单选题Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()APOWER5 runs in an SMP mode as defaultBPOWER5 can run in a full system mode the same as the p690CPOWER5 can run in full system mode with the purchase of PLMDPOWER5 can run in a full system mode, but it is in LPAR mode
单选题
Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()
A
POWER5 runs in an SMP mode as default
B
POWER5 can run in a full system mode the same as the p690
C
POWER5 can run in full system mode with the purchase of PLM
D
POWER5 can run in a full system mode, but it is in LPAR mode
参考解析
解析:
暂无解析
相关考题:
Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition, the customer was told that there are certain limitations that must be observed. What are these limitations?()A、When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware. B、V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions. C、When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions. D、V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.
Companycom has a p690 and currently has eight LPARs. They have purchased a p5 590 and wish to migrate their eight LPARs to the new server. The LPARs are running either AIX 5.2 or AIX 5.3 with the current maintenance. What is the LEAST disruptive method for this activity?()A、New install of AIXB、Migrate the 7040-61DC、Utilize alt_disk_installD、Use the enterprise back up strategy
Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A、Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB、Use DLPAR to move resources from the test LPAR to training when training is activeC、Install Partition Load Manager to share resources between the test and training environmentsD、Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
After using the alt_disk_install command to clone a system image to another disk, the system administrator noticed a large number of defined devices not allocated to the LPAR. Which of the following is the most likely cause of this situation?()A、The cfgmgr command was not run to reconfigure the devicesB、The machine was not booted into SMS MultiBoot mode after configurationC、The machine was not in full system partition mode when the volume was createdD、The alt_disk_install command was not run with the -O option to remove references in the ODM
Companycom has just added some new disk drives to a p5 590. The customer needs to know the largest Logical Track Group that these drives will support. What is the best way to locate this information?()A、Use lquerypv to read the driveB、Use lspv and look at PP Size valueC、Look on the outside of the drive itselfD、Use bootinfo to find the LTG on the drive
Companycom has seven days of vmstat data on a p5 590. The server has a total of four test/dev LPARs and 4 production LPARs of one processor each. On the four test/dev LPARs, the data shows 90-95% peak utilizations with a duration of from 5 to 10 minutes. The average utilizations of all LPARs were between 15-30%. All of the applications have different times when they peak. What is the best configuration to fully utilize the processor resource?()A、Set up the server in SMP mode and use WLM to manage resources effectivelyB、Set up eight dedicated LPARs and use DLPAR to manage resources effectivelyC、Set up a shared pool with eight capped LPARs including production and test/devD、Set up a shared pool with eight uncapped LPARs with priority weight to Production
Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()A、POWER5 runs in an SMP mode as defaultB、POWER5 can run in a full system mode the same as the p690C、POWER5 can run in full system mode with the purchase of PLMD、POWER5 can run in a full system mode, but it is in LPAR mode
A solution for two batch applications was proposed in Companycom meeting. They are currently running in two LPARs on a p690. On a daily basis, both applications use 15% of the machine for their workload, and increase to 100% when their weekly reports are run. Since the reports are not run on the same day, what is the best solution?()A、CODB、DLPARC、One big LPARD、Two separate p690 machines
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()A、Upgrade the p690 to a p5 590 server running AIX 5.3B、Upgrade the p690 server to AIX 5.3 and implement Advanced Power VirtualizationC、Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adaptersD、Purchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization
Companycom has just installed a p5 595 with four uncapped LPARs in a shared processor pool. The system and profile settings are still in their default states. One of the LPARs has an application that is consuming all of the available shared processor resources. Users of this application are complaining about response time. Which of the following changes to the slow LPAR would improve response time?()A、Enable SMTB、Reduce the weightC、Renice the processD、Increase the weight
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()A、Assign the adapter to an IO Hosting partitionB、Use AIX 5L affinity to move the application from SUSE to AIXC、Use AIX 5.3 drivers to install the adapter in the Linux LPARD、Assign the adapter to an AIX 5.3 partition running Linux Affinity
单选题Companycom purchased a new p5 570 without a HMC. The customer does not know how to power the full frame/system off since there does not appear to be an on/off button. What can be done to accomplish this task?()ATelnet into the machine and do a shutdown -FrBLog into ASMI as Administrator and use ASMI menusCLog into the service processor using WebSM and use ASMI menusDUse the off button which is located to the left below the LEDs
单选题Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition, the customer was told that there are certain limitations that must be observed. What are these limitations?()AWhen the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware. BV5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions. CWhen the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions. DV5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.
单选题Companycom has seven days of vmstat data on a p5 590. The server has a total of four test/dev LPARs and 4 production LPARs of one processor each. On the four test/dev LPARs, the data shows 90-95% peak utilizations with a duration of from 5 to 10 minutes. The average utilizations of all LPARs were between 15-30%. All of the applications have different times when they peak. What is the best configuration to fully utilize the processor resource?()ASet up the server in SMP mode and use WLM to manage resources effectivelyBSet up eight dedicated LPARs and use DLPAR to manage resources effectivelyCSet up a shared pool with eight capped LPARs including production and test/devDSet up a shared pool with eight uncapped LPARs with priority weight to Production
单选题After using the alt_disk_install command to clone a system image to another disk, the system administrator noticed a large number of defined devices not allocated to the LPAR. Which of the following is the most likely cause of this situation?()AThe cfgmgr command was not run to reconfigure the devicesBThe machine was not booted into SMS MultiBoot mode after configurationCThe machine was not in full system partition mode when the volume was createdDThe alt_disk_install command was not run with the -O option to remove references in the ODM
单选题Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()AAssign the adapter to an IO Hosting partitionBUse AIX 5L affinity to move the application from SUSE to AIXCUse AIX 5.3 drivers to install the adapter in the Linux LPARDAssign the adapter to an AIX 5.3 partition running Linux Affinity
单选题Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()AUpgrade the p690 to a p5 590 server running AIX 5.3BUpgrade the p690 server to AIX 5.3 and implement Advanced Power VirtualizationCPurchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adaptersDPurchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization
单选题Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()APOWER5 runs in an SMP mode as defaultBPOWER5 can run in a full system mode the same as the p690CPOWER5 can run in full system mode with the purchase of PLMDPOWER5 can run in a full system mode, but it is in LPAR mode
单选题A solution for two batch applications was proposed in Companycom meeting. They are currently running in two LPARs on a p690. On a daily basis, both applications use 15% of the machine for their workload, and increase to 100% when their weekly reports are run. Since the reports are not run on the same day, what is the best solution?()ACODBDLPARCOne big LPARDTwo separate p690 machines
单选题Company.com has a single pSeries server with two shared processor logical partitions. The first partition has peak resource requirements during weekdays. The second partition has peak resource requirements during weekends. During the peak times, the total workload between the partitions does NOT exceed the capacity of the server. However, the partitions are not able to utilize the full capacity of the system during peak times, because the necessary CPU and memory resources are not always allocated to the busiest partition. Which of the following options would best balance these resources?()AConfigure AIX Workload ManagerBConfigure Partition Load ManagerCConfigure eServer Workload ManagerDUse DLPAR from the HMC
单选题A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
单选题Companycom has just added some new disk drives to a p5 590. The customer needs to know the largest Logical Track Group that these drives will support. What is the best way to locate this information?()AUse lquerypv to read the driveBUse lspv and look at PP Size valueCLook on the outside of the drive itselfDUse bootinfo to find the LTG on the drive
单选题Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()APOWER5 runs in an SMP mode as defaultBPOWER5 can run in a full system mode the same as the p690CPOWER5 can run in full system mode with the purchase of PLMDPOWER5 can run in a full system mode, but it is in LPAR mode
单选题Companycom has just installed a p5 595 with four uncapped LPARs in a shared processor pool. The system and profile settings are still in their default states. One of the LPARs has an application that is consuming all of the available shared processor resources. Users of this application are complaining about response time. Which of the following changes to the slow LPAR would improve response time?()AEnable SMTBReduce the weightCRenice the processDIncrease the weight
单选题A client has an existing Logical Partition (LPAR) on a p650 running AIX 5.2 and will be porting this LPAR to a p5 590. A mksysb has been run to tape, and a compatible tape drive is available and allocated to the target LPAR on the p5 590. What additional resource needs to be available on the p5 590?()AA CD or DVD with installation mediaBAn internal SCSI adapter in the target LPARCAn Ethernet adapter for access to an FTP serverDAdvanced Power Virtualization feature of the p5 590
单选题After using the alt_disk_install command to clone a system image to another disk, the system administrator noticed a large number of defined devices not allocated to the LPAR. Which of the following is the most likely cause of this situation?()AThe cfgmgr command was not run to reconfigure the devicesBThe machine was not booted into SMS MultiBoot mode after configurationCThe machine was not in full system partition mode when the volume was createdDThe alt_disk_install command was not run with the -O option to remove references in the ODM
单选题Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()AUse AIX 5.3 which supports micro-partitioning for both the test and training LPARSBUse DLPAR to move resources from the test LPAR to training when training is activeCInstall Partition Load Manager to share resources between the test and training environmentsDInstall Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs