单选题What is required to complete this form?AGovernment authorizationBAn identification photoCProof of employmentDA separate instructional booklet

单选题
What is required to complete this form?
A

Government authorization

B

An identification photo

C

Proof of employment

D

A separate instructional booklet


参考解析

解析:
通过第5条括号里的内容See pg.77 of the directions for this form可知填写该表格时需要参考另外的填写指南,故选D。

相关考题:

In what form. are the reserves required to he held?A.In the form. of currency and coin on the premises.B.In the form. of vault cash.C.In a deposit at a regional Federal Reserve Bank.D.All of the above.

A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?() A.0B.1C.2D.4

A Router with a BRI/T interface will be used for an ISDN Connection what other ISDN device is required to complete this connection? () A.TE1B.TE2C.NT1D.NT2

A router with a serial interface will be used for an ISDN link.What other function group devices are required to complete the connection to the service provider? () A. TE1B. TE2C. TAD. NT1E. NT2

A network administrator is planning a network installation for a large organization.The design requires 100 separate subnetworks,so the company has acquired a Class B network address.What subnet mask will provide the 100 subnetworks required, if 500 usable host addresses are required per subnet?()A. 255.255.240.0B. 255.255.248.0C. 255.255.252.0D. 255.255.254.0E. 255.255.255.0F. 255.255.255.192

Project(69)Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.A.IntegrationB.ScopeC.ConfigurationD.Requirement

______ is not a proper form for Muster lists.A.A separate card given to each crew memberB.A separate instruction booklet given to each crew memberC.A card fixed in each cabin with instructions for the occupant of the cabinD.A well prepared notice posted on water-tight doors and/or in chart-room

Students taking the entrance exam are required to provide their student ______ number.A. identifyB. identifiableC. identifiablyD. identification

Income Tax Form for the Year 2006Name:Government Identification Number:Home Address:1. Total wages earned in 2006 (this information should have been provided by your employer):2. Amount of tax on income stated on line 1(See Pg.62 of the directions for this form to de-termine the correct tax amount):3. Tax withheld from pay in 2006(this information should have been provided by your em-ployer):4. Subtract line 3 from line 2:5. If line 4 is a negative number, you have overpaid. You will receive a refund in the amount stated on line 4. (See pg.77 of the directions for this form to learn how to receive your refund.)6. If line 4 is a positive number, this is the amount of income tax you owe (See pg.78 of the directions for this form for possible remittance methods).Signature: Date:What is required to complete this form?A.Government authorizationB.An identification photoC.Proof of employmentD.A separate instructional booklet

A router with a serial interface will be used for an ISDN link.What other function group devices are required to complete the connection to the service provider? ()A、TE1B、TE2C、TAD、NT1E、NT2

A Router with a BRI/T interface will be used for an ISDN Connection what other ISDN device is required to complete this connection? ()A、TE1B、TE2C、NT1D、NT2

A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()A、0B、1C、2D、4

Project () Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.A、IntegrationB、ScopeC、ConfigurationD、Requirement

During Company.com planning session,Company.com presents the details of the current  Network design. The network design serves four separate company facilities, each on as separate subnet. As part of a disaster recovery plan, the customer is evaluating the use of HACMP. Specifically, the have reviewed IPAT via IP aliasing and are questioning the number of IP subnets required.  Given the customer’s current configuration,what is the recommended minimum number of IP subnets that would be required?()A、 4B、 5C、 6D、 8

A customer has two separate storage islands and is planning to implement an SVC to provide forFlashCopy between the two islands. What is the minimum number of inter-switch links (ISLs) thatare required?()A、0B、1C、2D、4

单选题A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()A0B1C2D4

单选题During Company.com planning session,Company.com presents the details of the current  Network design. The network design serves four separate company facilities, each on as separate subnet. As part of a disaster recovery plan, the customer is evaluating the use of HACMP. Specifically, the have reviewed IPAT via IP aliasing and are questioning the number of IP subnets required.  Given the customer’s current configuration,what is the recommended minimum number of IP subnets that would be required?()A 4B 5C 6D 8

单选题A network administrator is planning a network installation for a large organization.The design requires 100 separate subnetworks,so the company has acquired a Class B network address.What subnet mask will provide the 100 subnetworks required, if 500 usable host addresses are required per subnet?()A255.255.240.0B255.255.248.0C255.255.252.0D255.255.254.0E255.255.255.0F255.255.255.192

单选题Project () Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.AIntegrationBScopeCConfigurationDRequirement

单选题A customer has two separate storage islands and is planning to implement an SVC to provide forFlashCopy between the two islands. What is the minimum number of inter-switch links (ISLs) thatare required?()A0B1C2D4

单选题Project()Management includes the processes required to ensure that theproj ect includes all the work required, and only the work required, to complete the project successfully.AIntegrationBScopeCConfigurationDRequirement

单选题A customer needs approximately 15 to 20 wireless APs for RF coverage. Given that the customer is going to use the 1010 light weight AP with the advanced feature set, what other product is required to complete this operational functionality? ()A 2700B WLSEC 4124D 2006E 4112

单选题What is required to complete this form?AGovernment authorizationBAn identification photoCProof of employmentDA separate instructional booklet

单选题In () technology, two separate and complete processing units run in parallel on a Single chip.AHyper-threadingBCachingCMulti-taskingDDual-core

单选题Concerning the identification signal for a pilot vessel,in fog,which statement is TRUE?()AWhen at anchor,the pilot vessel is only required to sound anchor signalsBThe identification signal must be sounded any time the pilot vessel is underwayCThe pilot vessel may only sound the identity signal when making wayDAll of the above

单选题A Router with a BRI/T interface will be used for an ISDN Connection what other ISDN device is required to complete this connection? ()ATE1BTE2CNT1DNT2

单选题Vessels are required to illuminate their()to aid identification.AfunnelsBtunnelsCchannelsDhandles

单选题The period of a lighted aid to navigation refers to the().Adate of construction or establishmentBlength of time between flashes of the lightCtime required for the longest flash of each cycleDtime required for the light to complete each cycle