______ is not a proper instruction for laying hatch beams.A.to be laid on their sidesB.to be stood on edge close togetherC.be lashedD.be covered

______ is not a proper instruction for laying hatch beams.

A.to be laid on their sides

B.to be stood on edge close together

C.be lashed

D.be covered


相关考题:

What you said is not true! You are ________! A.liarB.lieC.lyingD.laying

____________, Newton was thinking and thinking.A、He lied under the apple treeB、Laying under the apple treeC、He laid under the apple treeD、Lying under the apple tree

______ is known as a long hatch during loading operation.A.The largest hatch of a shipB.The hatch that is double riggedC.The hatch where a disproportionate amount of cargo is stowedD.The hatch where the most cargo is stowed

When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ______.A.Provide the proper trimB.Prevent negative stability from developingC.Prevent excessive longitudinal stressesD.Control list

Tonnage openings must be closed by means of ______.A.Press boardB.Steel hatch boardsC.Steel platesD.Wooden hatch boards

______ is not a proper instruction for handling hatch covers.A.not to obstruct clear fore-and-aft passagewaysB.not to obstruct coaming-to-bulwark passagewaysC.to be lashed or otherwise secured to prevent accidental dislodgementD.to be laid on their sides

What publications should a GMDSS Operator consult regarding the proper set-up and operation of vessel equipment ________.A.ITU PublicationsB.The manufacturers instruction manualsC.Part 90 of the FCC Rules and RegulationsD.Code of Federal Regulations,Title 47,Part 80,Subpart W

______ is not a proper form for Muster lists.A.A separate card given to each crew memberB.A separate instruction booklet given to each crew memberC.A card fixed in each cabin with instructions for the occupant of the cabinD.A well prepared notice posted on water-tight doors and/or in chart-room

The boy( )when he said that he ( )the eggs( )by the hen in the closet before he( )down to have a rest。A.was lying,had laid,laid,layB.had laid,lay,laid,was lyingC.lay,was lying,lain, layD.laid,lay,lain,lies

2号舱口处的起货机出故障了。()A、There is something wrong with the derrick at hatch No.2.B、There is something wrong with the derrick at hatch No.1.C、There is something wrong with the winch at hatch No.2.D、There is something wrong with the winch at hatch No.1.

Our practices are conformable to the requirements()by international organizations.A、laid downB、lied downC、layd ownD、laid out

Close the (), please.A、hatch coamingsB、hatch coversC、hatch beamsD、hatch openings

If there is a fire in a hold, what should you do?()A、Close the hatch, accesses and ventilators at once. Flood CO2 into hold.B、Open the hatch, accesses and ventilators at once. Flood CO2 into hold.C、Close the hatch, accesses and ventilators at once. Flood water into hold.D、Open the hatch, accesses and ventilators at once. Flood water into hold.

单选题请把吊杆甩到舱口上方好吗?()AWill you please swing the heavy derrick over the hatch?BWill you please swing the derrick over the hatch?CWill you please lower the derrick over the hatch?DWill you please top the heavy derrick over the hatch?

单选题In preparing a cargo space for receipt of a shipment of bagged cargo,which instruction for laying dunnage should be followed? ()AUse either 1 or 2 tiers of dunnage,spacing the pieces in each tier a foot apart,and lay pieces in the bottom tier diagonally to the ship's sideBUse 1 tier of dunnage,laying the pieces tightly together to form a solid floor over the steel deckCUse 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier 6 inches apartDUse 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier together

单选题Tell me(),please.Awhich hatch will be loaded firstBwill which hatch be loaded firstCwill hatch of which be loaded firstDfirst will which hatch be loaded

单选题我船配有自动舱盖。()AOur ship is equipped with automatic hatch covers.BOur ship is equipped with folding-type hatch covers.COur ship is equipped with side-rolling hatch covers.DOur ship is equipped with rolling-type hatch covers.

单选题Are you testing the()(液压舱盖)?Ahydraulic hatch coverBhydraulic release unitChydraulic oil jackDautomatic hatch cover

单选题Tonnage openings must be closed by means of().APress boardBSteel hatch boardsCSteel platesDWooden hatch boards

单选题The()(侧滚式舱盖) runs along the guide rail.Arolling type hatch coverBside-rolling hatch coverCfolding type hatch coverDautomatic hatch cover

单选题装卸货之前,打开舱盖。()AAfter loading and discharging, hatch covers will be opened.BAfter loading and discharging, hatch covers will be closed.CBefore loading and discharging, hatch covers will be opened.DBefore loading and discharging, hatch covers will be closed.

单选题每一个舱盖由两个或更多的盖板组成。()AEach hatch consists of two panels.BEach hatch cover consists of two panels.CEach hatch consists of two or more panels.DEach hatch cover consists of two or more panels.

单选题()is known as a long hatch during loading operation.AThe largest hatch of a shipBThe hatch that is double riggedCThe hatch where a disproportionate amount of cargo is atowedDThe hatch where the most cargo is stowed

单选题What publications should a GMDSS Operator consult regarding the proper set-up and operation of vessel equipment().AITU PublicationsBThe manufacturers instruction manualsCPart 90 of the FCC Rules and RegulationsDCode of Federal Regulations,Title 47,Part 80,Subpart W

单选题The()(折叠式舱盖) can fold slowly.Arolling type hatch coverBside-rolling hatch coverCfolding type hatch coverDautomatic hatch cover

单选题The proper place()the sling is made up is the square of the hatch.AwhichBwhereCwhenDhow

单选题When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ().Aprovide the proper trimBprevent negative stability from developingCprevent excessive longitudinal stressesDcontrol list