A ship crane which has been idle for a period of over six months shall be inspected to the same standards as a ______.A.yearly inspectionB.quarterly inspectionC.monthly inspectionD.weekly inspection

A ship crane which has been idle for a period of over six months shall be inspected to the same standards as a ______.

A.yearly inspection

B.quarterly inspection

C.monthly inspection

D.weekly inspection


相关考题:

It has been over a century _______ the railway was completed. (A)when(B) once(C) which(D) since

How long has Katy been in Nepal?A. eight months B. six months C. four months D. one moth

We can obviously notice that over a period of no practice what has been learned tends to be forgotten from______.

Which information is not given in the text?A.Ship recycling contributes to sustainable developmentB.The IMO believes that making an international instrument to regulate the ship recycling process is urgently in needC.An international convention on ship recycling has been adoptedD.The IMO has taken action to develop an effective solution to the problem of ship recycling

The Owners let,and the Charterers _______ the Vessel for a Period of six(6)calendar months(exact period at Charterers' option)commencing from the time of delivery of the Vessel.A.borrowB.useC.hireD.rent

Until security has been provided the Contractor shall have a maritime lien on ______ for his remuneration.A.the property lostB.the property salvedC.the property involved in the accident which gave rise to the salvage operationsD.any other property in danger which is not and has not been on board the vessel

材料:A Passenger Ship Safety Certificate shall be issued for a period not exceeding 12 months.A Cargo Ship Safety Construction Certificate,Cargo Ship Safety Equipment Certificate and Cargo Ship Safety Radio Certificate shall be issued for a period specified by the Administration which shall not exceed five years.An Exemption Certificate shall not be valid for longer than the period of the certificate to which it refers.(i)When the renewal survey is completed within three months before the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:(1)for a passenger ship,a date not exceeding 12 months from the date of expiry of the existing certificate;(2)for a cargo ship,a date not exceeding five years from the date of expiry of the existing certificate;(ii)When the renewal survey is completed after the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:(1)for a passenger ship,a date not exceeding 12 months from the date of expiry of the existing certificate;(2)for a cargo ship,a date not exceeding five years from the date of expiry of the existing certificate;(iii)when the renewal survey is completed more than three months before the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:(1)for a passenger ship,a date not exceeding 12 months from the date of completion of the renewal survey;(2)for a cargo ship,a date not exceeding five years from the date of completion of the renewal survey.问题:The valid period of an Exemption Certificate for Cargo Ship Safety Equipment Certificate shall be ________.A.longer than five yearsB.shorter than five yearsC.longer than 12 monthsD.shorter than 12 monthsWhen the renewal survey is completed within one month before the expiry date of the existing Cargo Ship Safety Construction Certificate,the new certificate shall be valid ________.A.from the date of completion of the renewal survey to a date not exceeding 12 months from the date of expiry of the existing certificateB.from the date of completion of the renewal survey to a date not exceeding five years from the date of expiry of the existing certificateC.from the date of expiry of the existing certificate to a date not exceeding 12 months from the dateD.from the date of expiry of the existing certificate to a date not exceeding five years from the dateIt can be concluded that the actual period of validity of a new Passenger Ship Safety Certificate is less than 12 months if the renewal survey is completed ________.A.4 months before its expiry dateB.3 months before its expiry dateC.2 months before its expiry dateD.after its expiry dateWhen the renewal survey is completed on a date which is 99 days before the expiry date of the existing Cargo Ship Safety Radio Certificate,the new certificate shall be valid ________.A.from the date of completion of the renewal survey to a date not exceeding 12 months from the date of expiry of the existing certificateB.from the date of completion of the renewal survey to a date not exceeding five years from the date of expiry of the existing certificateC.from the date of expiry of the existing certificate to a date not exceeding 12 months from the dateD.from the date of completion of the renewal survey to a date not exceeding five years from that date请帮忙给出每个问题的正确答案和分析,谢谢!

____ just six months ago, Finson’s Grill has quickly become one of the most popular restaurants in Detion.A.OpenedB.Had been openingC.Been openedD.To open

The six points of the People.s Charter were achieved gradually over the period of()although the sixth has never been practical.A1836-1848B1842-1848C1848-1908D1858-1918

The six points of the People.s Charter were achieved gradually over the period of()although the sixth has never been practical.A、1836-1848B、1842-1848C、1848-1908D、1858-1918

The current data center has run out of space. A room that is located next to the existing data center is then used to house two racks containing six servers. Six months later, physical housekeeping is performed as part of a mid-year maintenance plan. Which environmental condition discovered in the room is LEAST critical?()A、 There are discolored ceiling tiles near the middle of the room.B、 Large amounts of dust have accumulated in the corners of the room.C、 The anti-static carpet has been removed resulting in a bare painted concrete floor.D、 A wet pipe water-based sprinkler system has been installed above the racks.

A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()A、Ensure Director Agent is installed on the new servers.B、Ensure a DHCP Sever is installed and configured in the environment.C、Ensure Server Plus Pack option has been installed and configured.D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.

Initially, for the Automatic Workload Repository (AWR) statistics,the retention period is set to 7 days, the collection interval is set to 30 minutes and the collection level is set to Typical in your production database. You have been using the Memory Advisor for the last three months to generate recommendations for tuning memory components. However,when you observe the Memory Advisor on a Friday,you find that the statistics are available only for two days, Thursday and Friday,of that week. What would have caused the statistics to be removed?()A、On Wednesday, the statistics have been purged.B、On Wednesday, the retention period has been set to zero.C、On Wednesday, the collection interval has been set to zero.D、On Wednesday, the collection level has been changed to All.E、On Wednesday, the retention period has been set to one day.F、On Wednesday, the retention period has been set to two daysG、On Wednesday, the collection level has been changed to Typical.H、On Wednesday, the collection interval has been set to 1440 minutes.

单选题Purging air from a hydraulic system is necessary when()Aadding small amounts of oil to the systemBthe system has been overheatedCthe system has been drained and then filled with new oilDthe system has been idle for a long period of time

单选题An International Ship Security Certificate shall be issued for a period specified by the Administration which shall not exceed ()Asix monthsBtwo yearsCfour yearsDfive years

单选题Before starting a reciprocating, steam-driven pump that has been idle for a period of time, you should ().Aopen the steam line mot valveBdrain the steam cylinderCclose the steam cylinder drainsDopen the liquid cylinder drains

单选题The Garbage Record Book, as a part of the ship’s official logbook, shall be kept on board and preserved for a period of ()A3 years after making the first entryB2 years after the last entryC3 months after last entryD3 years after the last entry

单选题View the Exhibit to examine the metrics with a threshold.Which statement is true regarding the Number of Transactions (per second) metric?()A Oracle uses statistical relevance to determine when an adaptive threshold has been breached for the metric.B The statistics for the metric values observed over the baseline time period are not examined to determine threshold values.C Oracle determines when an adaptive threshold has been breached based on the maximum value captured by the baseline.D The total concurrent number of threshold violations, which must occur before an alert is raised for the metric, has been set to zero.

单选题A ship crane which has been idle for a period of over six months shall be inspected to the same standards as a().Ayearly inspectionBquarterly inspectionCmonthly inspectionDweekly inspection

单选题Loss or damage caused by cutting away wreck or parts of the ship which have been previously carried away or are effectively lost by accident shall not be made()as general average.AfirmBsureCgoodDfair

单选题Port of Registry refers to the port where().Athe ship has been namedBthe ship has been builtCthe ship has been signedDthe ship has been registered

单选题Initially, for the Automatic Workload Repository (AWR) statistics,the retention period is set to 7 days, the collection interval is set to 30 minutes and the collection level is set to Typical in your production database. You have been using the Memory Advisor for the last three months to generate recommendations for tuning memory components. However,when you observe the Memory Advisor on a Friday,you find that the statistics are available only for two days, Thursday and Friday,of that week. What would have caused the statistics to be removed?()AOn Wednesday, the statistics have been purged.BOn Wednesday, the retention period has been set to zero.COn Wednesday, the collection interval has been set to zero.DOn Wednesday, the collection level has been changed to All.EOn Wednesday, the retention period has been set to one day.FOn Wednesday, the retention period has been set to two daysGOn Wednesday, the collection level has been changed to Typical.HOn Wednesday, the collection interval has been set to 1440 minutes.

判断题Violence over the next six months will increase despite the successful military operations that had been achieved so far, according to Bremer.A对B错

单选题Which of the following sentences is INCORRECT?AHis father has been dead for six years.BHis father died six years ago.CIt’s six years since his father had died.DIt has been two years since his father’s death.

单选题On a ship,firefighting equipment must be inspected once every().Athree monthsBsix monthsCtwelve monthsDeighteen months

单选题The six points of the People.s Charter were achieved gradually over the period of()although the sixth has never been practical.A1836-1848B1842-1848C1848-1908D1858-1918

单选题Good title to the Goods delivered to the ship shall not pass to the()until full payment for same has been made.AVendorBPurchaserCMasterDShipper