单选题How are riveted lap joints made watertight().AThe faying surfaces are coated with white lead(or similar product)before the rivets are setBA sealing weld bead of 1/8 or less pitch is run along the plate edgeCThe plate edge is split close to an adjacent plate and mechanically forced into contact with the adjacent plateDA properly riveted joint will be watertight; any leakage is stopped by setting up on the rivets
单选题
How are riveted lap joints made watertight().
A
The faying surfaces are coated with white lead(or similar product)before the rivets are set
B
A sealing weld bead of 1/8 or less pitch is run along the plate edge
C
The plate edge is split close to an adjacent plate and mechanically forced into contact with the adjacent plate
D
A properly riveted joint will be watertight; any leakage is stopped by setting up on the rivets
参考解析
解析:
暂无解析
相关考题:
-How do you deal with the disagreement between the company and the customers? -The key ____ the problem is to meet the demand ____ by the customers. A、to solvingB、 makingC、 to solvingD、 madeE、 to solveF、 makingG、 to solveH、 made
He didn't have any curiosity ____ how his theory made TV possible. A. in observeB. observeC. to observeD. in observing
What are you recommended to answer the question tell me about yourself, if you are seeking for your first job?A.Speak much about how that job appeals to you and caused you to apply for it.B.Speak much about how your enthusiasm about an area has driven you to want that job.C.Speak much about how a book you’ve read or a person you’ve known motivated you to get that job.D.Speak much about how your past experiences made you decide to compete for that job.
Allowances may be made for the expansion and contraction in piping by the use of expansion joints or ().A.UnionsB.Retractable flangesC.Union bulkhead fittingsD.Bends or loops in the line
The use of liners in riveted construction is eliminated by using ______.A.lapped constructionB.strapped constructionC.joggled constructionD.belted construction
What is NOT a requirement of cargo piping installed in tank vessels carrying grade D or E cargo ONLY ________.A.The cargo piping system shall be fixedB.Flanged joints shall be used for pipe sizes exceeding 2 inches in diameterC.Piping through bunker spaces may be run through a pipe tunnelD.Connections at bulkheads must be made so that the plating does not form part of a flanged joint
Regulations define the bulkhead deck as ______.(subdivision and stability regulations)A.any deck extending from stem to sternB.the uppermost deck to which transverse watertight bulkheads extendC.the lowermost deck to which transverse watertight bulkheads extendD.the uppermost complete deck
The type of joint formed when an edge of one plate is laid over the edge of the plate to which it is riveted is a ______.A.Grip jointB.Strap jointC.Thread jointD.Lap joint
The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a ______.A.StringB.StandC.JointD.Standpipe
After riveting is completed, the joints on the shell of a vessel are generally made watertight by________.A.fayingB.caulkingC.felt or canvas packingD.red lead
A scientist often reaches a dead end that leads to no alternatives in research and has to go back and determine if all the____made are true to how the world operates.A.equationsB.principlesC.assumptionsD.theories
单选题After riveting is completed, the joints on the shell of a vessel are generally made watertight by().AfayingBcaulkingCfelt or canvas packingDred lead
单选题How are custom controls made?()ABy assembling existing controlsBBy combining multipleXPages togetherCBy creating a brand new widget from scratchDBy writing the code for a brand new control
单选题If no gaskets are used in the piping joints of a Freon system, the joints must be()Afinished jointsBwelded jointsCground jointsDsoldered joints
单选题Reserve buoyancy is().Aalso called GMBthe void portion of the ship below the waterline which is enclosed and watertightCaffected by the number of transverse watertight bulkheadsDthe watertight portion of a vessel above the waterline
单选题The connected joints of pipe,usually made of three joints of pipe approximately 90 feet long,racked in the derrick when making a trip are called a().AstringBstandCjointDstandpipe
单选题When riveted joints occur at the ends of plating they are called().AtrailersBterminalsCseamsDbutts
单选题The use of liners in riveted construction is eliminated by using().Alapped constructionBstrapped constructionCjoggled constructionDbelted construction
单选题The most critical part of the bunkering operations, which can result in an oil spill, is when the ()Ahose joints are made upBtanks are being topped offCsystem is being lined upDpumping operation is first started
单选题Structural bulkheads on a ship are usually().AcontinuousBwatertightCtransverseDnon-watertight
单选题According to the ship emergency plan, when average accident happened and the captain made the decision to withdraw from the engine room before leaving the engine room, the wrong operation is that ()Athe chief engineer leaves the engineer room with the engine room log book at firstBreleasing compressed air in the air receiver and closing the watertight doorCstopping all the running machineries and electric devicesDclosing the quick-closing valves of all the oil tanks, stopping the boiler and releasing gas
单选题What is an Advance Directive?AA decision made by a doctor on how to end a patient’s life.BA hospital document on how to treat a terminally ill patient.CA wish made by a patient on how he will be medically treated.DA law that prohibits mercy killing.
单选题In usual marine applications, bellows joints are designed and fitted to accommodate straight line axial movement only and the associated piping requires adequate anchors and guides to prevent misalignmentAccording to the above sentence, which of the following statements is true?()AThe marine bellows joints are attached in the accommodation onlyBThe bellows joints should be attached to anchorsCThe associated piping should be thrown into the water like as anchorsDThe connecting piping with the joints should be fixed firmly
单选题A “liner” in riveted construction of a vessel is a(n) ().Asmall plate which fills the aperture between riveted strakes and the vessel framingBbacking plate which is used to level the strakes while riveting,and then removedCinternal frame to which the side shell is rivetedDseam that is welded after riveting is completed