单选题The hull is divided up into a number of watertight compartments by().Ainner bottom plating and longitudinalsBdecks and bulkheadsCdouble bottom girdersDtopside and hopper tank sloping plating and longitudinals

单选题
The hull is divided up into a number of watertight compartments by().
A

inner bottom plating and longitudinals

B

decks and bulkheads

C

double bottom girders

D

topside and hopper tank sloping plating and longitudinals


参考解析

解析: 暂无解析

相关考题:

Risk event probability is defined as:A the total number of possible events divided into the expectations or frequency of the risk eventB the number of times the risk event may occurC the fraction of the total project tasks which may be affected by the risk eventD the total number of possible events divided into the consequences of the risk event.E A and B

144 Risk event probability is defined as:A. the total number of possible events divided into the expectations or frequency of the risk eventB. the number of times the risk event may occurC. the fraction of the total project tasks which may be affected by the risk eventD. the total number of possible events divided into the consequences of the risk event.E. A and B

---- I' m surprised to hear that Sue and Paul have __ .----So am I. They seemed very happy together when I last saw them.A. broken up B. finished up C. divided up closed up

A tug is to assist in docking an oceangoing vessel on a hawser. The greatest danger to the tug is ______.A.from the ship's propeller when making up aftB.from being overrun if making up forwardC.hull damage while alongside passing a hawserD.getting in a tripping position

To predict the actual depth of water using the Tide Tables,the number obtained from the Tide Tables is ______.A.the actual depthB.added to or subtracted from the charted depthC.multiplied by the charted depthD.divided by the charted depth

In vessel construction,a greater number of watertight bulkheads results in ______.A.increased capacity to set flooding boundariesB.decreased capacity to set flooding boundariesC.reduced compartmentationD.greater deck load capacity

The hull is divided up into a number of watertight compartments by ______.A.inner bottom plating and longitudinalsB.decks and bulkheadsC.double bottom girdersD.topside and hopper tank sloping plating and longitudinals

The emphasis of the product perspective on grammar is on the component parts of the language system, divided up into separate forms. Each form is the()of the grammarian’s analysis.

EIGRP has been configured to opera te over Frame Relay multipoint connections. What should the bandwidth command be set to?()A、the CIR rate of the lowest speed connection multiplied by the number of circuitsB、the CIR rate of the lowest speed connectionC、the CIR rate of the highest s peed connectionD、the sum of all the CIRs divided by the number of connections

For painting, the surface of a ship’s hull is divided into ()areas.A、twoB、threeC、fourD、five

The hull is divided by decks and ()(舱壁).A、holdsB、tanksC、bulkheadsD、hatches

船体被甲板和舱壁分隔。()A、The hull is divided by decks and bulwarks.B、The hull is divided by decks and bulkheads.C、The hull is divided by engine room and bulkheads.D、The hull is divided by decks and holds.

船体被划分为一系列水密隔舱。()A、The hull is divided into a number of watertight compartments.B、The hull is divided into a number of gastight compartments.C、The hull is divided into a number of water compartments.D、The hull is divided into a number of tight compartments.

船舶由船体和上层建筑组成。()A、A vessel is made up of the hull and the superstructure.B、A vessel is made up of the hull and the bridge.C、A vessel is made up of the hull and the forecastle.

()(水密舱) are in the hull.A、Gastight compartmentsB、Watertight compartmentsC、Water compartmentsD、Tight compartments

单选题In vessel construction,a greater number of watertight bulkheads results in().Aincreased capacity to set flooding boundariesBdecreased capacity to set flooding boundariesCreduced compartmentationDgreater deck load capacity

单选题The hull is divided up into a number of watertight compartments by().Ainner bottom plating and longitudinalsBdecks and bulkheadsCdouble bottom girdersDtopside and hopper tank sloping plating and longitudinals

单选题船体被甲板和舱壁分隔。()AThe hull is divided by decks and bulwarks.BThe hull is divided by decks and bulkheads.CThe hull is divided by engine room and bulkheads.DThe hull is divided by decks and holds.

单选题Which of following physical abilities is not required as to the routine movement around a vessel?()AMaintain balance and move with agilityBClimb up and down vertical ladders and stairwaysCOpen and close watertight doorsDTake part in vessel evacuation procedures

单选题船舶由船体和上层建筑组成。()AA vessel is made up of the hull and the superstructure.BA vessel is made up of the hull and the bridge.CA vessel is made up of the hull and the forecastle.

单选题Reserve buoyancy is().Aalso called GMBthe void portion of the ship below the waterline which is enclosed and watertightCaffected by the number of transverse watertight bulkheadsDthe watertight portion of a vessel above the waterline

单选题The total of such areas gets divided _______ between the total number of flats per floor: the larger the number of flats per floor, the lesser is this area _______ gets added to the area of the flat.Asufficiently; whereBproportionately; thatCequally; asDadequately; when

单选题According to the way the steering gear is operated, the steering gear may be divided into: hand - steering, () and automatic steering.Ahydraulic steeringBfollow-up steeringCremote control steeringDair controlled steering

填空题The emphasis of the product perspective on grammar is on the component parts of the language system, divided up into separate forms. Each form is the()of the grammarian’s analysis.

单选题How are riveted lap joints made watertight().AThe faying surfaces are coated with white lead(or similar product)before the rivets are setBA sealing weld bead of 1/8 or less pitch is run along the plate edgeCThe plate edge is split close to an adjacent plate and mechanically forced into contact with the adjacent plateDA properly riveted joint will be watertight; any leakage is stopped by setting up on the rivets

单选题During jacking operations and transit,empty void spaces in the hull of a jack up ship provide().AbuoyancyBextra storage spaceCadditional tank capacityDreduced stability

单选题English classroom activities for elementary and middle schools can be divided into four types: start-up, language learning,____ and summary.Alanguage performanceBlanguage accumulatingClanguage acquisitionDlanguage memorizing

单选题船体被划分为一系列水密隔舱。()AThe hull is divided into a number of watertight compartments.BThe hull is divided into a number of gastight compartments.CThe hull is divided into a number of water compartments.DThe hull is divided into a number of tight compartments.