单选题A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()AVerification of the expected performance of the new solution.BA document used by IBM manufacturing to build and ship the system solution.CAn IBM Quality Assurance Certificate which is supplied to the customer with the system.DA list of actions that are recommended to reduce risk and create a successful implementation.
单选题
A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()
A
Verification of the expected performance of the new solution.
B
A document used by IBM manufacturing to build and ship the system solution.
C
An IBM Quality Assurance Certificate which is supplied to the customer with the system.
D
A list of actions that are recommended to reduce risk and create a successful implementation.
参考解析
解析:
暂无解析
相关考题:
The storage specialist has designed a very complex solution with the customer, and needs toverify that all associated equipment will work as expected. Which of the following is designed tohelp lower support cost and improve customer satisfaction?()A、ATScon MonitorB、Technical and Delivery AssessmentC、System Storage Interoperations CenterD、Standalone Solutions Configuration Tool
Which of the following statements best describes a Pre-sales Solution Assurance Review?()A、An account team proposal reviewB、An installation planning meetingC、A solution design development methodologyD、A technical inspection of a completed solution design
After visiting several customers, the pSeries technical specialist returns to the office late in the day and makes a list of the various customer requests. The specialist decided to complete at least one task before leaving for the day. Which of the following is most important to complete immediately?()A、Send a flyer on new p5-520. B、Provide shipment delivery status.C、Order a new system per the purchase order.D、Retrieve and send a whitepaper on SCSI performance.
A customer recently installed new a SAN with an IBM System Storage DS8700 and several open systems servers to address a need for storage consolidation and still provide good response time. They have asked the Business Partner technical representative for the most complete IBM product that would allow them to do performance reporting of the new SAN environment. What is the best solution()A、Tivoli Storage ManagerB、Tivoli Storage Productivity Center for DiskC、Tivoli Storage Productivity Center Basic EditionD、Tivoli Storage Productivity Center Standard Edition
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()A、The EMC storage specialist has not participated in the TDA meetingB、The FC HBAs are 4 Gbps technologyC、The Technical and Delivery Assessment review actions were not executedD、The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
A customer recently installed new SAN with an IBM System Storage DS8300 and several open systems servers to address a need for storage consolidation and still provide good response time. They have asked the Business Partner technical representative for the most complete IBM product that would allow them to do performance reporting of the new SAN environment. What is the best solution()A、Tivoli Storage ManagerB、Total Productivity Productivity Center for DiskC、Total Productivity Center Basic EditionD、Total Storage Productivity Center Standard Edition
When performing an expert level pre-install Technical Delivery Assessment (TDA), which team member has the responsibility for assigning, tracking and updating the completion of action items during the TDA process?()A、The Delivery LeaderB、The Opportunity OwnerC、The Solution DesignerD、The Subject Matter Expert
What is the primary purpose of the Technical and Delivery Assessment (TDA)?()A、Identify, assess, and mitigate technical risks.B、Verify pricing and gather components for special bid submission.C、Verify the proposed solution will fit within the customer's budget.D、Review competitive offerings, system performance and delivery schedules.
A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()A、Verification of the expected performance of the new solution.B、A document used by IBM manufacturing to build and ship the system solution.C、An IBM Quality Assurance Certificate which is supplied to the customer with the system.D、A list of actions that are recommended to reduce risk and create a successful implementation.
An IBM System x Technical Expert has a prospective customer who is very excited about X5 and they are working on configurations. During the process the customer has changed the design numerous times and has significantly increased the scope. They recently selected a Business Partner who has been involved in the last few design changes. What steps should be taken to make sure the customer is satisfied with the solution?()A、Turn over current design to Techline to create configurations B、Perform knowledge transfer of design requirements to Business Partner then disengage C、Work with business partner to engage Techline to assist with configurations and request Technical and Delivery Assessment (TDA) D、Work with business partner to engage Techline to create configurations
An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()A、Turn over current design to Techline to create configurationsB、Perform knowledge transfer of design requirements to Business partner then disengageC、Work with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)D、Work with business partner to engage Techline to create configurations
A Business Partner is proposing the installation an IBM XIV Storage System at a customer location. What is the best time to discuss floor space requirements for the solution()A、during the Technical Delivery and AssessmentB、during installation of the equipmentC、prior to delivery of the XIVD、during the solution proposal
What is the correct stage in the sales process for a Pre-Sales Technical Delivery Assessment (TDA)? ()A、Before the first solution design meeting with the customerB、After the solution design proposal is submitted to manufacturing for reviewC、Once the customer has supplied the solution design specifications to the sales teamD、After the solution design is completed and before the proposal is submitted to the customer
单选题A customer recently installed new SAN with an IBM System Storage DS8300 and several open systems servers to address a need for storage consolidation and still provide good response time. They have asked the Business Partner technical representative for the most complete IBM product that would allow them to do performance reporting of the new SAN environment. What is the best solution()ATivoli Storage ManagerBTotal Productivity Productivity Center for DiskCTotal Productivity Center Basic EditionDTotal Storage Productivity Center Standard Edition
单选题After visiting several customers, the pSeries technical specialist returns to the office late in the day and makes a list of the various customer requests. The specialist decided to complete at least one task before leaving for the day. Which of the following is most important to complete immediately?()ASend a flyer on new p5-520. BProvide shipment delivery status.COrder a new system per the purchase order.DRetrieve and send a whitepaper on SCSI performance.
单选题What is the primary purpose of the Technical and Delivery Assessment (TDA)?()AIdentify, assess, and mitigate technical risks.BVerify pricing and gather components for special bid submission.CVerify the proposed solution will fit within the customer's budget.DReview competitive offerings, system performance and delivery schedules.
单选题An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()ATurn over current design to Techline to create configurationsBPerform knowledge transfer of design requirements to Business partner then disengageCWork with Business Partner to engage Techline to assist with configuration and request technical and Delivery Assessment (TDA)DWork with business partner to engage Techline to create configurations
单选题The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()AUse eConfig to configure and validate each pSeries and p5 system.BEngage Advanced Technical Support to review any outstanding technical issues.CConfirm with the customer that the solution design meets their requirements.DPerform a Pre-Install Solution Assurance Review to validate required power requirements.
单选题An IBM System x Technical Expert has a prospective customer who is very excited about X5 and they are working on configurations. During the process the customer has changed the design numerous times and has significantly increased the scope. They recently selected a Business Partner who has been involved in the last few design changes. What steps should be taken to make sure the customer is satisfied with the solution?()ATurn over current design to Techline to create configurations BPerform knowledge transfer of design requirements to Business Partner then disengage CWork with business partner to engage Techline to assist with configurations and request Technical and Delivery Assessment (TDA) DWork with business partner to engage Techline to create configurations
单选题When performing an expert level pre-install Technical Delivery Assessment (TDA), which team member has the responsibility for assigning, tracking and updating the completion of action items during the TDA process?()AThe Delivery LeaderBThe Opportunity OwnerCThe Solution DesignerDThe Subject Matter Expert
单选题After putting together a configuration that meets customer’s requirements, a TDA is suggested. The customer is not familiar with the TDA process and asks why this should be done. This of the following is the benefit of TDA?()A A TDA are recommended only for high end hardware and very large or complex business opportunitiesB A TDA will ensure the solution and configuration are complete and technically sound and meet customer requirementsC A TDA will guarantee that the hardware will work in customer’s environment at the volumes projectedD A TDA brings an IBM technician onsite to properly inspect and installed hardware and related software
单选题An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()AThe EMC storage specialist has not participated in the TDA meetingBThe FC HBAs are 4 Gbps technologyCThe Technical and Delivery Assessment review actions were not executedDThe customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
单选题A customer recently installed new a SAN with an IBM System Storage DS8700 and several open systems servers to address a need for storage consolidation and still provide good response time. They have asked the Business Partner technical representative for the most complete IBM product that would allow them to do performance reporting of the new SAN environment. What is the best solution()ATivoli Storage ManagerBTivoli Storage Productivity Center for DiskCTivoli Storage Productivity Center Basic EditionDTivoli Storage Productivity Center Standard Edition
单选题A Business Partner is proposing the installation an IBM XIV Storage System at a customer location. What is the best time to discuss floor space requirements for the solution()Aduring the Technical Delivery and AssessmentBduring installation of the equipmentCprior to delivery of the XIVDduring the solution proposal
单选题What is the correct stage in the sales process for a Pre-Sales Technical Delivery Assessment (TDA)? ()ABefore the first solution design meeting with the customerBAfter the solution design proposal is submitted to manufacturing for reviewCOnce the customer has supplied the solution design specifications to the sales teamDAfter the solution design is completed and before the proposal is submitted to the customer
单选题Which of the following statements best describes a Pre-sales Solution Assurance Review?()AAn account team proposal reviewBAn installation planning meetingCA solution design development methodologyDA technical inspection of a completed solution design