120 The Work Breakdown Structure (WBS) is the basis for communicating:A. Project scope, cost control, schedule, qualityB. Project objectives, dependencies, plan, cost controlC. Project scope, schedule, staffing, cost controlD. Project scope, quality, schedule, dependenciesE. Project budget, schedule, risk factors, work assignments

120 The Work Breakdown Structure (WBS) is the basis for communicating:

A. Project scope, cost control, schedule, quality

B. Project objectives, dependencies, plan, cost control

C. Project scope, schedule, staffing, cost control

D. Project scope, quality, schedule, dependencies

E. Project budget, schedule, risk factors, work assignments


相关考题:

Things made of glass, plastic and tin are ______ hard ______ break down. A.very, toB.too, as toC.too, toD.so, to

DHCP的SCOPE分为哪几种() A.标准SCOPE用于分配A.B.C三类的IPB.标准SCOPE用于分配A.B.C.D.E五类的IPC.多播SCOPE用于分配D类IPD.超级SCOPE用于扩充分配IP地址的范围

A) outsetB) outbreakC) breakthroughD) breakdown

在HTML文件中,( )标记在页面中显示work为斜体字。A.<pre>work</pre>B.<u>work</u>C.<i>work</i>D.<b>work</b>

Validate Scope is the process?of?formalizing?acceptance?of the?Complete()。A.project?deliverablesB.WBSC.activitiesD.milestones

【单选题】微信小程序中要获得用户位置权限是否允许的参数是?A.scope.authSettingB.authSetting.userLocationC.scope.getLocationD.scope.userLocation

20、Flex项目布局中,()属性是flex-grow, flex-shrink 和 flex-basis的简写,默认值为0 1 auto。A.flexB.flex-growC.flex-shrinkD.flex-basis

文化产业项目工作分解结构(work_breakdown_structure,WBS)是文化产业项目范围定义中给出的项目工作范围的描述文件。

33、Flex项目布局中,()属性是flex-grow, flex-shrink 和 flex-basis的简写,默认值为0 1 auto。A.flexB.flex-growC.flex-shrinkD.flex-basis

4. 我在公园义务教太极拳。(on a …basis)