______ is not a proper instruction for handling hatch covers.A.not to obstruct clear fore-and-aft passagewaysB.not to obstruct coaming-to-bulwark passagewaysC.to be lashed or otherwise secured to prevent accidental dislodgementD.to be laid on their sides

______ is not a proper instruction for handling hatch covers.

A.not to obstruct clear fore-and-aft passageways

B.not to obstruct coaming-to-bulwark passageways

C.to be lashed or otherwise secured to prevent accidental dislodgement

D.to be laid on their sides


相关考题:

During the PSC inspection, under the provisions of SOLAS 74, which one be regarded as clear grounds for ships' detainment?A.failure of proper operation of propulsionB.paint peeling off the uptakeC.no operation procedures for file oil separatorsD.damaged sanitary pump

______ is known as a long hatch during loading operation.A.The largest hatch of a shipB.The hatch that is double riggedC.The hatch where a disproportionate amount of cargo is stowedD.The hatch where the most cargo is stowed

When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ______.A.Provide the proper trimB.Prevent negative stability from developingC.Prevent excessive longitudinal stressesD.Control list

______ is not a proper instruction for laying hatch beams.A.to be laid on their sidesB.to be stood on edge close togetherC.be lashedD.be covered

What publications should a GMDSS Operator consult regarding the proper set-up and operation of vessel equipment ________.A.ITU PublicationsB.The manufacturers instruction manualsC.Part 90 of the FCC Rules and RegulationsD.Code of Federal Regulations,Title 47,Part 80,Subpart W

______ is not a proper form for Muster lists.A.A separate card given to each crew memberB.A separate instruction booklet given to each crew memberC.A card fixed in each cabin with instructions for the occupant of the cabinD.A well prepared notice posted on water-tight doors and/or in chart-room

Chinese Internet users tend to use more proper and skillful search means for locating keywords and handling search engines than their Japanese______.A.counterpartsB.friendsC.pioneersD.classmates

2号舱口处的起货机出故障了。()A、There is something wrong with the derrick at hatch No.2.B、There is something wrong with the derrick at hatch No.1.C、There is something wrong with the winch at hatch No.2.D、There is something wrong with the winch at hatch No.1.

Re-handling can save cost and improve service, Is it true or not? ()A、WrongB、Not total trueC、TrueD、Not clear here

高速和野蛮操作舱盖均是危险的。()A、High-speed operation and rough handling of hatches are dangerous.B、Low-speed operation and rough handling of hatches are dangerous.C、Low-speed operation and rough handling of hatch covers are dangerous.D、High-speed operation and rough handling of hatch covers are dangerous.

Close the (), please.A、hatch coamingsB、hatch coversC、hatch beamsD、hatch openings

单选题During the PSC inspection under the provision of SOLAS 74, which one may be regarded as clear grounds for ships’ detainment?()Afailure of proper operation of propulsionBpaint peeling off the uptakeCno operation procedures for the oil separatorsDdamaged sanitary pump

单选题Re-handling can save cost and improve service, Is it true or not? ()AWrongBNot total trueCTrueDNot clear here

单选题Tell me(),please.Awhich hatch will be loaded firstBwill which hatch be loaded firstCwill hatch of which be loaded firstDfirst will which hatch be loaded

单选题The proper safety guidelines for handling any device specific consumables can be found in which of the following documentation?()AMaterial Safety Data SheetsBInstallation GuidesCConsumer ReportsDDevices Parts Catalog

单选题高速和野蛮操作舱盖均是危险的。()AHigh-speed operation and rough handling of hatches are dangerous.BLow-speed operation and rough handling of hatches are dangerous.CLow-speed operation and rough handling of hatch covers are dangerous.DHigh-speed operation and rough handling of hatch covers are dangerous.

单选题The()(侧滚式舱盖) runs along the guide rail.Arolling type hatch coverBside-rolling hatch coverCfolding type hatch coverDautomatic hatch cover

单选题During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()Afailure of the proper operation of emergency generatorBinsulation of piping including exhaust pipes in engine room contaminated by oilCimproper operation of bilge of bilge of bilge pumping arrangementsDdamaged sanitary pump

单选题While on watch at sea you must maintain a proper lookout at all times. On a 700-foot cargo vessel being hand-steered during daylight hours in good visibility and clear of any navigational hazards,the lookout may be().Athe helmsmanBthe mate on watchCEither A or BDNeither A nor B

单选题装卸货之前,打开舱盖。()AAfter loading and discharging, hatch covers will be opened.BAfter loading and discharging, hatch covers will be closed.CBefore loading and discharging, hatch covers will be opened.DBefore loading and discharging, hatch covers will be closed.

单选题()is known as a long hatch during loading operation.AThe largest hatch of a shipBThe hatch that is double riggedCThe hatch where a disproportionate amount of cargo is atowedDThe hatch where the most cargo is stowed

单选题What publications should a GMDSS Operator consult regarding the proper set-up and operation of vessel equipment().AITU PublicationsBThe manufacturers instruction manualsCPart 90 of the FCC Rules and RegulationsDCode of Federal Regulations,Title 47,Part 80,Subpart W

单选题During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()Afailure of the proper operation of the main steering gearBfailure of the proper operation of electrical installationsCleakage of domestic water pumpDinsulation of exhaust pipes in engine room contaminated by oil

单选题The()(折叠式舱盖) can fold slowly.Arolling type hatch coverBside-rolling hatch coverCfolding type hatch coverDautomatic hatch cover

单选题The proper place()the sling is made up is the square of the hatch.AwhichBwhereCwhenDhow

单选题Personnel who are moving or handling material aboard ship should NOT follow which of the listed practices?()Asignaling that all personnel are clear before lifting or lowering materialBExamining material for sharp edges or protruding points before handlingCClosing, tagging, or securing valves that permit entrance of steam, water, or air into a fitting or other equipmentDThrowing materials from high places to the deck

单选题When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ().Aprovide the proper trimBprevent negative stability from developingCprevent excessive longitudinal stressesDcontrol list