单选题A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
单选题
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
A
Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
B
Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
C
Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
D
Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
参考解析
解析:
暂无解析
相关考题:
A healthcare provider has two applications that they need to redundantly protect in a SAN environment. Their patient record application runs on Oracle 11i and consists of many small, randomly accessed files. The database is kept on three clustered Sun servers and currently uses 30 TB of data space. Their imaging application that retains and manages x-rays, consists of Filenet, CommonStore, and TSM running on an IBM Power750 server, and is currently using 65 TB of data space. Which of the following disk solutions meets the customer’s requirement()A、IBM System Storage DS8700 2 wayB、IBM System Storage DCS9900C、IBM System Storage DS8700 4 wayD、IBM XIV Storage System
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()A、ITSO RedbooksB、Facts and FeaturesC、System Planning ToolD、Fix Level Recommendation Tool
An SMB customer is looking for a low cost, easy to install and configure, entry-level SAN solution to attach to five rack-mounted System x Servers. Which storage solution would be best for this customer?()A、EXP3000 Local Attached Storage EnclosuresB、DS4000 Series storage solutionC、DS3000 Series Storage solutionD、DS4800 Storage Solution
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()A、An IBM BladeCenter H chassis for the JS22 Blade serversB、A concurrent KVM daughter cardC、A pair of IBM BladeCenter Power SuppliesD、A second Management Module
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()A、e-ConfigB、System Planning Tool (SPT)C、IBM Workload Estimator (WLE)D、IBM Performance Monitor (PM)
Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()A、POWER5 runs in an SMP mode as defaultB、POWER5 can run in a full system mode the same as the p690C、POWER5 can run in full system mode with the purchase of PLMD、POWER5 can run in a full system mode, but it is in LPAR mode
A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()A、Dual power supplies.B、Twice the amount of disk.C、Two dual-port LHEA adapters.D、Two dual-port fibre channel adapters.
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A、 vmstat and iostat data from the older machines B、 The number of CPUs that were installed in the original machines C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) D、 Performance data that is collected from the new system after it has been put into production
A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility. Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()A、 PowerVM Standard Edition on POWER6 hardwareB、 PowerVM Standard Edition with POWER5 hardware C、 PowerVM Enterprise Edition with POWER6 hardwareD、 PowerVM Enterprise Edition with POWER5 hardware
A customer has a new Power 720 with PowerVM Standard Edition. They plan to migrate their single-partition POWER5 550 to the new Power 720. How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()A、Perform Live Partition Mobility between the two systems.B、Move the boot disks from the old system to the new system.C、Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.D、Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.
A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()A、Power 710B、Power 720C、Power 730D、Power 740
A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()A、 Pre-sale B、 Post-sale C、 Pre-install D、 Post-install
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()A、Direct the customer to the Installation Guide for each system to identify the power requirements.B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing. This system does not require an HMC.
A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()A、The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.B、The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.C、The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.D、The POWER5 system supports more partitions and has the lowest partitioning overhead.
A customer RFP requires installation of an open system SAN and migration of 40 TB currently residing on ten UNIX servers (on internal server disk). The Service Level Agreement (SLA) requires no more than five minutes per week of planned downtime for backup. Which IBM System Storage solution is the most cost effective()A、an IBM System Storage DS8700 with LTO tape driveB、an IBM System Storage DS8700 with FlashCopy ManagerC、an IBM XIV Storage SystemD、an IBM XIV Storage System with SAN Volume Controller
单选题A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()AAn IBM BladeCenter H chassis for the JS22 Blade serversBA concurrent KVM daughter cardCA pair of IBM BladeCenter Power SuppliesDA second Management Module
单选题A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()A Pre-sale B Post-sale C Pre-install D Post-install
单选题Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()APOWER5 runs in an SMP mode as defaultBPOWER5 can run in a full system mode the same as the p690CPOWER5 can run in full system mode with the purchase of PLMDPOWER5 can run in a full system mode, but it is in LPAR mode
单选题A customer has two Power 770 systems with 4 enclosures each. Thirty two cores and 1TB of memory are activated on each system. Each system has 3 database partitions and each partition has 10 cores and 300GB of memory. Which solution will provide automated recovery of unplanned outages at least cost?()APurchase PowerVM Enterprise Edition.Use System Director to automate Live Partition Mobility to recover from partition failureBCreate additional shared processor partitions as standby nodes.Use PowerHA SystemMirror to activate and use CoD resources when a failover occursCPurchase an additional 32-core Power 750 with PowerHA SystemMirror Standard Edition.Use the new system as standby node with the XD component of PowerHADPurchase an additional Power 770 system.Locate production and standby database partitions on each system.Use DB2 pureScale to provide automated partition monitoring and failover
单选题An industrial sector customer has requested an IBM System x3755 for a high performance computing application. Pricing is the most sensitive decision factor for this customer. They are looking for an entry-level storage solution because the application needs to access about 12 TB of data, with an expected future growth of 10-15 percent. As this is the only server accessing this amount of data, the customer does not want to have a SAN. What should the System x Sales Specialist recommend? ()ADS3300 iSCSI-based solutionBOne MegaRAID 8480 card with four EXP3000 unitsCDS4000 Fibre Channel solution with EXP810 expansion unitsDDS3400 Fibre Channel solutionWArialZ
单选题A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()AThe POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.BThe POWER5 system supports more partitions, processors, and memory than any competitor’s solution.CThe POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.DThe POWER5 system supports more partitions and has the lowest partitioning overhead.
单选题A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()Ae-ConfigBSystem Planning Tool (SPT)CIBM Workload Estimator (WLE)DIBM Performance Monitor (PM)
单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()AExplain to the customer that they need an additional HMC for the POWER5 system.BObtain a PO from the customer to purchase additional serial connections to the HMC.CObtain a PO from the customer to purchase additional Ethernet connections to the HMC.DExplain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
单选题A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A vmstat and iostat data from the older machines B The number of CPUs that were installed in the original machines C Data from Workload Estimator (WLE) and IBM Performance Management (PM) D Performance data that is collected from the new system after it has been put into production
单选题A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()AITSO RedbooksBFacts and FeaturesCSystem Planning ToolDFix Level Recommendation Tool