Which of the following areas are addressed in risk identification:A environmentalB technicalC legalD All of the above.E A and B only

Which of the following areas are addressed in risk identification:

A environmental

B technical

C legal

D All of the above.

E A and B only


相关考题:

When a project manager is running over the budgeted costs, the project manager can typically _____ to attempt to get the project back on budget.A . Reduce features and/or functionalityB . Increase risk.C . Incur a schedule slippage (to obtain more favorable pricing due to lengthened delivery times)D . All of the above.E . A and B only

Which of the following would most likely increase the accuracy of estimating the project cost?A . Pricing out the work at lower levels in the work breakdown structure.B . Using historical data.C . Talking to people who have worked on similar projects.D . All of the above.E . A and C only.

In acceptance sampling, if the sample size is kept the same but the acceptance number is increased, which of the following will be true:A . buyer's risk will decreaseB . vendor's risk will decreaseC . producer's risk will decreaseD . consumer's risk will increaseE . C and D only

Formal written communication is mandated for which of the following?A scope changes not part of the original projectB taking exception to a specificationC procurement of raw materialsD All of the above.E A and B only

Project Risk Management is based on which of the following premises:A the future is unknown.B unknowns can result in risks or opportunities.C we cannot control risk events.D project risk impact can be measured and controlledE All of the above.

Risk mitigation includes all but which of the following:A Developing system (policies, procedures, responsibilities)B Obtaining insurance against lossC performing contingent planningD developing planning alternativesE identification of project risks.

Which of the following does not contribute to increased Schedule Risk?A labor shortageB contractor claimsC lack of accessD sponsor scope changesE all may increase schedule risk

Risk mitigation involves all but which of the following:A developing system standards (policies, procedure, responsibility standards)B obtaining insurance against lossC identification of project risksD performing contingent planningE developing planning alternatives

Which of the following activities can be considered as part of risk mitigationA risk identificationB purchasing insuranceC assessment of outcomesD assessment of probabilitiesE C and D only

Which of the following utility functions reflects risk-aversion:A uniformB increasingC decreasingD exponentialE B and D only

Which of the following is most closely associated with pure risk:A profit and lossB personnel turnoverC insuranceD market fluctuationsE A and D only

Which of the following is most closely associated with business risk:A profit and lossB personnel turnoverC workmen's compensationD liability insuranceE All of the above.

Which of the following is equivalent to a lump sum contract:A fixed price contractB price fixing contractC purchase orderD All of the above.E B and C only

Which of the following are part of the purchasing cycle:A define needB prepare and issue purchase orderC inspect incoming goodsD All of the above.E A and B only

Standard of purchased material:A Simplifies inventory controlB reduces the risk of obsolescenceC reduces cost of purchasing and storageD All of the above.E A and C only.

162 Which of the following utility functions reflects risk-aversion:A. uniform.B. increasingC. decreasingD. exponentialE. B and D only

184 Which of the following activities can be considered as part of risk mitigationA. risk identificationB. purchasing insuranceC. assessment of outcomesD. assessment of probabilitiesE. C and D only

36 Which of the following areas are addressed in risk identification:A. environmentalB. technicalC. legalD. All of the above.E. A and B only

113 Risk mitigation involves all but which of the following:A. developing system standards (policies, procedure, responsibility standards)B. obtaining insurance against lossC. identification of project risksD. performing contingent planningE. developing planning alternatives

125 Which of the following does not contribute to increased Schedule Risk?A. labor shortageB. contractor claimsC. lack of accessD. sponsor scope changesE. all may increase schedule risk

166 Risk mitigation includes all but which of the following:A. Developing system (policies, procedures, responsibilities)B. Obtaining insurance against lossC. performing contingent planningD. developing planning alternativesE. identification of project risks

15 Which of the following is most closely associated with pure risk:A. profit and lossB. personnel turnoverC. insuranceD. market fluctuationsE. A and D only

14 In acceptance sampling, if the sample size is kept the same but the acceptance number is increased, which of the following will be true:A. buyer's risk will decreaseB. vendor's risk will decreaseC. producer's risk will decreaseD. consumer's risk will increaseE. C and D only

● Creation of project objectives:A allows for data collection and analysis and progress reporting against which standards of performance can be measured.B is accomplished by selection of measurable variables against which performance can be judged.C is required before funding of the project by the project sponsor.D all of the above.E A and B only

● Which of the following can affect network durations?A Skills of the resource poolB Calendar datesC ConstraintsD All of the aboveE A and B only

● The critical path in a network is the path that:A Has the greatest degree of risk.B Will elongate the project if the activities on this path take longer than anticipated.C Must be completed before all other paths.D All of the above.E A and B only.

Concerning the identification signal for a pilot vessel, in fog, which statement is TRUE?___.A.When at anchor, the pilot vessel is only required to sound anchor signalsB.The identification signal must be sounded any time the pilot vessel is underwayC.The pilot vessel may only sound the identity signal when making wayD.All of the above