单选题A customer needs to share large files across three Power Systems servers to create and validate complex automotive designs. What IBM solution should be recommended?()APowerHA SystemMirrorBPeer to Peer Remote CopyCGeneral Parallel File SystemsDParallel Operating Environment

单选题
A customer needs to share large files across three Power Systems servers to create and validate complex automotive designs. What IBM solution should be recommended?()
A

PowerHA SystemMirror

B

Peer to Peer Remote Copy

C

General Parallel File Systems

D

Parallel Operating Environment


参考解析

解析: 暂无解析

相关考题:

A customer needs to achieve a very aggressive RTO of 30 minutes or less. A critical requirement is a continuous availability and disaster recovery solution for the mainframe environment.What IBM solution should be recommended to this customer?()A. Metro MirrorB. Metro/Global MirrorC. Geographically Dispersed Open Servers (GDOS)D. Geographically Dispersed ParallelSysplex (GDPS)

While discussing the customer’s environment the storage specialist discovers that the customerhas both Windows and UNIX servers running various applications. The customer is looking for acost effective 10 TB solution that includes a mirrored site to meet their Disaster Recovery plan.Which of the following solutions should be recommended?()A、DS5020 system running Metro Mirror and Volume CopyB、Storwize V7000 running FlashCopy and Volume CopyC、DS5020 system runningFlashCopy and Enhanced Remote MirrorD、DS5300 system runningFlashCopy and Enhanced Remote Mirror

The pSeries sales representative has done an excellent job in educating the customer on the benefits of working with IBM.  The customer is planning to implement their first ERP application.  This new application will be critical to running their business.  The customer has only a competitor’s UNIX systemcurrently installed.  They are interested in obtaining a proposal from IBM. In addition to the AIX hardware and HACMP software, what else should be included in the IBM proposal for the new ERP solution?()A、I/T services and education to help with the implementation of the hardware and softwareB、A Supportline specialist to work directly with the customer to manage any issues that ariseC、The services required to move the currently installed applications from the competitor’s systems to the IBM systemsD、A slimmed down solution to ensure that the IBM solution is less expensive than the competitor’s solution

A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.  Which IBM BladeCenter Chassis should be recommended? ()A、BladeCenter EB、BladeCenter HC、BladeCenter TD、BladeCenter HT

A customer needs to achieve a very aggressive RTO of 30 minutes or less. A critical requirement is a continuous availability and disaster recovery solution for the mainframe environment. What IBM solution should be recommended to this customer?()A、Metro MirrorB、Metro/Global MirrorC、Geographically Dispersed Open Servers (GDOS)D、Geographically Dispersed ParallelSysplex (GDPS)

A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()A、An IBM BladeCenter H chassis for the JS22 Blade serversB、A concurrent KVM daughter cardC、A pair of IBM BladeCenter Power SuppliesD、A second Management Module

A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700.  They would like to upgrade and plan for 40 TB capacity.  The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()A、What are the plans for Disaster Recovery? B、What are the plans for data migration? C、Would iSCSI meet your needs? D、How much space is available in the current storage systems?

After putting together a configuration that meets customer’s requirements, a TDA is suggested. The customer is not familiar with the TDA process and asks why this should be done. This of the following is the benefit of TDA?()A、 A TDA are recommended only for high end hardware and very large or complex business opportunitiesB、 A TDA will ensure the solution and configuration are complete and technically sound and meet customer requirementsC、 A TDA will guarantee that the hardware will work in customer’s environment at the volumes projectedD、 A TDA brings an IBM technician onsite to properly inspect and installed hardware and related software

A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers.  Which of the following should the Sales Specialist emphasize to address the pricing difference?()A、Higher rack density that reduces data center footprintsB、Internal upgrades that only IBM can offerC、Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches D、The Rear Door Heat eXchanger that only IBM can offer

A customer needs to share large files across three Power Systems servers to create and validate complex automotive designs. What IBM solution should be recommended?()A、PowerHA SystemMirrorB、Peer to Peer Remote CopyC、General Parallel File SystemsD、Parallel Operating Environment

A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems.  They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems.  What is a key requirement that they need to plan for with the new HMC?()A、A desk, as it not rack mountableB、Ethernet connections to the POWER5 systemsC、Serial connections to the POWER5 systemsD、USB connections for the keyboard and mouse

A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()A、What are Disaster RecoveryplansB、What are plans for datamigrationC、What storage system space isavailableD、DoesiSCSI meet the needs

The account team is putting together a very complex solution for the customer.  During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified.  What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()A、Use eConfig to configure and validate each pSeries and p5 system.B、Engage Advanced Technical Support to review any outstanding technical issues.C、Confirm with the customer that the solution design meets their requirements.D、Perform a Pre-Install Solution Assurance Review to validate required power requirements.

Which IBM software technology is a key component of SONAS?()A、 PowerHA B、 Tivoli Storage Manager (TSM)C、 Tivoli Productivity Center (TPC) D、 General Parallel File System (GPFS)

单选题A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()AAn IBM BladeCenter H chassis for the JS22 Blade serversBA concurrent KVM daughter cardCA pair of IBM BladeCenter Power SuppliesDA second Management Module

单选题An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()ATurn over current design to Techline to create configurationsBPerform knowledge transfer of design requirements to Business partner then disengageCWork with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)DWork with business partner to engage Techline to create configurations

单选题A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()AVerification of the expected performance of the new solution.BA document used by IBM manufacturing to build and ship the system solution.CAn IBM Quality Assurance Certificate which is supplied to the customer with the system.DA list of actions that are recommended to reduce risk and create a successful implementation.

单选题A route-based VPN is required for which scenario? ()Awhen the remote VPN peer is behind a NAT deviceBwhen multiple networks need to be reached across the tunnelCwhen the remote VPN peer is a dialup or remote access clientDwhen a dynamic routing protocol such as OSPF is required across the VPN

单选题The account team is putting together a very complex solution for the customer.  During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified.  What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()AUse eConfig to configure and validate each pSeries and p5 system.BEngage Advanced Technical Support to review any outstanding technical issues.CConfirm with the customer that the solution design meets their requirements.DPerform a Pre-Install Solution Assurance Review to validate required power requirements.

单选题A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.  Which IBM BladeCenter Chassis should be recommended? ()ABladeCenter EBBladeCenter HCBladeCenter TDBladeCenter HT

单选题A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers.  Which of the following should the Sales Specialist emphasize to address the pricing difference?()AHigher rack density that reduces data center footprintsBInternal upgrades that only IBM can offerCTotal Cost of Ownership (TCO) related to innovative components such as Integrated Switches DThe Rear Door Heat eXchanger that only IBM can offer

单选题A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()AWhat are Disaster RecoveryplansBWhat are plans for datamigrationCWhat storage system space isavailableDDoesiSCSI meet the needs

单选题A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700.  They would like to upgrade and plan for 40 TB capacity.  The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()AWhat are the plans for Disaster Recovery? BWhat are the plans for data migration? CWould iSCSI meet your needs? DHow much space is available in the current storage systems?

单选题A customer needs to achieve a very aggressive RTO of 30 minutes or less. A critical requirement is a continuous availability and disaster recovery solution for the mainframe environment. What IBM solution should be recommended to this customer?()AMetro MirrorBMetro/Global MirrorCGeographically Dispersed Open Servers (GDOS)DGeographically Dispersed ParallelSysplex (GDPS)

单选题Which IBM software technology is a key component of SONAS?()A PowerHA B Tivoli Storage Manager (TSM)C Tivoli Productivity Center (TPC) D General Parallel File System (GPFS)

单选题After putting together a configuration that meets customer’s requirements, a TDA is suggested. The customer is not familiar with the TDA process and asks why this should be done. This of the following is the benefit of TDA?()A A TDA are recommended only for high end hardware and very large or complex business opportunitiesB A TDA will ensure the solution and configuration are complete and technically sound and meet customer requirementsC A TDA will guarantee that the hardware will work in customer’s environment at the volumes projectedD A TDA brings an IBM technician onsite to properly inspect and installed hardware and related software

单选题A customer needs to share large files across three Power Systems servers to create and validate complex automotive designs. What IBM solution should be recommended?()APowerHA SystemMirrorBPeer to Peer Remote CopyCGeneral Parallel File SystemsDParallel Operating Environment