单选题Which is a license scope option when managing activations for an IBM System Storage DS8100using the IBM Disk Storage Feature Activation (DSFA) application?()AOperating environmentBParallel access volumesCPoint-in-time copyDCount Key Data

单选题
Which is a license scope option when managing activations for an IBM System Storage DS8100using the IBM Disk Storage Feature Activation (DSFA) application?()
A

Operating environment

B

Parallel access volumes

C

Point-in-time copy

D

Count Key Data


参考解析

解析: 暂无解析

相关考题:

Which of the following is not a scope management process?A . InitiationB . Scope planningC . Scope DefinitionD . Scope change controlE . Scope verification

In which of the following scope management processes is the scope management plan prepared?A . InitiationB . Scope planningC . Scope DefinitionD . Scope change controlE . Scope verification

The project charter is prepared in which scope management process?A . InitiationB . Scope planningC . Scope DefinitionD . Scope change controlE . Scope verification

The work breakdown structure (WBS) is first developed in which scope management process?A . InitiationB . Scope planningC . Scope change controlD . Scope DefinitionE . Scope verification

In which of the following scope management processes are subject matter experts used?A . InitiationB . Scope planningC . Scope DefinitionD . Scope change controlE . Scope verification

Scope Management:A.entails managing the project's work content.B.is a subset of configuration management and as such is performed by CM specialists.C.is concerned with naming all activities performed, the end products which results and the resources consumed.D.is not a concern of the project manager.E.None of the above.

143 In which of the following scope management processes is the scope management plan prepared?A. InitiationB. Scope planningC. Scope DefinitionD. Scope change controlE. Scope verification

144 Which of the following is not a scope management process?A. InitiationB. Scope planningC. Scope DefinitionD. Scope change controlE. Scope verification

● Scope Management:A entails managing the project's work content.B is a subset of configuration management and as such is performed by CM specialists.C is concerned with naming all activities performed, the end products which results and the resources consumed.D is not a concern of the project manager.E None of the above.

Which statement describes the UTM licensing model?() A. Install the license key and all UTM features will be enabled for the life of the productB. Install one license key per feature and the license key will be enabled for the life of the product.C. Install one UTM license key, which will activate all UTM features; the license will need to be renewed when it expires.D. Install one UTM license key per UTM feature; the licenses will need to be renewed when they expire.

When using UTM features in an HA cluster, which statement is true for installing the licenses on the cluster members?() A. One UTM cluster license will activate UTM features on both members.B. Each device will need a UTM license generated for its serial number.C. Each device will need a UTM license generated for the cluster, but licenses can be applied to either member.D. HA clustering automatically comes with UTM licensing, no additional actions are needed.

Which of the following is a situation where dual (redundant) HMCs are recommended?() A.When managing more than four VIO servers.B.When installed with Power 570 and larger hardware.C.When hosting both Linux and AIX on the same physical hardware.D.When unexpected outage on a single HMC would prove an untenable risk for the hosted LPARs.

When running a Windows server, which option is used with the ping command to convert numerical addresses to host names?()A、 -rB、 -aC、 -vD、 -n

When running a Windows server, which option is used with the ping command to define the number of packets transmitted?()A、 -nB、 -aC、 -rD、 -v

Which of the following is a situation where dual (redundant) HMCs are recommended()? A、When managing more than four VIO servers.B、When installed with Power 570 and larger hardware.C、When hosting both Linux and AIX on the same physical hardware.D、When unexpected outage on a single HMC would prove an untenable risk for the hosted LPARs.

Which statement describes the UTM licensing model?()A、Install the license key and all UTM features will be enabled for the life of the productB、Install one license key per feature and the license key will be enabled for the life of the product.C、Install one UTM license key, which will activate all UTM features; the license will need to be renewed when it expires.D、Install one UTM license key per UTM feature; the licenses will need to be renewed when they expire.

You are managing the Oracle database. Which of the following choices correctly identifies when Oracle reads the contents of the init.ora file?()A、When the instance is started B、When the database is mounted C、When the database is opened D、When the database is closed

Which of the following describes an aspect of the SVC for XIV offering?()A、SVC software that comes integrated in an XIV system B、SVC option that includes all functions of SVC at a 'per TB' charge C、SVC option that introduces a 'per enclosure' charge metric for all functions of SVC D、separate license available for XIV/SVC customers who need FlashCopy and Metro Mirror/Global Mirror functions

单选题Which is a license scope option when managing activations for an IBM System Storage DS8100using the IBM Disk Storage Feature Activation (DSFA) application?()AOperating environmentBParallel access volumesCPoint-in-time copyDCount Key Data

单选题When running a Windows server, which option is used with the ping command to convert numerical addresses to host names?()A-rB-aC-vD-n

单选题Which of the following is the encryption algorithm used for priv option when using SNMPv3?()AHMAC-SHABHMAC-MD5CCBC-DESDAESE3DES

多选题Which of the following statements about variables and scope are true?()ALocal variables defined inside a method are destroyed when the method is exited.BLocal variables are also called automatic variables.CVariables defined outside a method are created when the object is constructed.DA method parameter variable continues to exist for as long as the object is needed in which the method is defined.

单选题Which feature is enabled when you start a WebLogic server with the ¨CDserverType=wlx option?()AJDBCBJCACJMSDEJBEJava EE

单选题When running a Windows server, which option is used with the ping command to define the number of packets transmitted?()A -nB -aC -rD -v

单选题When using UTM features in an HA cluster, which statement is true for installing the licenses on the cluster members?()AOne UTM cluster license will activate UTM features on both members.BEach device will need a UTM license generated for its serial number.CEach device will need a UTM license generated for the cluster, but licenses can be applied to either member.DHA clustering automatically comes with UTM licensing, no additional actions are needed.

单选题When received the order "finished with engine" which of the following operations is wrong?()Astop the LO pump, SW pump, FW pumpBstop the priming FO transfer pumpCengage the turning gearDopen the scavenge air belts drain valve and cover the turbocharger silencer with the dustproof cover

单选题When anchoring a vessel under normal conditions,which scope of chain is recommended? ()AFour times the depth of waterBTwo and one-half times the depth of waterCFive to seven times the depth of waterDFifteen times the depth of water

单选题When running a Windows server, which option is used with the ping command to convert numerical addresses to host names?()A -rB -aC -vD -n