBabilityCabolitionDadaptation
单选题What is meant by the term overhaul in firefighting?()ASlow down the spread of fire by cooling adjacent structuresBCover the fire with foamCSmother the fire with a blanket or similar objectDBreak up solid objects to ensure that any deep seated fires are extinguished
单选题I am afraid you can’t dismantle the equipment in that way ().Ain the caseBin any caseCin no caseDin case
单选题Which of the following statements represents the FIRST precaution to be taken prior to working on any installed electrical component ()AWear rubber gloves and bootsBUse only approved non-conducting toolsCGround the case of the machine before beginning any repairsDOpen the supply circuits and tag the switches
单选题Before any work on electrical or electronic equipment is performed, which of the following precautions should be carried out ()ADe-energize the applicable switchboard busBBypass the interlocksCSecure and tag the supply circuit breaker in the open positionDStation a man at the circuit supply switch
单选题Any electric motor can be constructed to be().Ashort proofBground proofCexplosion proofDoverload proof
单选题Inductance is the property of an electric circuit that ()Aopposes any change in the applied voltageBopposes any change in the current flow through the circuitCaids any changes in the applied voltageDaids any changes in the current through the circuit
单选题The best tool to use for removing the carbon ridge at the top of an enginecylinder, prior to removing the piston, is to use()Aan electric grinderBa metal scraperCa reamerDa three-wing hone
单选题For occasional heavy loads, two cranes can be arranged to work together. The operating () for deck crane motors may be hydraulic electric.AprincipleBmediumCinstructionDvoltage
单选题Before using or operating any equipment, you should first () its manual thoroughly and understand its contents().Aread/sufficientBconsult/sufficientlyCread/sufficientlyDconsult/sufficient
单选题Which of the listed pre-start procedures should be carried out prior to starting a crosshead type diesel engine after an overhaul?()APre-lube cylinders with hand cranksBOpen all air space drain cocksCOpen all indicator valvesDAll of the above
多选题Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()Aelapsed time since the target start date or completion date of previous work generated by PMBdifference between completion date of previous work and system date is equal to Lead TimeCelapsed time since the target start date or completion date of the latest work orders for the assetDmetered equipment usage since the target start date or completion date of previous work generated by PMEmetered equipment usage since the target start date or completion date of the latest work order for the asset
单选题Any firefighting equipment that is carried in addition to the minimum required must().Ameet the applicable standardsBbe marked as additional equipmentCbe stowed in a separate areaDAll of the above
单选题The master shall ensure that any seafarers()are provided with an adequate period of rest.Awho have performed work for 14 hoursBwho have performed work in a scheduled rest periodCwho have performed work in a scheduled work periodDwho works hard