The stages within the development phase of the software life cycle are( ).软件生命周期开发阶段的阶段是A.design,analysis,implementation,and testing设计、分析、实现和测试B.analysis,design,implementation,and testing分析、设计、实现和测试C.analysis,design,testing,and implementation分析、设计、测试和实现D.design,analysis,testing,and implementation设计、分析、测试和实现

The stages within the development phase of the software life cycle are( ).
软件生命周期开发阶段的阶段是

A.design,analysis,implementation,and testing
设计、分析、实现和测试
B.analysis,design,implementation,and testing
分析、设计、实现和测试
C.analysis,design,testing,and implementation
分析、设计、测试和实现
D.design,analysis,testing,and implementation
设计、分析、测试和实现

参考解析

解析:属于软件生命周期中开发阶段的是分析、设计、实施和测试。

相关考题:

Which of the following are included in the Acquisition phase(s) of the project life cycle.A . concept and developmentB . development and planningC . execution and phase-outD . planning and implementationE . concept and planning

Feasibility studies occur in which life cycle phase (s)?A.ConceptualB.Conceptual or DevelopmentC.ExecutionD.Preliminary planningE.any life cycle phase

The project stakeholders should be actively involved with the _____ phase(s) of the life cycle.A.ConceptualB.Development.C.ExecutionD.FinishE.All of the above.

Typically, during which phase in a project life cycle are most of the project expenses incurred.A . Concept phaseB . Development of design phaseC . Execution phase.D . Termination phase.E . None of the above

67 The project stakeholders should be actively involved with the _____ phase(s) of the life cycle. A. ConceptualB. Development.C. ExecutionD. FinishE. All of the above

141 Feasibility studies occur in which life cycle phase (s)?A. ConceptualB. Conceptual or DevelopmentC. ExecutionD. Preliminary planningE. any life cycle phase

6 Typically, during which phase in a project life cycle are most of the project expenses incurred. A. Concept phaseB Development of design phaseC. Execution phase.D. Termination phase.E. None of the above

88 Typically, during which phase in a project life cycle are most of the project expenses incurred. A. Concept phaseB. Development of design phaseC. Execution phase.D. Termination phase.E. None of the above

82 Which of the following are included in the Acquisition phase(s) of the project life cycle.A. concept and developmentB. development and planningC. execution and phase-outD. planning and implementationE. concept and planning

● Feasibility studies occur in which life cycle phase (s)?A ConceptualB Conceptual or DevelopmentC ExecutionD Preliminary planningE any life cycle phase

● The project stakeholders should be actively involved with the _____ phase(s) of the life cycle.A ConceptualB Development.C ExecutionD FinishE All of the above.

●In which phase of the software engineering process is the Software Requirements Specification developed? (68) .(68) A.development phaseB.engineering phaseC.maintenance phaseD.Definition phase

In which phase of the software engineering process is the Software Requirements Specification developed?A. definition phaseB.engineeringC.maintenanceD.development phase

●As an important phase in software development,software design is the continuation of software requirement analysis phase. (69) .Ⅰ.software structureⅡ.software documentⅢ.software moduleⅣ.software procedureWhich of the following should be included in software design phase?(69) A.Ⅱ andⅢB.Ⅰ andⅡC.Ⅰ,Ⅱ andⅢD.All

As an important phase in software development, software design is the continuation of software requirement analysis phasE.Ⅰ.software structureⅡ.software procedureⅢ.software moduleⅣ.software documentwhich of the following should be included in software design phase?A.Ⅰand ⅡB.Ⅱand ⅢC.Ⅰ,Ⅱ and ⅢD.All

Software document is an important part of software and a basis of software's development phase.It also influnces software'sA.ReusabilityB.MaintanenceC.ExpansibilityD.Portability

● Consumption of the total life-cycle effort in software maintenance is (71) that in software development.(71)A.less thanB.larger thanC.equal or less thanD.equal or larger than

Which phase of the software development requires the most development time?A.the design phaseB.the testing phaseC.the maintenance phaseD.the development phase

Consumption of the total life-cycle effort in software maintenance is(71)that in software development.A.less thanB.larger thanC.equal or less thanD.equal or larger than

The stages within the development phase of the software life cycle are ( 71 ).A.design, analysis, implementation, and testingB.analysis, design, implementation, and testingC.analysis, design, testing, and implementationD.design, analysis, testing, and implementation

Which of the following statements is correct?A.The definition phase results in the Software Requirements Specification.B.Testing is optional in software life cycle.C.CASE tools can only aid in the design phase of a software life cycle.D.A change during a later phase does not require the documentation of all earlier phases to be updated.

The most expensive phase of life cycle costing is ( ) .A.TerminationB.Applied researchC.ProductionD.Operations and support

The life cycle ofa project is a description of the various phases of the project from the beginning to the end.One of the followings is not a phase of the traditional project life cycle,itis_( )A.devclopmentB.conceptC.system analysisD.implementation

Consumption of the total life-cycle effort in software maintenance is( )that in software development.A.less thanB.larger thanC.equal or less thanD.equal or larger than

The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycle, It is( ).A.developmentB.conceptC.system analysisD.implementation

The life cycle of aproject is a description of the various phases of the project from thebeginning to the end. One of the followings is not a phase of the traditionalproject life cycle, It is( ). A.development B.concept C.system analysis D.implementation

单选题Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.空白(2)处应选择()AactivityBprocedureCprocessDprogress