The stages within the development phase of the software life cycle are ( 71 ).A.design, analysis, implementation, and testingB.analysis, design, implementation, and testingC.analysis, design, testing, and implementationD.design, analysis, testing, and implementation

The stages within the development phase of the software life cycle are ( 71 ).

A.design, analysis, implementation, and testing

B.analysis, design, implementation, and testing

C.analysis, design, testing, and implementation

D.design, analysis, testing, and implementation


相关考题:

The project stakeholders should be actively involved with the _____ phase(s) of the life cycle.A.ConceptualB.Development.C.ExecutionD.FinishE.All of the above.

Network schedules are prepared during the _____ phase and updated during the _____ phase.A.Conceptual, execution.B.Development, implementation.C.Development, close-out.D.Implementation, close-out.E.Planning, finishing.

67 The project stakeholders should be actively involved with the _____ phase(s) of the life cycle. A. ConceptualB. Development.C. ExecutionD. FinishE. All of the above

148 Network schedules are prepared during the _____ phase and updated during the _____ phase. A. Conceptual, execution.B. Development, implementation.C. Development, close-out.D. Implementation, close-out.E. Planning, finishing

30 Network schedules are prepared during the _____ phase and updated during the _____ phase. A. Conceptual, execution.B. Development, implementation.C. Development, close-out.D. Implementation, close-out.E. Planning, finishing

149 The project stakeholders should be actively involved with the _____ phase(s) of the life cycle. A. ConceptualB. Development.C. ExecutionD. FinishE. All of the above

● Software (71) refers to that the software to meet the specification must be produced.(71)A. testB. supportC. developmentD. process

Software engineering is the study and an application of engineering to the design,development,and(71)of software.A.maintenance B.serviceC.runningD.deployment

1、()在西门子802D系统中指的是平面铣削循环。A.CYCLE71B.CYCLE73C.CYCLE95D.CYCLE81

()在西门子802D系统中指的是平面铣削循环。A.CYCLE71B.CYCLE73C.CYCLE95D.CYCLE81