During fueling,all doors,hatches,and ports ______.A.to windward should be opened and the ones to leeward should be closedB.to leeward should be opened and the ones to windward should be closedC.should be openedD.should be closed
During fueling,all doors,hatches,and ports ______.
A.to windward should be opened and the ones to leeward should be closed
B.to leeward should be opened and the ones to windward should be closed
C.should be opened
D.should be closed
相关考题:
[ ] During negotiations, one should treat an opponent with respect and considerationat all times.
The date, hour and place for latest delivery of bids by the bidder, and of the bid opening, should be announced in the invitation () bid, and all bids should be opened at the stipulated time.A、ofB、atC、inD、to
During UMS rounds, a duty engineer notices that the fuel oil overflow observation glass is full of oil. Should he ____.A.Stop all F.O. transfers immediately, and inform the chief engineer.B.Make a sounding of the F.O. overflow tank and decide if there is enough capacity to leave it until the following morning.C.Call a motorman and have him sound the F.O. overflow tank periodically during the night.D.start the F.O. purifier
The Certificate of pratique shall only have effect in ______.A.all ports of the issuing countryB.all ports of the worldC.all ports other than a issuing countryD.all ports of ship's arrival
During an abandonment or drill,the first person to arrive at the survival craft should ______.A.pass out food and water to personnelB.open the doors and start the sprinkler systemC.activate the emergency release handleD.open the doors and prepare the craft for boarding
Upon completion of fueling a gasoline driven vessel it is necessary to ______.A.keep ports,doors,windows,and hatches closedB.start engines immediatelyC.ventilate before starting engineD.None of the above
In most cases involving spillage of dangerous goods,the most effective response will probably be to ______.A.attempt to repack dangerous goodsB.close all hatches and doorsC.open all hatches and doorsD.wash the substance overboard or jettison it
The DAI feature has been implemented in the Company switched LAN. Which three statements are true about the dynamic ARP inspection (DAI) feature? ()A、 DAI can be performed on ingress ports only.B、 DAI can be performed on both ingress and egress ports.C、 DAI is supported on access ports, trunk ports, EtherChannel ports, and private VLAN ports. D、 DAI should be enabled on the root switch for particular VLANs only in order to secure the ARP caches of hosts in the domain.E、 DAI should be configured on all access switch ports as untrusted and on all switch ports connected to other switches as trusted.F、 DAI is supported on access and trunk ports only.
单选题During working, thermostatic expansion valve should be ().Aeither all the way open or all the way closedBnormally fully openCthrottled depending on loadDcontrolled by liquefied pressure
单选题When operating the air supply system in a covered lifeboat the().Afuel supply valve should be closedBhatches,doors,and oar ports should be closedCair cylinder shut-off valve should be closedDengine should be shut off
单选题During storm conditions on a vessel,the mooring tensions should be adjusted so that().Aall mooring lines have a different tensionBthe leeward lines have higher tension than the windward linesCthe maximum tension of the most heavily loaded line does not exceed the safe working loadDall horizontal tension forces on the windward lines are no greater than the vertical tension forces
单选题During an abandonment or drill,the first person to arrive at the survival craft should().Apass out food and water to personnelBopen the doors and start the sprinkler systemCactivate the emergency release handleDopen the doors and prepare the craft for boarding
单选题Before opening and closing the hatches, the spaces around the covers, all the parts and the gears should be ().AclearedBcheckedCremovedDrepaired
多选题The DAI feature has been implemented in the Company switched LAN. Which three statements are true about the dynamic ARP inspection (DAI) feature? ()ADAI can be performed on ingress ports only.BDAI can be performed on both ingress and egress ports.CDAI is supported on access ports, trunk ports, EtherChannel ports, and private VLAN ports.DDAI should be enabled on the root switch for particular VLANs only in order to secure the ARP caches of hosts in the domain.EDAI should be configured on all access switch ports as untrusted and on all switch ports connected to other switches as trusted.FDAI is supported on access and trunk ports only.
单选题Upon completion of fueling a gasoline driven vessel it is necessary to().Akeep ports,doors,windows,and hatches closedBstart engines immediatelyCventilate before starting engineDNone of the above
单选题When possible,what is the FIRST step in fighting an engine fuel-pump fire which results from a broken fuel line?()ASecure all engine room doors,hatches,and ventsBClose the fuel line valveCCheck the spread of the fire with foamDCast the barge off the wharf
单选题Once a fire is detected the engine should be slowed downOn no account ().Athe trunking should be opened upBshould the trunking be opened upCthe trunking should not be opened upDshould the trunking not be opened up
单选题During fueling operations, which of the listed precautions should be taken when topping off fuel tanks?()AReduce the pumping rate by closing the deck filling valveBClose all overflow valvesCPlace 5 gallon containers under all flange connections in the fuel lineDReduce the pumping rate and sound tanks frequently as the level rises
单选题What shall be conducted during a fire and boat drill?()AAll watertight doors which are in use while the vessel is underway shall be operatedBAll lifeboat equipment shall be examinedCFire pumps shall be started and all exterior outlets openedDAll of the above
单选题The exhaust valve is opened at about the same time () the air inlet ports are opened.AbeforeBafterCwhenDuntil
单选题During fueling,all doors,hatches,and ports().Ato windward should be opened and the ones to leeward should be closedBto leeward should be opened and the ones to windward should be closedCshould be openedDshould be closed
单选题During fueling, all doors. Hatches,and ports().Ato windward should be opened and the ones to leeward should be closedBto leeward should be opened and the ones to windward should be closedCshould be openedDshould be closed
单选题When fueling has been completed().Athe fuel tank fill pipe should be left open to allow vapors to vent from the tankBthe engine should be started immediately to prevent vapor lock in the fuel lineCall hatches should be opened and all compartments should be ventilatedDopen the fuel line and drain a small amount of gasoline into the bilge to clear the line of sediment
单选题Which statement is FALSE concerning precautions during fueling operations?()AAll engines,motors,fans,etc. should be shut down when fuelingBAll windows,doors,hatches,etc. should be closedCA fire extinguisher should be kept nearbyDFuel tanks should be topped off with no room for expansion