Quality of service is analyzed at which service component within the Cisco Unified Communications plan phase()A、Network Readiness AssessmentB、Application Readiness AssessmentC、Site Readiness AssessmentD、Operation Readiness Assessment

Quality of service is analyzed at which service component within the Cisco Unified Communications plan phase()

  • A、Network Readiness Assessment
  • B、Application Readiness Assessment
  • C、Site Readiness Assessment
  • D、Operation Readiness Assessment

相关考题:

Project tradeoffs are usually made by comparing _____ and constraints.ATime, cost, and qualityBTime, risk, and qualityCRisk, quality, and manpower availabilityDCost, quality, and technical performanceECost, quality, and risk

The key ingredient to a successful quality management program are _____.A . management's quality philosophy, operational quality assurance and operational quality control.B . quality evaluation methods and functional quality integrators.C . technical quality administration, the technical quality specifications, and the quality process review.D . quality evaluation methods, quality progress reviews and the technical quality specifications.E . All of the above.

A proven effective means to insure quality conformance is to:A . delegate accountability to subordinatesB . revise quality specifications to match quality measurementsC . train workers in proper quality methodsD . inspect quality into the productE . make quality a higher priority than cost or schedule

Which of the following statements about the cost of quality are true?A . the cost of quality is the expense of nonconformance to requirements and specifications.B . the cost of quality are mostly the direct responsibility of workers who are manufacturing the product.C . quality control programs should be implemented when the cost of quality are deemed affordable by management.D . A and B.E . A and C

Japanese quality control has improved dramatically in the last 30 years for all of the following reasons except:A . the use of quality circles.B . small, continuous improvements in quality control.C . the use of worker suggestion systems.D . the use of quality control charts.E . focusing quality control efforts on production outputs.

The auditing function that provides feedback about the quality of output is referred to as:A . quality control.B . quality planning.C . quality assurance.D . quality improvementE . All of the above.

● Performing (74) involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.(74)A. quality planningB. quality assuranceC. quality performanceD. quality control

100 The auditing function that provides feedback about the quality of output is referred to as:A. quality control.B. quality planning.C. quality assurance.D. quality improvementE. All of the above

132 A proven effective means to insure quality conformance is to:A. delegate accountability to subordinatesB. revise quality specifications to match quality measurementsC. train workers in proper quality methodsD. inspect quality into the productE. make quality a higher priority than cost or schedule

87 The key ingredient to a successful quality management program are _____.A. management's quality philosophy, operational quality assurance and operational quality control. B. quality evaluation methods and functional quality integrators.C. technical quality administration, the technical quality specifications, and the quality process review. D. quality evaluation methods, quality progress reviews and the technical quality specifications.E. All of the above

质量改进的英文() A.quality managementB.quality management systemC.quality improvementD.quality control

质量保证的英文词汇是( ) A.quantity assuranceB.quality produceC.quality management systemD.quality managementE.quality control

______is the application of planned,systematic quality activities to ensure that the project will employ all processes needed to meet requirements.A.euality assurance(QA)B.Quality planningC.Quality control(QC)D.Quality costs

Performing( )involves monitoring specific project results to determine ifthey comply with relevant quality standards and identifying ways to eliminate causes ofunsatisfactory results。 A.quality planning B.quality assurance C.quality performance D.quality control

● ()is the application ion of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.()A. Quality assurance (QA) B. Quality planningC. Quality control (QC) D. Quality costs

Performing(74)involves monitoring specific project results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results.A.quality planningB.quality assuranceC.quality performanceD.quality control

Which of the following is not part of the quality assurance process?(73)A.Operational definitionsB.Quality policyC.Quality auditsD.Quality improvement

Quality management ensures that an organization , It has foor main components; quality planning,quality assurance. Quality control and quality ( )A.improvementB.changeC.spiralD.evolution

()seeks to build confidence that a future output or an unfinished output, will be completed in a manner that meets the specified requirements and expectations.A.Quality assuranceB.Quality planC.Quality controlD.Quality metrics

下列组合正确的是A.质量管理——quality controlB.质量管理——quality managementC.质量管理——quality assuranceD.质量管理——quality circleE.质量管理——total quality management

Quality management ensures that an organization,product or service is (1).It has four main components:quality planning,quality assurance,quality control and quality (2).A.guaranteedB.sustainC.goodD.consistent@@@SXB@@@A.improvementB.changeC.spiralD.evolution

The seven basic quality tools are used within in the context of the PDCA Cycle to solve quality-related problems.These tools are used in()in the following processes.A.plan quality managementB.perform quality assuranceC.perform quality controlD.perform quality improvement

● Which of the following is not part of the quality assurance process?(73)(73)A.Operational definitionsB.Quality policyC.Quality auditsD.Quality improvement

下列组合正确的是A.质量管理——quality controlB.质量管理——quality management 下列组合正确的是A.质量管理——quality controlB.质量管理——quality managementC.质量管理——quality assumnceD.质量管理——quality circleE.质量管理——total quality management

Quality?mangement ensures that an organization,product or service is consitent.It has four main components;quality planing,quality assurance( )and quatily improvenment.A.quality obiectiveB.quality policyC.quality controlD.quality system

( )The process of translating the quality management plan into eecutable quality activities that incorporate the organization's quality policies into the project.A:Munage qualityB:Quality auditC:Quality metricsD:Quality improvement

( )seeks to buildconfidence that a future output or an unfinished output, will be completed in amanner that meets the specified requirements and expectations. A.Quality assurance B.Quality plan C.Quality control D.Quality metrics

单选题下列组合正确的是(  )。A质量管理—quality controlB质量管理—quality managementC质量管理—quality assuranceD质量管理—quality circleE质量管理—total quality management