116 Using the diagram in the Special window, what is the probability that Alternative I will be adopted and completed below budget:A. 1.4B. 0.8C. 0.2D. 0.12E. None of the above

116 Using the diagram in the Special window, what is the probability that Alternative I will be adopted and completed below budget:

A. 1.4

B. 0.8

C. 0.2

D. 0.12

E. None of the above


相关考题:

Using the WBS in the Special window, an instance of a work package is:A.Build houseB.ExcavateC.Prepare FoundationD.B and CE.None of the above

Using the situation stated in the Special window, what is the total variable costs for producing one widget?A . ¥1,020B . ¥1,010C . ¥1,015D . ¥20E . None of the above.

Using the situation stated in the Special window, a comparison of the cost schedule of August as compared to July shows that the magnitude ($ value) of the variance has _____ and the percentage change has _____.A . Become worse, become worseB . Become worse, improvedC . Improved, increasedD . Improved, become worseE . None of the above are correct

Using the situation stated in the Special window, WBS Element Q is _____ budget by _____ percent.A . Over, 16.66B . Under, 16.66C . Over, 10.0D . Under, 10.0E . None of the above.

Using the situation stated in the Special window, which WBS element has a favorable cost variance of $150?A . Element PB . Element QC . Element RD . Element SE . None of the above.

Using the situation stated in the Special window, which WBS element is behind schedule but under budget?A . Element PB . Element QC . Element RD . Element SE None of the above.

Using the situation stated in the Special window, what is the cost performance index for Case #9?A . 1.1B . 1.91C . 0.83D . 1.2E . None of the above

Using the figure in the Special Window, what is the probability of success for Project B?A 0.3B 0.2C 0.35D 0.15E 0.12

Using the diagram in the Special window, what is the probability that Alternative I will be adopted and completed below budget:A 1.4B 0.8C 0.2D 0.12E None of the above

Using the possible loss outcomes shown in the Special window, find the expected (loss)A ¥0B ¥-1,300C ¥-2,000D ¥-3,000E None of the above

Using the possible profit and loss outcomes shown in the Special window, find the expected profit (loss)A ¥-1,000B ¥1,000C ¥2,000D ¥1,200E None of the above

101 Using the situation stated in the Special window, which WBS element is behind schedule but under budget?A. Element PB. Element QC. Element RD. Element SE. None of the above

102 Using the situation stated in the Special window, which WBS element has a favorable cost variance of $150?A. Element PB. Element QC. Element RD. Element SE. None of the above

106 Using the situation stated in the Special window, a comparison of the cost schedule of August as compared to July shows that the magnitude ($ value) of the variance has _____ and the percentage change has _____.A. Become worse, become worseB. Become worse, improvedC. Improved, increasedD. Improved, become worseE. None of the above are correct

113 Using the possible profit and loss outcomes shown in the Special window, find the expected profit (loss)A. ($1000)B. $1000C. $2000D. $1200E. None of the above

115 Using the possible loss outcomes shown in the Special window, find the expected (loss)A. $0B. ($1300)C. ($2000)D. ($ 3000)E. None of the above

118 Using the figure in the Special Window, what is the probability of success for Project B?A. 0.30B. 0.20C. 0.35D. 0.15E. 0.12

121 Using the WBS in the Special window, an instance of a work package is:A. Build houseB. ExcavateC. Prepare FoundationD. B and CE. None of the above

124 Using the situation stated in the Special window, what is the total variable costs for producing one widget?A. $1,020B. $1,010C. $1,015D. $20.00E. None of the above

131 Using the table in the Special window, Which task is completed?A. dig holeB. remove debrisC. surveyD. set formsE. place concrete

132 Using the situation stated in the Special window, what is the cost performance index for Case #9?A. 1.10B. 1.91C. 0.83D. 1.20E. None of the above

133 Using the WBS shown in the Special window, a typical work package would be:A. Software developmentB. Systems designC. CodingD. A, B, and CE. None of the above

198 Using the diagram in the Special window, what is the probability that Alternative I will be adopted and completed below budget:A. 1.4B. 0.8C. 0.2D. 0.12E. None of the above

200 Using the figure in the Special Window, what is the probability of success for Project B?A. 0.30B. 0.20C. 0.35D.0.15E.0.12

● Using the WBS shown in the Special window, a typical work package would be:A Software developmentB Systems designC CodingD A, B, and CE None of the above.

● Using the table in the Special window, Which task is completed?A dig holeB remove debrisC surveyD set formsE place concrete

● Using the WBS in the Special window, an instance of a work package is:A Build houseB ExcavateC Prepare FoundationD B and CE None of the above