Oil is carried in ().A、tanksB、tankersC、chemical carriersD、holds
Oil is carried in ().
- A、tanks
- B、tankers
- C、chemical carriers
- D、holds
相关考题:
Every possible test () to decide the nature of her illness. A、carries outB、carried outC、was carried outD、has carried out
They _________ the conversation in a friendly atmosphere.A、carried outB、carried onC、carried forwardD、carried with
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on theA.Navigation Log BookB.Engine Room Log BookC.Oil Record BookD.Muster List
Preventive maintenance______.A.should not be carried out during the watchesB.can only be carried out in portC.is a kind of maintenances carried out prior to the occurrenceD.is a kind of maintenances carried out after the occurrence
A shipboard oil pollution emergency plan is required of ______.A.all vessels, regardless of size and commercial applicationB.any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardC.an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveD.an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above
In the case of new crude oil tankers,the additional ballast permitted shall be carried in cargo tanks only if such tanks have been ______ before departure from an oil unloading port or terminal.A.inertedB.crude oil washedC.dilutedD.cleaned
Certificate of Fitness for the Carriage of Liquefied Gases in Bulk shall be carried on board by ______.A.gas carriers constructed on or after 1 July 1986B.gas carriers constructed before 1 July 1986C.All chemical tankersD.oil tankers of 150 gross tonnage and above
Certificate of insurance or other financial security in respect of civil liability for oil pollution damage shall be carried on board by ______.A.ships carrying more than 2000 tons of oil in bulk as cargoB.oil tankersC.bulk chemicals carriersD.liquefied gas carriers
Oil Record Book shall be carried on board by ______ which is engaged in voyages to ports or offshore terminals under the jurisdiction of other Parties to MARPOL 73/78.A.Oil tankerB.Bulk carrier of 400 gross tonnage and aboveC.Container vesselD.Passenger ship
Shipboard Oil Pollution Emergency Plan shall be carried on board by ______.A.Oil tanker of 150 gross tonnage and aboveB.Bulk carrierC.Container vesselD.Passenger ship
International Certificate of Fitness for the Carriage of Dangerous Chemicals in Bulk shall be carried on board by ______.A.chemical tankers constructed on or after 1 July 1986B.chemical tankers constructed before 1 July 1986C.All chemical tankersD.oil tankers of 150 gross tonnage and above
The port State control officer or the surveyor authorized by the port State Administration must be aware that ______ may be carried on product carriers.A.category A substancesB.crude oilC.certain“oil like”noxious liquid substancesD.category B,C and D substances
Goods stowed in containers ______ without notice.A.Shall be carried on deckB.Shall be carried under deckC.May be carried on or under deckD.May not be carried on or under deck
The equipment required to remove an on-deck oil spill on a barge transfering oil must either be carried on board or ______.A.on a tug standing byB.available by contract with the shore facilityC.kept at the shoreside hose connection during transferD.kept in a protected shoreside location readily accessible
单选题The cooling of the piston is carried out by circulating () across the underside of the crown and inside the ring belt or through specially shaped passages.Asea waterBscavenging airClubricating oilDfuel oil
单选题The port State control officer or the surveyor authorized by the port State Administration must be aware that()may be carried on product carriers.Acategory A substancesBcrude oilCcertain“oil like”noxious liquid substancesDcategory B,C and D substances
单选题A shipboard oil pollution emergency plan is required of ().Aall vessels, regardless of size and commercial applicationBany barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardCan oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveDan oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above
单选题A shipboard Oil Pollution Emergency Plan is required of().Aall vessels,regardless of size and commercial applicationBany barge or ship constructed or operated in such a manner that no oil in any form can be carried aboardCan oil tanker of 150 gross tons and above,or other ship of 400 gross tons and aboveDan oil tanker of 400 gross tons and above,or other ships of 150 gross tons and above
单选题Goods stowed in containers()without notice.Ashall be carried on deckBshall be carried under deckCmay be carried on or under deckDmay not be carried on or under deck
单选题The pollution prevention regulations do not apply to the transfer or discharge of ()Abunker fuel for use aboard shipBlubricating oil for use aboard shipCcoconut oil carried in tank vesselsDoily water from a ships bilges
单选题In motor ship, () is often used to recover some of the heat carried in the exhaust gases from the main engine.Aan diesel oil heaterBa waste heat boilerCa fresh water generatorDall the above
单选题() should be tested and adjusted when the boiler survey is carried out.AThe boiler oil tankBThe steam pipeCThe fire sideDThe safety valves
单选题Which of the following operating procedures should be carried out immediately after any diesel engine is started?()ATake all exhaust temperature readingBCheck the sump oil levelCVerify proper lube oil pressureDAll of the above
单选题Preventive maintenance ().Ashould not be carried out during the watchesBcan only be carried out in portCis a kind of maintenances carried out prior to the occurrenceDis a kind of maintenances carried out after the occurrence
单选题What monitoring device best indicates the load being carried by a diesel engine?()ALube oil pressure gaugeBJacket water temperature gaugeCTachometerDExhaust pyrometer
单选题Following an overhaul of a crosshead type diesel engine, the engine is jacked over with the turning gear as part of the pre-start procedure, which of the listed pre-start procedures should be carried out?()AEnsure proper cylinder lube oil flowBOpen all air space drain cocksCOpen all indicator valvesDall of the above
单选题In the case of new crude oil tankers,the additional ballast permitted shall be carried in cargo tanks only if such tanks have been()before departure from an oil unloading port or terminal.AinertedBcrude oil washedCdilutedDcleaned